| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1 Rank₹34.6 LAccepted-AOC | 1 Rank | Accepted-AOC First Lowest | |
| 2 | 2 Rank₹37.2 L+₹1.3 L (3.75%)Rejected-AOC | 2 Rank | Rejected-AOC S | |
| 3 | 3 Rank₹37.2 L+₹1.4 L (3.87%)Rejected-AOC | 3 Rank | Rejected-AOC T |
Tender Value
₹36 L
EMD Value
₹36,000
Closing Date
23 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Electricity Transmission Circle-I, U.P. Power Transmission Corporation Ltd. 57- George Town, Prayagraj.
56-ETC-I(A)/ 2020-2021
2020_UPTCL_522029_1
56-ETC-I(A)/ 2020-2021
Open Tender
Electrical Works
Item Rate
365 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,248
S. E. E.T.C. PRAYAGRAJ
₹36,000
18 Dec 2020
17 Oct 2020
24 Oct 2020
17 Oct 2020
23 Oct 2020
17 Oct 2020
120 days
Amount
Annual Maintenance of following 220KV & 132KV transmission lines under ETD-I Prayagraj- 132 KV Soroan- Phulpur SC Line 21.5 132 KV Soraon - Kaurihar SC Line 18.5 132 KV Jhunsi- Soraon SC Line 22 LILO of 132KV Phulpur-Soraon line @ 132KV S/S Kaurihar 20 132KV Jhunsi-Saidabad SC line 19 LILO of 220KV Sarangapur-Phulpur line @ 220KV S/S Jhunsi 7 220KV Phulpur- Sarangapur SC Line 70 132 KV Phulpur-Jhunsi DC Line 20 132 KV Phulpur-IFFCO DC Line. 4 132 KV Phulpur- Saraichandi SC Line 13 132 KV Handia- Gyanpur SC Line 10 132 KV Handia - Saidabad SC Line 10 132 KV Handia - Handia Khas TSS SC Line 3 132 KV Jhunsi-Handia SC Line 35 Total 273
Quarterly routine patrolling of 220KV & 132KV Transmission line and submission of its patrolling report in triplicate copy in prescribed proforma mentioning stole/missing tower parts & tower accessories, tree branches falling in corridor of line, status of jumper, insulators, tower foundation, cooping, chimney, earthing etc.
Emergency patrolling of 220 & 132KV transmission lines during tripping of line as per instruction of supervising engineer to find out the fault in line including arrangement and mobilization of gang on urgent basis.
Lopping, chopping and cutting of tree branches having girth upto 0.5Mtrs falling in the corridor of line with safety to avoid any damage to nearby crops and power/telephone line passing near vicinity of line
Cutting of bamboo bushes falling under corridor of transmission line with safety to avoid any damage to nearby crops and power/telephone line passing near vicinity of line
Fixing of tower parts/bracing with safety to avoid any damage to nearby crops and power/telephone line passing near vicinity of line
Re-fixing and tightening of dislocated/shifted vibration dampers to its place including replacement of fasteners if required in the transmission line
Replacement of jumpers of transmission lines as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site , dismantling of damaged/broken jumper from tension fitting, making of new jumper of proper size and fixing of it at proper place. Cost included all T&P and labour charges but exclude the cost of jumper, fitting, nut/bolt etc.
220KV Transmission line
132KV Transmission line
Replacement of damaged ACSR Panther/Zebra conductor of transmission line under ETD-I Prayagraj as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site, dismantling of damaged/broken conductor with disc insulator, removal of complete/damaged conductor, jointing of new conductor of proper length, stringing of conductor at its place with suitable sag with all other work to complete the job satisfactory. Cost includes all men, T&P but exclude the cost of conductor, fittings, disc insulators etc.
220KV Transmission line
132KV Transmission line
Replacement of damaged/broken disc insulator of transmission line under ETD-I Prayagraj as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site, dismantling of damaged/broken disc insulator from tower, removal of complete/damaged disc insulator, making new disc insulator string with proper number of disc insulators. Then hoisting of disc insulator string at its proper place with conductor. Cost includes all men, T&P but exclude the cost of disc insulators, fittings etc.
220KV Transmission line
132KV Transmission line
Replacement of damaged/broken earthwire of transmission line under ETD-I Prayagraj as and when required. Job consists mobilization of gang on urgent basis, carriage of required material from store to work site, dismantling of damaged/broken earthwire, removal of complete/damaged earthwire, jointing of new earthwire with proper size, stringing of same earthwire at its proper place with proper sag. Cost includes all men, T&P but exclude the cost of earthwire, fittings etc.
132KV Transmission line
Tightening of nut and bolt of all jumpers as per requirement of transmission lines under ETD-I Prayagraj. Job consists replacement of nuts & bolts at both side of jumper, if found melted. Cost includes all men, T&P but exclude the cost of nu/bolt etc.
220KV Transmission line No. of jumper
132KV Transmission line No. of jumper
Making of cooping by proper cleaning of stub with hardwire brush etc to remove complete dust & rust from the rusted surface. Painting of leg with black paint and then making of cooping of proper size on chimney with 1:4 ratio of cement and sand with proper curing for 7days and all other associated works to complete the job satisfactorily including cost of all material, labour and T&P etc.
220KV Transmission line No. of cooping
132KV Transmission line No. of cooping
Height raising of chimney which is below the ground level to avoid rust formation of stub due to contact of soil. Work includes breaking of cooping, chipping and cleaning of top surface for proper adhesiveness and cleaning of stub with hardwire brush to remove complete rust and dust from the surface of stub and then painting of rusted portion with zinc rich primer paint and then making of chimney with 1:2:4 ratio of cement, sand and stone ballast around 50Cm in height from its initial height to avoid rust formation due to contact of soil. Making of coping of proper size on chimney. Proper curing for 7 days and all other associated work to complete the job satisfactorily. Rates include the cost of labor, T&P and material i.e; cement, concrete, sand, paint and required shuttering shall be arranged by contractor at his own cost.
220KV Transmission line No. of chimney
132KV Transmission line No. of chimney
Repairing of badly rusted legs by breaking of chimney at least 700mm depth. Proper cleaning of stub with hardwire brush etc to remove rust and dust from the surface of stub and then making holes in the stubs and fixing of additional galavanised angle of at least 1000mm long with nuts and bolts and then electrical welding with stub in a length of 200mm interval and then increasing the height of chimney around 1/2 feet from its initial height to avoid rust formation due to storage of water with 1:2:4 ratio of cement, concrete and sand. (Rate includes the cost of all material i.e; cement,concrete,sand,paint Galv angles & nuts bolts)
Tack Welding of all the bolts upto the height of one section of tower or 5meter from ground level whichever is higher & application of zinc rich Aluminium paint on the affected surface including cost of all material & T&P etc.
Backfiilling of soil around the tower leg including all earth work, back filling, ramming and levelling etc. including the cost of borrowed earth if required.
Replacement of single suspension string with double suspension string at road crossings by way of removing fitting from tower bracing and lowering the disc insulator string alongwith suspension fitting safely. Removing of disc insulator string from suspension fitting. Fitment of double suspension fitting and propery fitting / tighting of hooks/nuts & bolts etc. Lifting of 2x9nos 70KN disc insulator string and fit these with double suspension fitting. Fitment of conductor with fitting and release of all pulleys, rope etc.(Rates includes all T&P and labour charges and other associated works to perform the job satisfactorily but exlcudes the cost of double suspension fittings, disc insulators which will be provided by UPPTCL)
132KV Transmission line
Rama Power construction
Bhagwati Traders
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .