| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.7 LAccepted-AOC | ₹42.7 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹45.3 L+₹2.6 L (6.00%)Rejected-Finance | ₹45.3 L+₹2.6 L (6.00%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹46.2 L+₹3.5 L (8.12%)Rejected-Finance | ₹46.2 L+₹3.5 L (8.12%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹47.0 L+₹4.3 L (9.96%)Rejected-Finance | ₹47.0 L+₹4.3 L (9.96%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹47.2 L+₹4.5 L (10.4%)Rejected-Finance | ₹47.2 L+₹4.5 L (10.4%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | M/s Harjas Construction & Waterproofing Co L2 | V CHINNA DURAI L8 | Nirman Construction Company L4 | Usha Builders L3 | ANITA VARMA ENTERPRISES L6 | SWASTHIK ENGINEERING WORKS L1 | M/s K Moorthi L5 | ABR Construction L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Removing & cleaning of blockage WC including WC trap of any description and in any position by removing sand/sludge/silt and other forein material deposited in it (either manually or mechanically) upto first manhole and making the sewage system functional to the entire satisfaction of Engr in Charge complete. | 300 | Each | 328 ₹98,400 | 360 ₹1,08,000 | 320 ₹96,000 Lowest | 375 ₹1,12,500 | 348 ₹1,04,400 | 320 ₹96,000 Lowest | 336 ₹1,00,800 | 340 ₹1,02,000 |
| 2.00 | Removing & cleaning of blockage from traps of bath rooms/ kitchen sink/ wash basin/ Urinal point and gully traps of any description and in any position by removing sand/sludge/silt and other forein material deposited in it (either manually or mechanically) upto first manhole and making the seweage system functional to the entire satisfaction of Engr in Charge complete. | 320 | Each | 340 ₹1,08,800 Lowest | 350 ₹1,12,000 | 364 ₹1,16,480 | 353 ₹1,12,960 | 410 ₹1,31,200 | 340 ₹1,08,800 Lowest | 380 ₹1,21,600 | 374 ₹1,19,680 |
| 3.00 | Taking out carefully the cover slab of gulley traps of any size and shape, depth and cleaning the block by removing the scum/sludge / any material to a distance exc. 250m and n.exc.500m and cleaning with fresh water placing the cover slab/ Grating in position all as directed by Eng-in-Charge. | 320 | Each | 200 ₹64,000 | 199 ₹63,680 | 215 ₹68,800 | 195 ₹62,400 | 210 ₹67,200 | 190 ₹60,800 Lowest | 199 ₹63,680 | 190 ₹60,800 Lowest |
| 4.00 | Cleaning of sewage lines using passing rubber ball through line to ensure all blockage perfectly clear or split bamboo with a gunny bag piece tied with bamboo with binding wire and inserting the bamboo in sewage lines of dia 100 mm and up to 200 mm through manhole/gully trap clear flow of sewage is observed in sewage pipe complete all as directed by Engr-in-charge. | 1,425 | RM | 165 ₹2,35,125 | 165 ₹2,35,125 | 150 ₹2,13,750 Lowest | 156 ₹2,22,300 | 175 ₹2,49,375 | 150 ₹2,13,750 Lowest | 170 ₹2,42,250 | 180 ₹2,56,500 |
| 5.00 | Cleaning manhole with spades or bucket taking out sludge manhole and disposed off aside by burying the entire sludge under ground in a pit of suitable size by putting earth on it. Again use water with bucket and put into manhole to clear the sludge and ensure the sludge is drain out completely. The depth of manhole n. exc. 1 metre each. | 40 | Each | 430 ₹17,200 | 470 ₹18,800 | 449 ₹17,960 | 420 ₹16,800 Lowest | 465 ₹18,600 | 420 ₹16,800 Lowest | 450 ₹18,000 | 450 ₹18,000 |
| 6.00 | Cleaning manhole with spades or bucket taking out sludge manhole and disposed off aside by burying the entire sludge under ground in a pit of suitable size by putting earth on it. Again use water with bucket and put into manhole to clear the sludge and ensure the sludge is drain out completely. The depth of manhole exc. 1metre but n.exc 2metre. | 70 | Each | 695 ₹48,650 | 700 ₹49,000 | 725 ₹50,750 | 800 ₹56,000 | 720 ₹50,400 | 670 ₹46,900 Lowest | 715 ₹50,050 | 690 ₹48,300 |
| 7.00 | Cleaning manhole with spades or bucket taking out sludge manhole and disposed off aside by burying the entire sludge under ground in a pit of suitable size by putting earth on it. Again use water with bucket and put into manhole to clear the sludge and ensure the sludge is drain out completely. The depth of manhole exc. 2metre but n.exc 3metre. | 90 | Each | 780 ₹70,200 | 795 ₹71,550 | 800 ₹72,000 | 778 ₹70,020 | 758 ₹68,220 | 750 ₹67,500 Lowest | 798 ₹71,820 | 800 ₹72,000 |
| 8.00 | Cleaning of septic tank any capacity, by bailing/removing out sediments, sludge etc.,by using vehicle mounted with compressor and sucker tank with covered container and washing wall/floor surface with fresh water all as specified and as directed. Note:- The extract of water & sludge to be taken away far from the MOD land and the volume of sludge obtained from cleaning measured from size septic tank and compared/check with tank size of sucket tank. | 80 | Cum | 580 ₹46,400 | 550 ₹44,000 | 545 ₹43,600 | 550 ₹44,000 | 530 ₹42,400 | 510 ₹40,800 Lowest | 570 ₹45,600 | 510 ₹40,800 Lowest |
| 9.00 | Excavation in soft/loose soil in trenches to the required width and depth to remove the damaged sewage lines of 150mm internal dia pipe by demolition of hanuching concrete to the pipe (one length 0.60m) and supply & fix new 150mm internal dia DWC pipe (one length of 60cm) including jointing with existing line, returning filling of soil, removal of surplus soil including temporarily plugging the adjacent manholes etc., complete all as specified and as directed. | 40 | EACH JOB | 715 ₹28,600 | 765 ₹30,600 | 790 ₹31,600 | 700 ₹28,000 | 750 ₹30,000 | 680 ₹27,200 Lowest | 850 ₹34,000 | 775 ₹31,000 |
| 10.00 | All as per Item No 9.00 described here in before but for 200mm internal dia pipe. | 40 | EACH JOB | 875 ₹35,000 | 950 ₹38,000 | 895 ₹35,800 | 860 ₹34,400 Lowest | 900 ₹36,000 | 860 ₹34,400 Lowest | 900 ₹36,000 | 915 ₹36,600 |
Tender Value
₹43 L
EMD Value
₹86,000
Closing Date
10 Jun 2026, 6:00 pmClosed
GE Minniebay Sri Vijaya Puram
GE Minniebay Sri Vijaya Puram
COMPREHENSIVE REPAIRS TO FOOTPATH, CHAINLINK FENCING, HARDSTANDING ETC. CLEANING AND REPAIRS OF SEWAGE LINE, SEPTIC TANKS, SOAKAGE WELLS, MANHOLES INCLUDING REPLACEMENT OF SEWAGE LINES JCO/OR GOVT MD ACCNS AND OTHER CONNECTED AREAS UNDER AGE B/R-I O
2026_MES_766798_1
8781/E8
Open Tender
Civil Works
Item Rate
270 days
GE Minniebay Sri Vijaya Puram
Please refer Tender documents.
13 documents required · 13 mandatory
₹500
Yes
GE Minniebay
₹86,000
Yes
12 Sept 2026
21 May 2026
12 Jun 2026
21 May 2026
10 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing & cleaning of blockage WC including WC trap of any description and in any position by removing sand/sludge/silt and other forein material deposited in it (either manually or mechanically) upto first manhole and making the sewage system functional to the entire satisfaction of Engr in Charge complete. | 300 | Each | 240 | ₹72,000 |
| 2 | Removing & cleaning of blockage from traps of bath rooms/ kitchen sink/ wash basin/ Urinal point and gully traps of any description and in any position by removing sand/sludge/silt and other forein material deposited in it (either manually or mechanically) upto first manhole and making the seweage system functional to the entire satisfaction of Engr in Charge complete. | 320 | Each | 270 | ₹86,400 |
| 3 | Taking out carefully the cover slab of gulley traps of any size and shape, depth and cleaning the block by removing the scum/sludge / any material to a distance exc. 250m and n.exc.500m and cleaning with fresh water placing the cover slab/ Grating in position all as directed by Eng-in-Charge. | 320 | Each | 150 | ₹48,000 |
| 4 | Cleaning of sewage lines using passing rubber ball through line to ensure all blockage perfectly clear or split bamboo with a gunny bag piece tied with bamboo with binding wire and inserting the bamboo in sewage lines of dia 100 mm and up to 200 mm through manhole/gully trap clear flow of sewage is observed in sewage pipe complete all as directed by Engr-in-charge. | 1,425 | RM | 120 | ₹1,71,000 |
| 5 | Cleaning manhole with spades or bucket taking out sludge manhole and disposed off aside by burying the entire sludge under ground in a pit of suitable size by putting earth on it. Again use water with bucket and put into manhole to clear the sludge and ensure the sludge is drain out completely. The depth of manhole n. exc. 1 metre each. | 40 | Each | 333 | ₹13,320 |
| 6 | Cleaning manhole with spades or bucket taking out sludge manhole and disposed off aside by burying the entire sludge under ground in a pit of suitable size by putting earth on it. Again use water with bucket and put into manhole to clear the sludge and ensure the sludge is drain out completely. The depth of manhole exc. 1metre but n.exc 2metre. | 70 | Each | 533 | ₹37,310 |
| 7 | Cleaning manhole with spades or bucket taking out sludge manhole and disposed off aside by burying the entire sludge under ground in a pit of suitable size by putting earth on it. Again use water with bucket and put into manhole to clear the sludge and ensure the sludge is drain out completely. The depth of manhole exc. 2metre but n.exc 3metre. | 90 | Each | 600 | ₹54,000 |
| 8 | Cleaning of septic tank any capacity, by bailing/removing out sediments, sludge etc.,by using vehicle mounted with compressor and sucker tank with covered container and washing wall/floor surface with fresh water all as specified and as directed. Note:- The extract of water & sludge to be taken away far from the MOD land and the volume of sludge obtained from cleaning measured from size septic tank and compared/check with tank size of sucket tank. | 80 | Cum | 400 | ₹32,000 |
| 9 | Excavation in soft/loose soil in trenches to the required width and depth to remove the damaged sewage lines of 150mm internal dia pipe by demolition of hanuching concrete to the pipe (one length 0.60m) and supply & fix new 150mm internal dia DWC pipe (one length of 60cm) including jointing with existing line, returning filling of soil, removal of surplus soil including temporarily plugging the adjacent manholes etc., complete all as specified and as directed. | 40 | EACH JOB | 540 | ₹21,600 |
| 10 | All as per Item No 9.00 described here in before but for 200mm internal dia pipe. | 40 | EACH JOB | 686 | ₹27,440 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8781Tender.pdf
Tender Documents • 0.98 MB
BOQ_858768.xls
BOQ • 0.33 MB
8781CORRI.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .