Tender Value
₹6.2 L
EMD Value
₹6,230
Closing Date
10 Jul 2025, 3:00 pmClosed
BDO (BP)
BDO Office, sattur
Renovation of School Building in PU Primary School at Kundalakuthur Village and Panchayat
2025_RDTN_573447_1
A7/3427/2024
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,230
Yes
11 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
Renovation School Building
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Chipping of concrete and roughening the surface
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification
Providing and Fixing of polyurethane foam for Sloped roofs thermal insulation panels or Sandwich insulated panels with external 0.50mm total coated thickness pre painted Galvalume sheet with trapezoidal roofing profile having crest height of 38mm at every 333mm span , whereas internal 0.50mm total coated thickness pre painted galvanized iron sheet with micro ribbed profile and the insulation material will be chlorofluoro carbon and hydro chlorofluoro carbon free , high performance rigid polyurethane foam (PUF) conforming to IS 12436 having density not less than 40±2Kg/M3, Thermal conductivity (K-Value) 0.024 W/m.K measured at 10 degree C mean temperature along with necessary flashings such as L flashing, C flashing etc& accessories such as screws ,fastners ,sealants etc for fixing the panel etc., complete complying with standard specification. 50mm ( 38mm) thick PUF roof panel
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Providing Blockboard in two layers with first layer in cement mortar 1:5 (one cement and five crushed stone sand)20mm thick and the second layer in Combination mortar 1:1:6(one cement one lime and six crushed stone sand) 20mm thick and providing band all round the block board in c.m 1:5 (one cement and five crushed stone sand) for 20mm thick and 50mm width including cost of one coat of block oxide paint of approved quality complying with standard specification.
Providing Teachers Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cup-board Shutter using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Providing Students Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cheppal Rack arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .