| 1 | L2₹36.7 L+₹6,202.71 (0.17%)Accepted-AOC MILIJULI PATH BELTOLA HATIGAON GUWAHATI KAMRUP METRO ASSAM 781028 | GUWAHATI | KAMRUP METRO | ASSAM | 781028 | L2 | Accepted-AOC Contract Awarded | |
| 2 | L1₹36.6 LRejected-AOC | L1 | Rejected-AOC Contract not Awarded | |
| 3 | Rejected-Technical VILL KACHARI SOLMARI P O P S RANGIA DIST KAMRUP R ASSAM | RANGIA | KAMRUP R | ASSAM | - | Rejected-Technical Not admitted |
Tender Value
₹37.5 L
EMD Value
₹74,919
Closing Date
30 Jul 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
Directorate of Soil Conservation Assam Guwahati-05
Riverine Land Protection Project at Pub-Par Jatia Bhangra Village under RIDF-XXV, 2019-20
2020_SCD_18177_2
E-TEN-1/2020-21/896-A
Open Tender
Civil Works
Item Wise
1095 days
Nalbari
Please refer Tender documents.
4 documents required · 4 mandatory
₹700
Director
₹74,919
Yes
11 Sept 2020
22 Jul 2020
30 Jul 2020
22 Jul 2020
30 Jul 2020
24 Jul 2020
999 days
Amount
PART – A (Construction of Earthen Embankment)
Earth work by head load in filling embankment in layers not exceeding 20 cm thick including breaking clods dressing and sectioning, cambering ramming within a lead up to 30 m and lift up to 1.50 m etc. completed as directed (12.50% will be deducted on the total volume for shrinkage of Soil)
PART – B (Construction of Boulder Pitching Works)
Earth work in excavation including removing the spoils as directed up to a distance of 100 m. including dressing, cambering, grading the surface etc. complete as directed for easing the side slope of the river bank and for foundation of cushion.
Providing & laying of boulder apron laid in wire crates made with 4mm dia G.I. wire conforming to IS :280 & 4826 in 100 mm X 100 mm Mesh (Weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg. each.
(i) Toe Wall
(ii) Boulder Pitching
PART – C (i) (Construction of 2 Nos. RCC Slab Culvert proposed on the Earthen Embankment)
Earth work in excavation of foundation of structure as per drawing and technical specification including setting out, Construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilizing the remaining earth locally for road work..
Providing brick soling inearthen shoulder with stone/best quality jhama brick, sand packed and laid to true line and level and in panel after preparing the sub grade including earthwork in excavation as directed including all labour and materials and if necessary dewatering etc. complete as directed.
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation.
Reinforcement cement concrete work in sub structure complete as per drawing and technical specification.
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering as per drawing and technical specifications (0.25 thick)
Plastering with cement mortar (1:3) on brick work in sub-structure complete as per technical specifications.
PART – C (ii) (Construction of 2 Nos. RCC Slab Culvert proposed on the Earthen Embankment)
Earth work in excavation of foundation of structure as per drawing and technical specification including setting out, Construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilizing the remaining earth locally for road work..
Providing brick soling inearthen shoulder with stone/best quality jhama brick, sand packed and laid to true line and level and in panel after preparing the sub grade including earthwork in excavation as directed including all labour and materials and if necessary dewatering etc. complete as directed.
Plain cement concrete 1:3:6 normal mix in foundation with crushed stone aggregate 40 mm normal size mechanically mixed, placed in foundation.
Reinforcement cement concrete work in sub structure complete as per drawing and technical specification.
Supplying, fitting and placing TMT bar reinforcement in substructure complete as per drawing and technical specifications.
Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering as per drawing and technical specifications (0.25 thick)
Plastering with cement mortar (1:3) on brick work in sub-structure complete as per technical specifications.
RANJAN DAS
stage.html
html • 0.04 MB
techsummary_28081.pdf
PDF • 0.57 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_28081.pdf
PDF • 0.86 MB
PUBPAR.pdf
PDF • 0.86 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .