Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
11 Aug 2021, 2:00 pmClosed
SE/GCC/Madurai
SE/GCC/MADURAI
Construction retaining wall fencing filling at Marthandam 110/11 KV SS
2021_EB_207057_1
SE-GCC-MDU SPEC.NO.010/2021-22
Open Tender
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
Yes
THE SUPERINTENDING ENGINEER/GCC/MADURAI
₹14,000
Yes
6 Sept 2021
3 Aug 2021
12 Aug 2021
3 Aug 2021
11 Aug 2021
3 Aug 2021
Amount
Clearing scrub jungle including cost of labour, lead, lift, etc., complete
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20.A.
PCC1:4:8 using 40mm HBS metal without formwork including cost of materials, lead, lift, etc., complete.
PCC1:2:4 using 20mm HBS metal with formwork including cost of materials, lead, lift, etc., complete.
RCC 1:1.5:3 using 12 to 20mm HBS metal without form work including cost of materials, labour, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Raft
RCC 1:1.5:3 using 12 to 20mm HBS metal with form work including cost of materials, labour, lead, lift, curing, etc. complete. But excluding cost of reinforcement. Belt beam
Providing reinforcement for all RCC works including cost of steel and all lead, lift, labour for cutting, bending, placing reinforcement as per plan and tying with binding wire and including cost of binding wire, labour, work at all levels etc. complete
RR Masonry in CM 1:6 mix using Rough stone including cost of materials, labour, lead, lift, curing etc complete.
Pointing with C.M 1:3 mix for R.R. masonry including cost of materials, labours, lead, lift, curing, etc. complete
Plastering with cement mortar 1:5, 12mm thick including cost of all materials, labours, lead, lift, curing, etc. complete
Supplying, fabrication and fixing of G.I/M.S angle of required length including cost of materials, labours, lead, lift, etc. complete
Supplying and fixing of 10 guage of best quality IOWA GI barbed wire 2 ply 4 bars confirm to ISO 278 of IOWA and including labour charges of tensioning of barbed wire as per drawing No. 168, 112 of 8 rows of horizontal and 9 rows vertically in one bay of 4.5m including cost of material, labour, lead, lift, etc.complete.
Supplying and fixing of 10mm dia eye bolts of 150mm long (Single eye) including of MS rod threading of nut washer etc complete.
Painting exposed faces of angles with two coats of enamel paint over one coat of primary coat including cost of materials, labours, lead, lift, etc. complete
White washing two coats using white cement including cost of materials, labour, lead, lift etc. complete
Supplying, laying, fixing 25mm dia PVC pipe of best quality including cutting, threading, joining with necessary PVC specials including cost of materials lead lift labour, earthwork excavation wherever necessary etc complete.
Supplying and fixing in position of 25mm dia gun metal Gate valve of best quality including cost of material, labour, lead, lift, etc.complete.
Supplying and placing of 60 cm inner dia, 30 cm height and 5cm thick cement collar with top cover for earth pit including necessary earth work excavation including cost of labour, lead, lift, etc. complete.
Supplying and spreading of good quality of gravel including cost of materials lead, lift, loading, unloading etc., complete.
Supplying and spreading of good quality 20mm HBGS jelly including cost of materials lead, lift, loading, unloading etc., complete.
Dismantling PCC and clearing the same away from the site including cost of labour, lead, lift, etc. complete
Cost towards retrived GI barbed wire 2 ply 4 bars 8 rows of horizontal and 9 rows of vertical in one bay of 4.5m as is where is condition.
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
THAMPI RAJA SELVEN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .