Tender Value
₹97 L
EMD Value
₹1.7 L
Closing Date
30 Jul 2026, 6:00 pm
COL SAIKAT DE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
CONSULTANCY SERVICES, COMPREHENSIVE DESIGN AND PROJECT MANAGEMENT UPTO COMPLETION OF ENTIRE PROJECT FOR PROVISION OF DEFICIENT MARRIED ACCOMMODATION FOR OFFICERS (LT CDR AND ABOVE) AT INS MANDOVI
2026_MES_776041_1
86084
Open Tender
Civil Works
MANDOVI
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,000
GE(P) NAVY MANDOVI
₹1.7 L
Yes
2 Jul 2026
2 Jul 2026
1 Aug 2026
2 Jul 2026
30 Jul 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 畱物浥湥獴椠潳瑦☠栠牡潣祰灓捡⽥牁慥愠慮祬楳湩琠扡汵牡朠慲桰捩污映牯慭獴మआ1.02. Structural Services‐ Providing comprehensive Structural Design & Consultancy Services including analysis, design, preparation of detailed structural drawings, proof checking, and vetting for Deficient Married Accommodation for Officers (Lt Cdr & Above) at INS Mandovi, complete in all respects Scope of Work:
(A) Structural Design & Analysis
Structural analysis and design of buildings using approved software (ETAB-23 and above and SAFE).
Design of RCC framed structure with suitable grade of concrete and steel.
The Structural system shall comply with latest relevant IS codes and incorporating results of Soil Investigation of site. The methodology shall be FEA analysis with the help of Computer Aided Software. To simulate the structure so as to get accurate behaviour, the structure shall be modelled in ETABS-23 and above for Ultimate Limit State (ULS) as well as Serviceability Limit State (SLS). The floor slabs be modelled in accordance with flexibility as applicable with a break in the diaphragm where cut-outs are planned. Shear Walls wherever considered shall be modelled as shell elements and designed to resist Earthquake effect and Wind loads and designed as ductile shear wall. The frames/shear walls in either direction be designed considering various codal combinations of Dead load, Live load and Earthquake/Wind loads. Live loads and unit weights shall be used for analysis as per latest IS Codes. The building be checked for serviceability for both cracked and un-cracked sections as per codes IS 1893 and IS 16700.
ŀ(ŜΉ܈⠀⥂倠敲慰慲楴湯漠牄睡湩獧倊敲慰慲楴湯漠敤慴汩摥猠牴捵畴慲畁潴䌠䑁搠慲楷杮湩汣摵湩㩧䘊畯摮瑡潩慬潹瑵䌊汯浵Ɱ戠慥湡汳扡搠瑥楡獬匊慴物慣敳愠摮猠牴捵畴慲潣灭湯湥獴刊楥普牯散敭瑮搠瑥楡楬杮⠠䍒⥃䤊据牯潰慲楴湯漠污敤楳湧搠瑥楡獬爠煥極敲潦硥捥瑵潩ਊ䌨
畓浢獩楳湯漠敄楳湧䐠瑡灁牰癯摥猠牴捵畴慲牤睡湩獧⠠污楳敺⥳䐊獥杩慣捬汵瑡潩獮椠据畬楤杮䐠獥杩慂楳敲潰瑲愠摮愠慮祬楳敲潰瑲ੳ呅䉁⁓潍敤獬愠摮匠䙁⁅楦敬猨景⁴潣祰畓浢獩楳湯椠慨摲☠猠景⁴潣楰獥愠数湅楧敮牥椭桃牡敧爠煥極敲敭瑮ਊ䐨
牐潯桃捥楫杮☠嘠瑥楴杮吊敨爠獥汵獴漠潣灭瑵牥洠摯汥愠慮祬楳桳污敢搠獩畣獳摥眠瑩㉅⠠敄楳湧
敓瑣潩景䠠⁑䕃⠠慎祶
畍扭楡愠⁴慶楲畯瑳条獥琠汩敲捡楨杮琠楦慮敤慴汩摥搠獥杩吠敨搠捯浵湥獴愠摮洠摯汥桳污敢瀠潲散獳摥映牯瘠瑥楴杮琠䥉獔愠瑦牥挠敬牡湡散映潲先䌠⁅丨癡⥹䴠浵慢䤊据牯潰慲楴湯漠扯敳癲瑡潩獮⠠晩愠祮
湡楦慮灡牰癯污漠瑳畲瑣牵污搠獥杩'(Ď(Ĩȑ(ȩɂЈ⠀⥅䌠摯獥☠匠慴摮牡獤䄊汬搠獥杩獮猠慨汬挠湯潦浲琠㩯䰊瑡獥⁴湉楤湡匠慴摮牡䤨⥓䌠摯獥刊汥癥湡⁴䉎ⵃ〲㘲瀠潲楶楳湯ੳ潇摯攠杮湩敥楲杮瀠慲瑣捩獥倊潲敪瑣倠牡浡瑥牥㩳吊瑯污倠楬瑮牁慥›㜱㌬〳匠浱䌊湯楦畧慲楴湯›⭇‹瑓牯祥上漠畂汩楤杮㩳〠′…瑯敨潣湮捥整畢汩楤杮湡瑳畲瑣牵獥ਮ⠊⥆匠扵業獳潩景䐠慲楷杮匊扵業獳潩景〠‱敳⁴景搠慲楷杮椠牯杩湩污渠湯吠慥慲汢牔捡湩慰数景ㄠ〰䜠䵓映牯挠浯汰瑥瑓畲瑣牵污搠慲楷杮搠汵⁹湩潣灲牯瑡摥洠摯晩捩瑡潩⽮挠慨杮獥猠杵敧瑳摥戠⁹䥉⹔匠牴捵畴慲牄獧愠摮搠獥杩獮眠汩敢栠湡敤癯牥椠潳瑦愠摮栠牡捤灯⁹潢桴搠汵⁹敶瑴摥戠⁹䥉⹔Њ⠀ᔀᬀ ⠁㘀ᬁ똀ࠂ⸱㌰⽂⁒䈨極摬湩湡潒摡⥳ⴠ倠潲楶楤杮挠浯牰桥湥楳敶瀠慬湮湩Ⱨ搠獥杩Ɱ愠摮瀠敲慰慲楴湯漠敤慴汩摥搠慲楷杮潦污硥整湲污䈠極摬湩…潒摡䈨刯
敳癲捩獥映牯䐠晥捩敩瑮䴠牡楲摥䄠捣浯潭慤楴湯映牯传晦捩牥䰨⁴摃…扁癯⥥愠⁴义⁓慍摮癯Ⱪ猠牴捩汴⁹湩愠捣牯慤据楷桴猠湡瑣潩敮摁業楮瑳慲楴敶䄠灰潲慶ⱬ挠浯汰瑥湩愠汬爠獥数瑣匠潣数漠潗歲⠊⥁匠瑩汐湡楮杮倠敲慰慲楴湯漠敤慴汩摥猠瑩汰湡潦污硥整湲污䈠刯猠牥楶散慢敳湯愠灰潲敶慭瑳牥氠祡畯⁴湡摡業楮瑳慲楴敶猠湡瑣潩ਊ䈨
潒摡ⱳ倠癡浥湥獴☠倠牡楫杮倠慬湮湩湡敤楳湧漠㩦䤠瑮牥慮潲摡湡慣牲慩敧慷獹䘠潯灴瑡獨瀯癡浥湥獴倊牡楫杮愠敲獡倠敲慰慲楴湯漠敧浯瑥楲敤楳湧敬敶獬牣獯敳瑣潩獮湡慬潹瑵搠慲楷杮ਊ$#ȋ⠀⥃删瑥楡楮杮☠倠潲整瑣癩潗歲ੳ敄楳湧漠㩦 †敒慴湩湩慷汬ੳ†䈠敲獡⁴慷汬 牰瑯捥楴敶猠牴捵畴敲ੳ†匠潬数猠慴楢楬慺楴湯愠摮瀠潲整瑣潩敭獡牵獥⠠桷牥敲畱物摥
ਊ䐨
瑓牯慗整牄楡慮敧倊lanning and design of:
Surface/area drainage system
Storm water network with proper gradients
Ensuring adequate outfall and safe disposal.
(E) Sewerage & Disposal
Design of:
Sewer network and manholes
Septic tank / treatment system (if applicable)
Integration with overall site infrastructure and nearby utilities.
1.04. Providing comprehensive design and consultancy services for Electrical & Mechanical (E/M) systems for Deficient Married Accommodation for Officers (Lt Cdr & Above) at INS Mandovi, including all internal and external services, complete in all respects.
Scope of Work:
(A) Electrical Systems
Design of complete internal electrification including: Wiring, lighting, power distribution Distribution boards, panels, and circuits Design of external electrification including: Street lighting Cable networks and feeder pillars
g±(B) Power Supply & Infrastructure
Design of: Substation / transformer yard
LT/HT panels and distribution systems Earthing and lightning protection system
(C) Mechanical & Plumbing Systems
Design of: Internal water supply system Plumbing network Pumping systems UG sumps and overhead tanks
(D) HVAC & Mechanical Systems (if applicable)
Planning and design of: Ventilation systems Mechanical services required for building operation
(E) External Services Integration
Coordination and integration of: Electrical systems Water supply and plumbing Mechanical services with overall building and infrastructure design
(F) Drawings & Documentation
Preparation of: Detailed E/M drawings (layouts, schematics, single line diagrams) Design calculations and load analysis Submission in hard & soft copies as directed by Engineer-in-Charge
(G) Codes & Standards
All designs shall comply with: Indian Electricity Rules / IS Codes NBC provisions Relevant MES standards(H) Electric Vehicle (EV) Charging Layout Planning
Designing a functional Electric Vehicle (EV) charging layout for both 4-Wheelers (4W) and 2-Wheelers (2W) as per requirement shall include proper planning of parking dimensions, charging point locations, electrical safety provisions, circulation space, and clear surface marking standards.
The scope shall include: Planning and allocation of EV parking bays for 4W and 2W vehicles, Identification of optimal charger locations for user accessibility and operational efficiency, Provision of required electrical infrastructure including power supply, earthing, protection systems, and cable management, Adequate driveway and vehicle circulation space for safe movement, Surface markings, signage, and colour coding for EV charging zones, Integration of safety measures including bollards, fire extinguishers, emergency shutdown arrangements, and weather protection where required, Provision for future expansion of EV charging infrastructure, Compliance with applicable standards and guidelines of Bureau of Indian Standards, Central Electricity Authority, and other relevant statutory authorities. The consultant shall prepare and submit: EV charging layout drawings, Parking and circulation plans, Charger location details, Electrical load assessment, Surface marking and signage details, and integration of EV infrastructure within the overall site planning proposal.)2&«(a) Construction of Married Accn for Lt Cdr and above (G+9) x 2 blocks with permanent specification including internal services all as specified.
( Plinth Area 17330 sqm)ê(F) Boundary & Security Works
Design of:
Boundary wall / fencing
Gates and entry/exit control points
Incorporating security requirements of Naval establishment.
(G) Rainwater Harvesting
Planning and design of rainwater harvesting system, integrated with storm water drainage.
(H) Drawings & Deliverables
Preparation and submission of:
Detailed layout drawings
Design calculations (where applicable)
Submission in hard & soft copies as directed by the Engineer-in-Charge.+1.05. Fire Protection System - Providing comprehensive design and consultancy services for Fire Protection System including detailed planning, design, preparation of drawings, BOQ, specifications, and rate analysis as per CFEES & NBC Norms for Deficient Married Accommodation for Officers (Lt Cdr & Above) at INS Mandovi, complete in all respects.
Scope of Work:
(A) System Planning & Design
Detailed planning and design of complete firefighting system for all buildings and associated infrastructure. Preparation and marking of firefighting layouts on drawings.
(B) Fire Detection & Alarm System Design of: Fire detection system Fire alarm system Control panels and network integration
(C) Firefighting Systems Design of: Hydrant system, Automatic sprinkler system Internal and external firefighting network
$#(D) Water Storage & Pumping Design of: Fire water sump Pump house
Fire pumps and associated piping systems
(E) Portable Fire Protection Provision and layout of: Fire extinguishers
Portable firefighting arrangements
(F) Codes & Compliance
All designs shall comply with:
CFEES guidelines
NBC SP7:2026
Relevant IS Codes and fire safety norms
(G) Drawings & Documentation Preparation and submission of: Detailed firefighting drawings System schematics and layouts Submission in hard & soft copies as directed by Engineer-in-Charge
ì1.06. Detailed Estimate & Costing -Providing comprehensive preparation of detailed estimates, BOQs, yardsticks, and rate analysis based on approved architectural, structural, and services drawings for Deficient Married Accommodation for Officers (Lt Cdr & Above) at INS Mandovi, complete in all respects.
Scope of Work:
(A) Detailed Estimates Preparation of detailed cost estimates based on approved drawings (Architectural, Structural, E/M, Fire Fighting, and External Services).
Measurement and quantity take-off for all items of work.
(B) BOQ Preparation of item-wise Bill of Quantities (BOQ) with:
Detailed descriptions Units and quantities BOQ to be aligned with tendering requirements. (based on SSR/DSR(latest applicable) requirement)
$!#2*?#(C) Rate Analysis
Preparation of rate analysis for all non-schedule and major items based on: Prevailing market rates
Labour and material inputs
(D) Schedule of Rates (SOR) Compliance
Estimates to be based on: SSR 2020 / DSR (latest applicable)
Standard Schedule of Rates and norms
(E) Yardstick Preparation :Preparation of yardsticks for all the buildings as per the approved architectural and structural drawings as per SSR 2020 or DSR (latest applicable) for cost comparison and benchmarking of similar works.
(F) Market Analysis: Conducting market survey and analysis for validation of rates and cost optimization.
(H) Draft tender : Draft tender as per relevant IAFW shall be prepared including all the relevant conditions and specifications
(I) Estimates, yardstick, Market Analysis and draft tender documents will be duly approved by Dir(C) /E 8 HQ CENM
(H) Documentation & Submission :Submission of: Detailed estimate report, BOQ, Rate analysis sheets In hard & soft copies as directed by Engineer-in-Charge
1.07. GRIHA Rating Compliance and Scope of Work:
The consultant shall ensure the project achieves a minimum 3-Star GRIHA rating, with the quoted consultancy fees being inclusive of all required efforts. The scope of work includes:
1. Design and Documentation: Ensure all Architectural, Structural, Firefighting, Landscape and MEP designs, along with their associated BOQs, specifications, material selections and calculations are developed in strict compliance with the latest GRIHA and ECBC guidelines.
2. Modeling and Simulations: Conduct whole-building energy modeling, as well as solar and daylighting simulations, as required for certification.
3. Tender Incorporation and Approvals: Submit the complete GRIHA report, vetted by a GRIHA consultant for 3-star rating compliance and ensure it is fully approved by various sections of CENM (E6, E2Plg, E2 Design, E4) before incorporation into the draft tender.$#+/#ҹȈ一瑯㩥䄠汬搠捯浵湥獴⠠敄楳湧愠摮搠慲楷杮⥳猠扵業瑴摥琠桴敤慰瑲敭瑮愠瑦牥愠灰潲慶景†獕牥䤠华䴠湡潤楶愠摮䠠⁑䕃⠠慎祶
畍扭楡⠠敳瑣潩獮䔠′瀨杬Ⱙ䔠⠲敤⥳㑅㙅㍅☬䔠⤸愠摮瘠瑥楴杮映潲䥉⹔桔潣獮汵慴瑮猠慨汬戠畦汬⁹敲灳湯楳汢潦扯慴湩湩污敮散獳牡⁹灡牰癯污⽳低獃映潲潣据牥敮畡桴牯瑩敩⽳敤慰瑲敭瑮吠敨猠潣数猠慨汬椠据畬敤瀠敲慰慲楴湯愠摮猠扵業獳潩景搠慲楷杮⽳潤畣敭瑮ⱳ愠瑴湥楤杮洠敥楴杮ⱳ朠癩湩牰獥湥慴楴湯敢潦敲愠汬挠湯散湲摥愠瑵潨楲楴獥湡慣牲楹杮漠瑵爠癥獩潩獮洯摯晩捩瑡潩獮椠牤睡湩獧愠祮渠浵敢景琠浩獥愠敲畱物摥琠汩楦慮灡牰癯污椠扯慴湩摥汁楬楡潳楮杮潣牯楤慮楴湯瑳瑡瑵牯⁹潣灭楬湡散牴湡灳牯慴楴湯攠灸湥敳ⱳ琠慲敶汬湩档牡敧ⱳ椠据摩湥慴硥数獮獥湡灡牰癯污爭汥瑡摥爠獥潰獮扩汩瑩敩桳污敲瑳攠瑮物汥⁹楷桴琠敨挠湯畳瑬湡吠敨焠潵整慲整桳污敢搠敥敭潴椠据畬敤愠汬猠捵潣瑳ⱳ挠慨杲獥畤楴獥慴數ⱳ映敥ⱳ洠湡潰敷Ⱳ瘠獩瑩ⱳ瀠敲敳瑮瑡潩獮敲楶楳湯ⱳ愠摮愠汬漠桴牥攠灸湥楤畴敲敲畱物摥映牯挠浯汰瑥硥捥瑵潩景琠敨眠牯湡扯慴湩湩灡牰癯污牦浯挠湯散湲摥愠瑵潨楲楴獥桔畱瑯摥爠瑡獥猠慨汬戠牴慥整獡映汵祬椠据畬楳敶湡潮攠瑸慲瀠祡敭瑮眠慨獴敯敶桳污敢洠摡潴琠敨挠湯畳瑬湡⁴湯愠祮愠捣畯瑮戠祥湯桴捡散瑰摥焠潵整浡畯瑮´Ä | 0.65 | Cum | 53 | ₹34.45 |
| 1.01 | The followings bldgs are included in the project, | - | - | - | - |
| 1.03 | (b) Construction of Pump House (4.46x5.46M) - ( Plinth Area 24.35 sqm) | - | - | - | - |
| 1.04 | (c) Construction of Sub station (4.46x5.46M) - ( Plinth Area 24.35 sqm) | - | - | - | - |
| 1.05 | (d) RCC UG Sump for Rain water harvesting storage 2,25,000 Ltrs - 01 No | - | - | - | - |
| 1.06 | (e) RCC UG Sump for fire fighting & domestic purpose storage 1,60,000 Ltrs - 01 No | - | - | - | - |
| 1.07 | (f) RCC Overhead water tank Domestic use 50000 Ltr - 02 No | - | - | - | - |
| 1.08 | (g) RCC overhead water tank for fire fighting use 25000 Ltr - 02 No | - | - | - | - |
| 1.09 | (h) RCC over head water tank for Flushing water 15000 Ltr - 02 No | - | - | - | - |
| 1.1 | (j) All external services and connected items/works - As per Adm approval | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
86084Tender.pdf
Tender Documents • 0.79 MB
BOQ_869029.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid