| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC | ₹31.6 L | L1 | Accepted-AOC Accept |
| 2 | L2₹32.1 LRejected-Finance | ₹32.1 L | L2 | Rejected-Finance Above Contractor Value |
| Sl No | Description | Qty | Unit | Nallathambi S L2 | DHARMARAJ G L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Strengthening of the road from Kariyanur to Jayanthi Colony road (R-59) KM 0/000 - 0/850
Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 529.2 | M2 | 8 ₹4,233.60 | 7 ₹3,704.40 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 88.2 | M3 | 145 ₹12,789 | 140 ₹12,348 |
| 3.00 | Spreading the collected US gravel to 150mm thick watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers | 75.34 | M3 | 400 ₹30,136 | 395 ₹29,759.30 |
| 4.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 3,146.37 | M2 | 40 ₹1.3 L | 34 ₹1.1 L |
| 5.00 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 charges etc., | 157.33 | M3 | 9,250 ₹14.6 L | 9,203 ₹14.5 L |
| 6.00 | BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 78.66 | M3 | 11,825 ₹9.3 L | 11,763 ₹9.3 L |
| 7.00 | Road Marking with hot applied thermoplastic compound with reflectorising glass base on bituminouse surface | 167.42 | M2 | 900 ₹1.5 L | 890 ₹1.5 L |
| 8.00 | Provision for HM ,Km Stone charges etc complete | 4 | Nos | 600 ₹2,400 | 574 ₹2,296 |
| 9.00 | Provision for Name Board | 1 | Nos | 4,650 ₹4,650 | 4,500 ₹4,500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 4,88,916 ₹4.9 L | 4,82,719 ₹4.8 L |
Tender Value
₹31.7 L
EMD Value
₹32,000
Closing Date
5 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER
PANCHAYAT UNION OFFICE VEPPANTHATTAI
Strengtheing Kariyanur jayanthi colony road (850M)
2026_RDTN_667143_1
A3/0574/2026 24.02.2026
Open Tender
Civil Works - Roads
180 days
PANCHAYAT UNION OFFICE
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹32,000
Yes
12 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
1.Strengthening of the road from Kariyanur to Jayanthi Colony road (R-59) KM 0/000 - 0/850 Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Spreading the collected US gravel to 150mm thick watering and hand roller rolling including cost and supply of well Gravel from approved quarry and stacking to departmental gauge for premeasurements etc complete as per standard specifications and as directed by the departmental officers
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504 charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic compound with reflectorising glass base on bituminouse surface
Provision for HM ,Km Stone charges etc complete
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Tendernotice_1.pdf
PDF • 0.85 MB
PARTI.pdf
Tender Documents • 0.82 MB
PARTII.pdf
Tender Documents • 0.66 MB
BOQ_801450.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid