Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr Quoted ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | - | - | Rejected-Technical BQR NOT SATISFIED |
| Sl No | Description | Qty | Unit | J SABARI L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil with lead of 10 to 100 m and lift of 3m in sand, silt or other loose soil, wet sand, or silt not under water, light black cotton soil, sandy loom and ordinary soil including excavated earth. In Hard stiff clay, stiff black cotton, hard red earth,, shales, murram, stoney earth and earth mixed with small size boulders SS 20 | 1,035 | M3 | 152 ₹1.6 L |
| 2.00 | Labour charges for cutting and levelling below road portion including cost of all labour, lead, lift and T&P etc., complete. | 252 | M3 | 115 ₹28,980 |
| 3.00 | Supplying and filling in with filling sand (M.Sand) in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 121 | M3 | 2,320 ₹2.8 L |
| 4.00 | Providing wet mix 1:2:4 using 20mm metal below road portion including cost of all labour, lead, lift and T&P etc., complete. | 180 | M3 | 7,820 ₹14.1 L |
| 5.00 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour,materials ,lead, lift, curing etc.complete | 105 | M3 | 7,113 ₹7.5 L |
| 6.00 | Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of RCC1:1:5:3 for reinforced concrete structural elements under controlled water cement ratio with plasticiser using 20mm and downgraded metal including form work, but excluding cost of steel reinforcement. Raft | 149 | M3 | 10,537 ₹15.7 L |
| 7.00 | Supply and fixing of 15mm thick Bitumen pad 5 mtr C/C in road portion including cost of all materials, labour, lead, lift etc., complete. | 265 | RM | 270 ₹71,550 |
| 8.00 | Providing PCC 1:2:4 using 20mm downgraded HBG machine crushed metal for foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. (Without form work) | 335 | Cu.m | 7,820 ₹26.2 L |
| 9.00 | Providing PCC 1:2:4 using 20mm downgraded HBG machine crushed metal for foundation concrete, cost of all labour, materials, lead, lift, curing etc. complete as per standard specification. (With form work) | 217 | Cu.m | 10,417 ₹22.6 L |
| 10.00 | Providing RCC 1:1.5:3 using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete excluding steel reinforcement (with form work) | 273 | Cu.m | 12,880 ₹35.2 L |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
25 Sept 2025, 2:30 pmClosed
CE/TP-I/CNI
CE TP 1 Chennai Guindy
Providing all plinths RCC cable duct with cover slab, Laying of road, fencing post and allied civil works for upgradation of the existing Nelvoy 33 11 KV SS into 110 33 11 KV SS at Kanchipuram Region
2025_EB_603346_1
TP1-75/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
120 days
Nelvoy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.6 L
27 Mar 2026
12 Sept 2025
26 Sept 2025
12 Sept 2025
25 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_721252.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid