Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹25.0 LAccepted-AOC 1109 11TH FLOOR SPAZE I TECH PARK SECTOR 49 SOHNA ROAD GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹25.5 L+₹49,032 (1.96%)Rejected-Finance 801 VENUS BENECIA PAKVAN DINING LANE OPP RAJPATH CLUB S G HIGHWAY BODAKDEV AHMEDABAD 380053 | AHMADABAD | GUJARAT | 380053 | L-2 | Rejected-Finance Being L-2 | |
| 3 | L-3₹26.3 L+₹1.3 L (5.20%)Rejected-Finance 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | L-3 | Rejected-Finance Being L-3 | |
| 4 | L-4₹26.5 L+₹1.5 L (6.20%)Rejected-Finance 7TH FLOOR LEVEL 8 UNIT 804 VASAVI MPM GRAND AMEERPET AWFIS HYDERABAD TELANGANA 500016 | HYDERABAD | TELANGANA | 500016 | L-4 | Rejected-Finance Being L-4 | |
| 5 | L-5₹27.5 L+₹2.5 L (9.99%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L-5 | Rejected-Finance Being L-5 |
Tender Value
₹28.9 L
EMD Value
₹57,828
Closing Date
1 Mar 2022, 3:00 pmClosed
AGM(E-E), LBSI Airport Varanasi.
AGM(E-E), LBSI Airport Varanasi.
Operation and Routine maintenance of arrival Baggage Handling System (Imported Make- Cassioli) at Varanasi Airport, period of Three (03) Years
2022_AAI_103994_1
AAI/VNS/AGM(E-E)/e-NIT-9/21-22
Open Tender
Electrical Works
Item Rate
1095 days
AGM(E-E), LBSI Airport Varanasi.
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,180
₹57,828
21 Apr 2022
7 Feb 2022
2 Mar 2022
8 Feb 2022
1 Mar 2022
8 Feb 2022
8 Feb 2022 - 11 Feb 2022
Amount
Operation of arrival baggage handling system by deploying required minimum one number skilled manpower in each shift involving satisfactory operation of the system and inform pre intimation in writing to Engineer-In charge for any corrective action required for ensuring serviceability/ satisfactory working condition of the system to avoid break down if any to inform the OEM or OEM,s authorized agency for rectification of fault and keeping maintaining log book & records/ documents etc. as per the detailed specifications, terms and conditions covered under this contract and as per OEM,s recommendations on all days including Sundays and holidays . For 02 Nos. Arrival Carousals in 3 Shifts per day. - Arrival Carousal with approx. loop length of each 65 Mtr. Feeder Conveyor -55 meter including control panel etc. 1st Year
Operation of arrival baggage handling system by deploying required minimum one number skilled manpower in each shift involving satisfactory operation of the system and inform pre intimation in writing to Engineer-In charge for any corrective action required for ensuring serviceability/ satisfactory working condition of the system to avoid break down if any to inform the OEM or OEM,s authorized agency for rectification of fault and keeping maintaining log book & records/ documents etc. as per the detailed specifications, terms and conditions covered under this contract and as per OEM,s recommendations on all days including Sundays and holidays . For 02 Nos. Arrival Carousals in 3 Shifts per day. - Arrival Carousal with approx. loop length of each 65 Mtr. Feeder Conveyor -55 meter including control panel etc. 2nd Year
Operation of arrival baggage handling system by deploying required minimum one number skilled manpower in each shift involving satisfactory operation of the system and inform pre intimation in writing to Engineer-In charge for any corrective action required for ensuring serviceability/ satisfactory working condition of the system to avoid break down if any to inform the OEM or OEM,s authorized agency for rectification of fault and keeping maintaining log book & records/ documents etc. as per the detailed specifications, terms and conditions covered under this contract and as per OEM,s recommendations on all days including Sundays and holidays . For 02 Nos. Arrival Carousals in 3 Shifts per day. - Arrival Carousal with approx. loop length of each 65 Mtr. Feeder Conveyor -55 meter including control panel etc. 3rd Year
ABHISHEK INTEGRATIONS LIMITED
GANNON DUNKERLEY AND CO LTD
Swati Airport Support Services Pvt Ltd
Manish Electricals
DElite System Engineering (India) Pvt. Ltd.
PREMIER ENGINEERING TECHNICS PVT. LTD.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .