Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.9 LAdmitted-Finance | -30.00% | ₹17.9 L | L1 | Admitted-Finance |
| 2 | L2₹21.1 L+₹3.2 L (17.7%)Admitted-Finance 51 HANUMAN COLONY GALI NO 4 CHAK 5 E CHHOTI SRI GANGANAGAR RAJ | -17.61% | ₹21.1 L+₹3.2 L (17.7%) | L2 | Admitted-Finance |
| 3 | L3₹25.5 L+₹7.5 L (42.1%)Admitted-Finance | -0.51% | ₹25.5 L+₹7.5 L (42.1%) | L3 | Admitted-Finance |
Tender Value
₹25.6 L
EMD Value
₹51,180
Closing Date
6 Jun 2026, 6:00 pmClosed
se
wdsc tonk
Construction of Amrit sarovar nirman karye and pacewall weist wier pasture ke pass PMKSY-2.0 block malpura
2026_WDSC_564485_1
NIT 5 wdsc tonk
Open Tender
Civil Works - Water Works
Percentage
120 days
tonk
refer bids
2 documents required · 2 mandatory
₹500
refer bids
₹51,180
Yes
11 Jun 2026
3 Jun 2026
8 Jun 2026
3 Jun 2026
6 Jun 2026
3 Jun 2026
3 Jun 2026 - 6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1as per bsr specification | |||||
| 1.01 | जंगल की सफाई, साधारण वनस्पति तथा झाडि़यों को काटने सहित। | 10,000 | Sqm | 3.6 | ₹36,000 |
| 1.02 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With initial lead of 250 m ( Deduct 10% Contractor profit) | 7,200 | Cum | 115.2 | ₹8,29,440 |
| 1.03 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.(ii) at least 98% of Standard Proctor's density (Deduct 10% Contractor profit) | 7,200 | Cum | 35.1 | ₹2,52,720 |
| 1.04 | Watering of earth including cost of carriage of water when source of water is up to 1 Km for per cum (Deduct 10% Contractor profit) | 7,200 | Cum | 11.34 | ₹81,648 |
| 1.05 | Supply of Murram or querry rubbish i/c 40% stone spouls and spreading over bunds with water and manual compaction | 76.2 | Cum | 626.45 | ₹47,735.49 |
| 1.06 | Display Board (Iron) | 1 | No. | 2,000 | ₹2,000 |
| 1.07 | नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना (ब)सख्त मिट्टी में/ कंकर मिली मिट्टी में | 193.09 | Cum | 178.46 | ₹34,458.84 |
| 1.08 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। | 30.09 | Cum | 4,098.52 | ₹1,23,324.47 |
| 1.09 | iRFkj dh fpVkbZ 1%6 lhesUV ctjh elkys esa ¼v½ uhoa esa + ¼c½ vf/kjpuk esa | 272.23 | Cum | 3,620.78 | ₹9,85,684.94 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BID.pdf
Tender Documents • 2.48 MB
technicalcorrigendum.pdf
Tender Documents • 0.05 MB
BOQ_1004679.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .