| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.7 LAccepted-AOC 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | ₹40.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.8 LRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹40.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹43.1 LRejected-Finance | ₹43.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹49.0 LRejected-Finance | ₹49.0 L | L4 | Rejected-Finance L4 |
| 5 | L5₹49.5 LRejected-Finance | ₹49.5 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | CHATURBHUJ INFRASTRUCTRE INDIA PRIVATE LIMITED L4 | M/S MOHD. IDRIS CONTRACTOR L5 | Mukut Bihari Lal Contractor L3 | M/S CHAUDHARY ENTERPRISES L2 | M/s Ajay Kumar Contractor L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60 M as per direction of Engineer-in-charge | 16.49 | Cum | 516 ₹8,508.84 | 518 ₹8,541.82 | 400 ₹6,596 | 500 ₹8,245 | 500 ₹8,245 |
| 2.00 | Dismantling of Reinforced cement concrete including stacking of material with in distance 60 M as per direction of Engineer-in-charge | 10.51 | Cum | 630 ₹6,621.30 | 633 ₹6,652.83 | 600 ₹6,306 | 600 ₹6,306 | 500 ₹5,255 |
| 3.00 | Providing and filling EC bag with local earth, hand sewing with Suja and sutli, placing in position i/c all cost of material, labour and T&P etc complete. | 2,700 | No | 15 ₹40,500 | 19 ₹51,300 | 12 ₹32,400 | 19 ₹51,300 | 15 ₹40,500 |
| 4.00 | Earth work in foundation in all types of soil including all lift and lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 241.29 | Cum | 99 ₹23,887.71 | 99 ₹23,887.71 | 80 ₹19,303.20 | 100 ₹24,129 | 90 ₹21,716.10 |
| 5.00 | Earth work in making diversion/bundha by transported earth with a lead of 200 m to 1.0 km i/c excation ,loading, unloading ,manual compaction dressing and all lifts complete. | 1,225 | Cum | 140 ₹1.7 L | 180 ₹2.2 L | 90 ₹1.1 L | 80 ₹98,000 | 90 ₹1.1 L |
| 6.00 | Laying plain cement concrete A 20 M-15 (1 cement : 2 coarse sand : 4 graded stone aggregate) in foundation including all cost fo material, labour, T&P etc required for proper completion of work. | 116.96 | Cum | 5,750 ₹6.7 L | 5,700 ₹6.7 L | 5,200 ₹6.1 L | 4,500 ₹5.3 L | 5,400 ₹6.3 L |
| 7.00 | Laying R.C.C. A 20 M20 (1 cement : 1.5 coarse sand : 3 graded stone aggregate) in foundation including all cost fo material, labour, T&P etc required for proper completion of work | 58.76 | Cum | 6,990 ₹4.1 L | 6,950 ₹4.1 L | 6,200 ₹3.6 L | 5,800 ₹3.4 L | 5,800 ₹3.4 L |
| 8.00 | Laying R.C.C. A 20 M25 (1 cement : 1 coarse sand : 2 graded stone aggregate) i/c all cost of all material, labour and T&P etc required for proper completion of work. | 204.58 | Cum | 7,960 ₹16.3 L | 7,980 ₹16.3 L | 7,000 ₹14.3 L | 6,800 ₹13.9 L | 5,800 ₹11.9 L |
| 9.00 | Providing and fixing Steel Reinforcement (T.M.T. Fe-550) with cost of Bending, Binding,cutting & placing of Reinforcement i/c cost of binding wire, material,labour T&P etc required for proper completion of work | 15.37 | MT | 74,000 ₹11.4 L | 74,000 ₹11.4 L | 68,000 ₹10.5 L | 68,000 ₹10.5 L | 81,000 ₹12.4 L |
| 10.00 | Centering & Shuttering for R.C.C. work i/c all cost of
material, labour & T.& P. etc. required for proper completion of work | 652.21 | sqm | 835 ₹5.4 L | 840 ₹5.5 L | 700 ₹4.6 L | 600 ₹3.9 L | 300 ₹2.0 L |
Tender Value
₹50.0 L
EMD Value
₹1 L
Closing Date
2 Sept 2025, 3:00 pmClosed
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2025_UPIDC_1068472_11
03/SE-1/2025-26
Open Tender
Civil Works
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1 L
Office of SE 1st IWC Meerut
24 Dec 2025
26 Aug 2025
2 Sept 2025
26 Aug 2025
2 Sept 2025
26 Aug 2025
29 Aug 2025
Amount
Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60 M as per direction of Engineer-in-charge
Dismantling of Reinforced cement concrete including stacking of material with in distance 60 M as per direction of Engineer-in-charge
Providing and filling EC bag with local earth, hand sewing with Suja and sutli, placing in position i/c all cost of material, labour and T&P etc complete.
Earth work in foundation in all types of soil including all lift and lead also including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge.
Earth work in making diversion/bundha by transported earth with a lead of 200 m to 1.0 km i/c excation ,loading, unloading ,manual compaction dressing and all lifts complete.
Laying plain cement concrete A 20 M-15 (1 cement : 2 coarse sand : 4 graded stone aggregate) in foundation including all cost fo material, labour, T&P etc required for proper completion of work.
Laying R.C.C. A 20 M20 (1 cement : 1.5 coarse sand : 3 graded stone aggregate) in foundation including all cost fo material, labour, T&P etc required for proper completion of work
Laying R.C.C. A 20 M25 (1 cement : 1 coarse sand : 2 graded stone aggregate) i/c all cost of all material, labour and T&P etc required for proper completion of work.
Providing and fixing Steel Reinforcement (T.M.T. Fe-550) with cost of Bending, Binding,cutting & placing of Reinforcement i/c cost of binding wire, material,labour T&P etc required for proper completion of work
Centering & Shuttering for R.C.C. work i/c all cost of material, labour & T.& P. etc. required for proper completion of work
Laying Brick on edge soling by using 15% old Bricks with local sand filling in joints i/c cost of labour,material and T&P etc required for proper complection of work.
Providing and Fixing PVC Drainage pipe 75 mm dia i/c cost of all material,labour and T&P etc complete
Earth work in Removing diversion / bundha by hydraulic excavator / jcb/ equivalent capacity with lift up to 1.50m and lead upto 90 m i/c cost of driver , assistant driver, pol, maintenance of machine, cont profit , T&P required for proper completion of work
Finishing wall with weather coat paint of approved make and quality on new work with two coat to give an even shade i/c supply of all materials, labour and T&P etc complete.
Painting letters including all cost of materials, labour,T&P etc. complete.
Providing and fixing of (30x90 cm left/Right object Hazard) retro-reflectorised cautionary, mandatory and informatory sign i/c all cost of material, labour,T&P etc complete.
Brick work in 1:4 C:M for laid flat bricks over 12 mm thick cement mortar i/c all cost of material ,labour, T&P etc required for proper completion of work.
Cement Pointing Struk Deep on brick masonry in 1:2 C.M. ic all cost of material, labour and T&P etc required for proper completion of work.
Providing and fixing marble white stone 25 mm thick of size 0.55M×0.35M with letter digging i/c cost of all material labour and t&p etc complete.
Laying brick ballast (from Dismantaled brick work) in 1:3:6 ( 1cement:3 coarse sand: 6 brick ballast of size 20 mm to 40mm) 100 mm thick i/c all cost of material, labour, T&P etc required for proper completion of work.
Brick work with Ist class (M-150) bricks in 1:4 cement mortar i/c all cost of material, labour and T&P etc complete.
M/S CHAUDHARY ENTERPRISES (BID ID -5513597)
Mukut Bihari Lal Contractor (BID ID -5513388)
CHATURBHUJ INFRASTRUCTRE INDIA PRIVATE LIMITED (BID ID -5512771)
M/S MOHD. IDRIS CONTRACTOR (BID ID -5513154)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid