Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance | L1 | Accepted-Finance Accepected |
| Sl No | Description | Qty | Unit | Krishnan Velmurugan L1 |
|---|---|---|---|---|
| 1.00 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual | 3 | Per Pit | 600 ₹1,800 Lowest |
| 2.00 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual | 3 | Per Pole | 650 ₹1,950 Lowest |
| 3.00 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual | 25 | Per Pit | 500 ₹12,500 Lowest |
| 4.00 | Excavation of pole pit for pole upto 8.00m length Hard Soil by using JCB/Manual | 15 | Per Pit | 750 ₹11,250 Lowest |
| 5.00 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual | 40 | Per Pole | 550 ₹22,000 Lowest |
| 6.00 | Fixing of V Cross Arm/Tapping X-Arm/Guarding X-Arm | 22 | Per | 210 ₹4,620 Lowest |
| 7.00 | Fixing of 11 KV Strain Disc | 24 | Per | 110 ₹2,640 Lowest |
| 8.00 | Fixing of 11 KV Polymer Composite Pin Insulator | 45 | Per | 60 ₹2,700 Lowest |
| 9.00 | Fixing of HT/LT TI Fittings | 14 | Per | 60 ₹840 Lowest |
| 10.00 | Excavation of Stay pit of 4.5 ' to 5 ' depth in Hard Soil by using JCB / Manual | 10 | Per Pit | 700 ₹7,000 Lowest |
Tender Value
Refer Docs
Closing Date
4 Aug 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Arcot
110KV SS Arcot Campus Thazhanur
Improvement Proposal for replacement of exg.damagedpsc pole 13 nos in to psc pole 8.0 mtr and insertion of psc pole 8.0 mtr 4 nos due to increase low ground clearance and Others Nos Work in (2.DCW-Thiru.R.Pannerselvam S/o Ramalingam, Mambakkam, 3.DCW
2025_EB_583043_1
EE3/S.039
Limited
Electrical Works
Works
Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
8 Aug 2025
19 Jul 2025
5 Aug 2025
19 Jul 2025
4 Aug 2025
19 Jul 2025
Amount
Excavation of pole pit for pole above 8.00m length by using JCB/Manual
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual
Excavation of pole pit for pole upto 8.00m length by using JCB/Manual
Excavation of pole pit for pole upto 8.00m length Hard Soil by using JCB/Manual
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual
Fixing of V Cross Arm/Tapping X-Arm/Guarding X-Arm
Fixing of 11 KV Strain Disc
Fixing of 11 KV Polymer Composite Pin Insulator
Fixing of HT/LT TI Fittings
Excavation of Stay pit of 4.5 ' to 5 ' depth in Hard Soil by using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc..
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or AAAC or other equivalent conductor
Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor
Fixing of LT 1 phase cross arm
Fixing of LT 3 phase cross arm
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or AAAC or other equivalent conductor
Fixing of LT Shackle
Fixing of Alu Knob
Fixing of LT Pin Insulator
Transportation of all type of poles and sizes of poles and other associated materials from road side to pole pit and vice versa upto 5 KM
Transportation of all type of poles by bullock cart or other vehicle (ii) Above 5 KM of lead of every KM (7 x 75 = Rs.525)
Dismantling of RCC,REC,PSC & metal pole of all sizes including the closing of the pit
Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + Labour) (i) Mass Concreting of poles
(i) Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Dismantling of line materials cross arm, clamps, TI Fittings etc..,
Dismantling of conductor upto7/3.35 mm including stocking of the coils to the nearest side
Dismantling of stay set with out rod
Dismantling of stay set complete (i) including stay rod
Resagging of one run of all sizes of conductor (i) 7/2.50 mm AAAC 7/2.59mm ACSR
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .