Loading…
Loading…
Tender Value
₹6.2 Cr
EMD Value
₹9.3 L
Closing Date
21 Oct 2026, 5:30 pm
Gulbarga Electricity Supply Company Limited
Superintending engineer
Repairs of 25 Nos. faulty 5 MVA, 33/11 KV Power Transformers of various makes available at various 33/11 kV Sub-stations in GESCOM jurisdiction including transportation from site to repair bay and from repair bay to site as decided by GESCOM along with testing and commissioning after repairs to the transformers on percentage basis under Total Turnkey Basis
GESCOM/2026-27/EL/WORK_INDENT306
GESCOM/2026-27/EL/WORK_INDENT306
Open
Electrical
Two Tender Document System(Two Cover)
GESCOM Chief Engineer Operations Corporate Office Gulbarga
4 documents required · 0 mandatory · 4 optional
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
As per tender document
₹5,000
₹9.3 L
19 Sept 2026
19 Sept 2026
23 Oct 2026
6 Oct 2026
6 Oct 2026
Moving the faulty Power Transformer to the plinth. Maximum allowable is 50 mtrs. As per Common SR-2025-26, Part-2, Sl No. 14(a) of Pg No. 159.
Loading of the faulty Transformer tank with active parts & accessories at 33/11 kV Sub-Station. As per Common SR-2025-26, Part-2, Sl No. 51 (i) of Pg No. 183.
Transportation of faulty Power Transformer with active parts and its accessories from 33/11kV Sub-Station to Repairer’s works using 11 to 20 MT Truck & Trailer & Rs. 81.99-greater than 250 Km. As per Common SR-2025-26, Part-2, Sl No. 49(iii) of Pg No. 182.
Unloading of the faulty Transformer tank with active parts & all accessories at repairer’s works. As per Common SR-2025-26, Part-3, Sl No. 2 of Page No. 195.
Dismantling faulty Transformer for joint inspection at repairer’s premises including all activities such as opening of to cover, de-tanking of core and winding, separation of HV/LV coils, conducting of preliminary test required for assessment of repair work to be undertaken, dismantling core etc., in the presence of GESCOM authorized representative. As per Common SR-2025-26, Part-3, Sl No. 3 of Page No. 195.
Providing new copper windings in place of damaged or faulty winding including cost of materials, labour, drying etc., (Both HV & LV) - per Kg of winding including tap leads etc. (Taking into account value of released copper which has to be retained by the repairer) As per Common SR-2025-26, Part-3, Sl No. 3(C)(ii)(b) of Pg. No. 203 & Sl.No. 10(A) of Pg. No. 194. New Copper - Rs.878.65 /kg (Excl. Taxes) Scrap Copper Rate = Rs. 461/kg (Excl. Taxes) New Copper Rate - Scrap Copper i.e Rs.1254.536 - Rs.658.208 = Rs.596.332 (Incl.Taxes)
Providing solid insulation materials for replacement to damaged or burnt insulation as per actual weight for all 3 limbs. As per Common SR-2025-26, Part-3, Sl No. 3(B)(i) of Pg. No. 203.
Providing re-insulation to HV/LV winding whenever necessary for total weight of winding except solid insulation. As per Common SR-2025-26, Part-3, Sl No. 3(C)(i) of Pg. No. 203.
Providing new CRGO insulation to the core in place of damaged lamination wherever necessary including cost of materials and labours. (Taking into account of releases CRGO which has to be retained by the repairer). As per Common SR-2025-26, Part-3, Sl No. 3(A)(i) of Pg. No. 203 & Sl.No. 10(A) of Pg. No. 194. New CRGO insulation - Rs. 671.01/kg (Excl. Taxes) Scrap CRGO Rate = Rs. 108.00/ kg. (Exc.Taxes) Rs. 958.068 - Rs.154.202= 803.865 (Incl. Taxes)
Repair and overhauling of OLTC/Diverter switch including change of oil, lubrication and replacement of gaskets and other parts (which are locally available) As per Comman SR-2025-26, Vol-6, Part-3, Sl No. 4 (A) of Page No. 204
Complete new oil required for commissioning the transformer should be supplied from standard manufacturers. As per common SR 2025-26 (11kV System) Sl No 155, Item No. 15.01, Page No. 7 of 52 (Standard Stock Materials)
Cleaning, Repairing and painting inside the Transformer Tank with hot oil bath and acid proof epoxy paint after thorough cleaning including the cost of materials including the painting of radiators at site/firm. As per common SR 2025-26, Part-3, Sl No. 1(B) of Pg No. 201.
Re assembly of core and winding with solid insulation. As per common SR 2025-26, Part-3, Sl No. 5(E) of Pg No. 197.
Drying out the assembly of core and winding in oven/ vacuum chamber, till the specified insulation resistance values are obtained (including cost of materials and labour) As per common SR 2025-26, Part-3, Sl No. 5(B)(ii) of Pg No. 196.
Tanking the assembly, giving connection, providing new gaskets and insulating materials conforming to relevant ISS, putting back the cover, tightening the fixtures, fixing the bushing etc., including the cost of all materials like Gasket, insulating materials, Bolts and Nuts etc., and labour. Other accessories at repairers work to facilitate the testing. As per common SR 2025-26, Part-3, Sl No. 1(C) of Page No. 202.
Filling of oil to the main Tank & OLTC Tank, Filtering the oil including filtering till attainment of prescribed BDV. As per common SR 2025-26, Part-3, Sl No. 5(F) of Page No. 197.
Testing the Transformer for routine tests as per IS 2026-1983 if repairs are carried out at Repairer's work (In presence of GESCOM representative) As per Common SR-2025-26, Part-2, Sl No. 17 (b) of Page No. 160.
Loading of the Repaired good 5MVA Transformer tank with active parts & all accessories at repairer’s works. As per Common SR-2025-26, Part-3, Sl No. 2 of Page No. 195.
Transportation of Power Transformer with active parts and its accessories from firms Repair centre to the destination Sub-Station as per the kind direction of CEE Corporate office GESCOM Gulbarga using 11 to 20 MT Truck & Trailer. The transformer should be transported with oil up to the level and balance new oil required should be transported to the destination in sealed barrels. As per Common SR-2025-26, Part-2, Sl No. 49(iii) of Pg No. 182.
Unloading of repaired good 5MVA Transformer tank with active parts & all accessories at the destination specified by the GESCOM. As per Common SR-2025-26, Part-2, Sl No. 5(i) of Pg No. 183.
Moving the repaired Power Transformer from 11 to 20MT truck and trailer to the Transformer bed at the destination as specified by GESCOM. As per Common SR-2025-26, Part-2, Sl No. 14(a) of Pg No. 159.
Assembling of Transformer parts like bushings, radiators, Conservator, breather etc., As per Common SR-2025-26, Part-2, Sl No. 14(b) of Pg No. 159.
Supervising and commissioning of transformer in the presence of RT staff as and when the transformer is ready for commissioning. As per Common SR-2025-26, Part-3, Sl No. 7(C) of Page No. 199.
Providing oil Temperature indicator with RTD (Prev. Award Rate)
Silica Gel for Breather Tank & OLTC As per common SR 2025-26 (11kV System) Sl No 635, Item No. 67.04, Page No. 30 of 52 (Standard Stock Materials)
Providing new Bucholz relay. As per Common SR-2025-26, Part-2, Sl No. 6(A) of Page No. 193.
Providing radiator valves (150mm dia) As per Common SR-2025-26, Part-3, Sl No. 3(A)(iii) of Page No. 190
Providing magnetic oil gauge. As per Common SR-2025-26, Part-2, Sl No. 5(B) of Page No. 193.
Providing winding temperature indicator with RTD (Prev. Award Rate)
Providing oil surge relay. As per Common SR-2025-26, Part-2, Sl No. 6(B) of Page No. 193.
Various types of valves with Gaskets (50 & 25 sqmm Brass Valves) (Prev. Award Rate)
Providing new 33 kV bushing & neutral bushing with metal parts (suitable for 5 MVA) As per Common SR-2025-26, Part-3, Sl No. 2(C)(i) of Pg No. 188
Providing new 11 kV bushing & neutral bushing with metal parts (suitable for 5 MVA) As per Common SR-2025-26, Part-3, Sl No. 2(C)(ii) of Pg No. 188
New marshaling box (Prev. Award Rate) As per Common SR-2025-26, Part-3, Sl No. 9(A) of Pg No. 194.
Pressure relief valve As per Common SR-2025-26, Part-2, Sl No. 6(C) of Pg No. 193.
OLTC Epoxy Barrier Board (Prev. Award Rate)
OLTC Bakelite Phase Board (Prev. Award Rate)
OLTC Register coils (Prev. Award Rate)
OLTC fixed contact (Prev. Award Rate)
OLTC Phase Board separators (Prev. Award Rate))
OLTC Copper connecting rod (Prev. Award Rate)
OLTC bearing Plate Assembly (Prev. Award Rate)
OLTC Override Clutch Assembly (Prev. Award Rate)
OLTC Main Shaft Oil seal (Prev. Award Rate)
OLTC Epoxy moving arm (Prev. Award Rate)
OLTC Energy Accumulator Assembly (Prev. Award Rate)
OLTC moving contacts (Prev. Award Rate)
OLTC collector rings (Prev. Award Rate)
Name of the Machinery/Facility
Signature:
Name of the work and the authority by whom the work is awarded.
Signature
Name of the work done
Signature
Clause
Particulars
Annual turn over for the years
Liquid Asset
Whether Audited Balance sheets is enclosed ?
Signature
C&M Division
Kalaburgi
Kalaburgi
Kalaburgi
Kalaburgi
Yadgir
Yadgir
Yadgir
Yadgir
Yadgir
Bidar
Humnabad
Humnabad
Raichur
Raichur
Raichur
Raichur
Raichur
Raichur
Raichur
Raichur
Raichur
Raichur
Ballari
Ballari
Koppal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
PQR.doc
Tender Document • 0.10 MB
14 Stamp Duty Circular.pdf
Tender Document • 0.09 MB
Itemwise quantity.xlsx
Tender Document • 0.11 MB
15 KPTCL Cicrcular insurance surety bond-PBG.pdf
Tender Document • 1.59 MB
techno commercial sheets.xls
Tender Document • 0.06 MB
13 FD417EXP Circular-GST.pdf
Tender Document • 0.12 MB
Tender Document GESCOM.docx
Tender Document • 0.21 MB
List of 25Nos of 5MVA PTRs.xlsx
Tender Document • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .