| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAdmitted-Finance | ₹10.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.8 Cr+₹3.4 Cr (32.6%)Admitted-Finance | ₹13.8 Cr+₹3.4 Cr (32.6%) | L2 | Admitted-Finance |
| 3 | L3₹14.6 Cr+₹4.2 Cr (40.3%)Admitted-Finance | ₹14.6 Cr+₹4.2 Cr (40.3%) | L3 | Admitted-Finance |
| 4 | L4₹15.6 Cr+₹5.2 Cr (50.4%)Admitted-Finance | ₹15.6 Cr+₹5.2 Cr (50.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | multitech construction company L2 | SATISH KUMAR SHARMA L1 | SUKET CONSTRUCTION CO. PVT. LTD. L4 | NDN CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||||
| 1.01 | All kinds of soil | 10,140 | One Cubic Metre | 450 ₹45,63,000 | 120 ₹12,16,800 Lowest | 530 ₹53,74,200 | 500 ₹50,70,000 |
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. | |||||||
| 2.01 | Ordinary rock | 561 | One Cubic Metre | 600 ₹3,36,600 | 120 ₹67,320 Lowest | 950 ₹5,32,950 | 700 ₹3,92,700 |
| 2.02 | Hard rock (blasting prohibited) | 20 | One Cubic Metre | 1,500 ₹30,000 | 120 ₹2,400 Lowest | 1,350 ₹27,000 | 2,100 ₹42,000 |
| 3.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||||
| 3.01 | All kinds of soil. | 200 | One Cubic Metre | 450 ₹90,000 | 120 ₹24,000 Lowest | 550 ₹1,10,000 | 600 ₹1,20,000 |
| 4.00Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. | |||||||
| 4.01 | Ordinary rock | 53 | One Cubic Metre | 750 ₹39,750 | 120 ₹6,360 Lowest | 950 ₹50,350 | 700 ₹37,100 |
| 4.02 | Hard rock (requiring blasting) | 26 | One Cubic Metre | 1,500 ₹39,000 | 120 ₹3,120 Lowest | 1,500 ₹39,000 | 2,500 ₹65,000 |
Tender Value
₹17.5 Cr
EMD Value
₹27.5 L
Closing Date
30 Nov 2024, 6:00 pmClosed
EE Civil
BSNL, CIVIL DIVISION, BSNL Civil Division. 3rd Floor, TE Building, Dhalpur, Kullu
CO Eklavya Model Residential School Pangi at Killar Dharwas, Tehsil Pangi District Chamba HP Phase-1A SH School building half block G plus1 floor, Hostel Block including minimum Site development and approach road Civil and Electrical Work
2024_BSNL_212756_1
EE/ BSNL/CD/ KLU/ DB/Year 2024-2025/05
Open Tender
Civil Works
Item Rate
517 days
Pangi at Killar Chamba
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,770
AO EF, CGMT office BSNL HP Telecom Circle
₹27.5 L
18 Dec 2024
28 Oct 2024
6 Dec 2024
28 Oct 2024
30 Nov 2024
28 Oct 2024
28 Oct 2024 - 30 Nov 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 1.01 | All kinds of soil | 10,140 | One Cubic Metre | 149 | ₹15,10,860 |
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. | |||||
| 2.01 | Ordinary rock | 561 | One Cubic Metre | 412.95 | ₹2,31,664.95 |
| 2.02 | Hard rock (blasting prohibited) | 20 | One Cubic Metre | 412.95 | ₹8,259 |
| 3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 3.01 | All kinds of soil. | 200 | One Cubic Metre | 218.6 | ₹43,720 |
| 4Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. | |||||
| 4.01 | Ordinary rock | 53 | One Cubic Metre | 412.95 | ₹21,886.35 |
| 4.02 | Hard rock (requiring blasting) | 26 | One Cubic Metre | 412.95 | ₹10,736.7 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.59 MB
BOQ_234139.xls
BOQ • 0.56 MB
BOQ.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .