| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 CrRejected-AOC DOLABICHA LAGUN RANCHI | RANCHI | RANCHI | JHARKHAND | ₹2.2 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹2.3 CrRejected-AOC | ₹2.3 Cr | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical ADD HANUMAN MANDIR ROAD KRISHNAPURI CHUTIA DORANDA CHUTIYA RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | Gaurav Construction L1 | M/s PAWAN KUMAR BHAGAT L2 | M/s Riya Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00(1) Construction of Phy, Chem, Bio lab at UPG GOVT HS BASKARCHA, DIST: LATEHAR, BLOCK:MAHUADANR (20220601001) (2) Construction of Phy, Chem, Bio lab at UPG GOVT HS CHATAKPUR, DIST: LATEHAR, BLOCK:MAHUADANR (20220602301) (3) Construction of Phy, Chem, Bio lab at PROJECT HS CHIPADOHAR, DIST: LATEHAR, BLOCK: BARWADIH (20220505709) (4) Construction of Phy, Chem, Bio lab at RAJYAKRIT +2 GOVT HS CHANDWA, DIST: LATEHAR, BLOCK: CHANDWA (20220203904) (5) Construction of Phy, Chem, Bio lab at RAJKIYA +2 BOYS HS BALUMATH, DIST: LATEHAR, BLOCK: BALUMATH (20220715114) (6) Construction of Phy, Chem, Bio lab at PROJECT HS BARIYATU, DIST: LATEHAR, BLOCK: BARIYATU (20220900207) | ||||||
| 2.00 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and
direction of E/I. | 788.94 | CUM | 151.82 ₹1,19,776.87 | 151.82 ₹1,19,776.87 | 150.67 ₹1,18,869.59 |
| 3.00 | Extra for earth work in hard soil as per specification and direction of E/I. (vide
classfication of soil item - B) 50% of excavated earth | 394.47 | CUM | 15.51 ₹6,118.23 | 15.51 ₹6,118.23 | 15.39 ₹6,070.89 |
| 4.00 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted
volume). | 1,018.66 | CUM | 55.28 ₹56,311.52 | 55.28 ₹56,311.52 | 54.86 ₹55,883.69 |
| 5.00 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted
volume). | 117.27 | CUM | 589.51 ₹69,131.84 | 589.51 ₹69,131.84 | 585.03 ₹68,606.47 |
| 6.00 | Providing designation 75B brick work in
C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of
F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per
building specification and direction of E/I. | 64.69 | CUM | 5,110.91 ₹3,30,624.77 | 5,110.91 ₹3,30,624.77 | 5,072.07 ₹3,28,112.21 |
| 7.00 | Providing designation 75 B brick work in
C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building
specification and direction of E/I. | 476.65 | CUM | 4,527.08 ₹21,57,832.68 | 4,427.08 ₹21,10,167.68 | 5,204.23 ₹24,80,596.23 |
| 8.00 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 136.08 | SQM | 713.49 ₹97,091.72 | 713.49 ₹97,091.72 | 708.07 ₹96,354.17 |
| 9.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 88.68 | CUM | 4,125.41 ₹3,65,841.36 | 4,125.41 ₹3,65,841.36 | 4,094.06 ₹3,63,061.24 |
| 10.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone- III): 6 graded stone aggregate 40 mm
nominal size) | 42.71 | CUM | 4,125.41 ₹1,76,196.26 | 4,125.41 ₹1,76,196.26 | 4,094.06 ₹1,74,857.3 |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
9 Feb 2026, 2:00 pmClosed
State Project Director
Office of State Project Director JEPC
Construction of Phy, Chem, Bio lab in different govt. school at LATEHAR District in palamu Division of jharkhand.
2026_HRD_109816_1
JEPC/CIV/03/2015/2026/273
Open Tender
Civil Works
270 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹4.6 L
3 Jul 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (1) Construction of Phy, Chem, Bio lab at UPG GOVT HS BASKARCHA, DIST: LATEHAR, BLOCK:MAHUADANR (20220601001)
(2) Construction of Phy, Chem, Bio lab at UPG GOVT HS CHATAKPUR, DIST: LATEHAR, BLOCK:MAHUADANR (20220602301)
(3) Construction of Phy, Chem, Bio lab at PROJECT HS CHIPADOHAR, DIST: LATEHAR, BLOCK: BARWADIH (20220505709)
(4) Construction of Phy, Chem, Bio lab at RAJYAKRIT +2 GOVT HS CHANDWA, DIST: LATEHAR, BLOCK: CHANDWA (20220203904)
(5) Construction of Phy, Chem, Bio lab at RAJKIYA +2 BOYS HS BALUMATH, DIST: LATEHAR, BLOCK: BALUMATH (20220715114)
(6) Construction of Phy, Chem, Bio lab at PROJECT HS BARIYATU, DIST: LATEHAR, BLOCK: BARIYATU (20220900207) | - | - | - | - |
| 2 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and
direction of E/I. | 788.94 | CUM | - | - |
| 3 | Extra for earth work in hard soil as per specification and direction of E/I. (vide
classfication of soil item - B) 50% of excavated earth | 394.47 | CUM | - | - |
| 4 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted
volume). | 1,018.66 | CUM | - | - |
| 5 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted
volume). | 117.27 | CUM | - | - |
| 6 | Providing designation 75B brick work in
C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of
F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening maerials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per
building specification and direction of E/I. | 64.69 | CUM | - | - |
| 7 | Providing designation 75 B brick work in
C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building
specification and direction of E/I. | 476.65 | CUM | - | - |
| 8 | Providing designation 125 mm thick reinforced designation 75A brick work in CM (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 25 including the cost of screening, carriage of materials, scaffolding , raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. | 136.08 | SQM | - | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 88.68 | CUM | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone- III): 6 graded stone aggregate 40 mm
nominal size) | 42.71 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
1.pdf
Tender Documents • 13.65 MB
BOQ_148372.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid