17 conditions · 6 needing a document upload
Standard Financial Criteria 1 As per IRSGCC (latest)
Document required
Special Technical Criteria 1 Please submit a certificate in the prescribed format (Annexure-V, IRGCC April 2022) for verification / confirmation of the documents submitted for compliance of eligibility / qualifying criteria. Non submission of this certificate, or prescribed format shall lead to summary rejection of your offer.
Document required
2 The tenderer should have valid Electrical Contractors License Grade "A" / 33kV or above issued by Govt. Electrical License Board (OR) the site Supervisor should possess necessary "A" Grade / 33kV or above License issued by a Government Licensing Authority to carryout works of appropriate voltage. The license should have been issued on a date prior to date of tender opening. A copy of valid license shall be submitted with the offer. Offer without valid license shall be summarily rejected.
Document required
3 Similar nature of work for OHE works (Vide Headquarters letter No. E.252/Tr.D/Policy/VII dt.04.09.2025 ): "Erection, testing and commissioning of 25kV Overhead Electric Equipment in Railways (OR) Construction and commissioning of transmission line of 66kV or above voltage of requisite value as per the technical eligibility criteria. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of transmission line work produced to satisfy technical eligibility criteria (OR) Provision or modification to sub-stations/switching stations/switch gear equipment, control and protection equipment, reactors, power factor correction equipment, transformers or any other power equipment in 25 kV Railway Sub- stations/Switching stations or any work pertaining to 66kV and above Electrical sub-station of any PSU/Govt. agencies. In addition, tenderer shall also have experience of having energized 25 kV OHE work of at least 10 TKM or 20% of TKM involved in instant tender whichever is higher from single completed or ongoing work either as separate additional work or as a part of above Substations/Switching stations work produced to satisfy technical eligibility criteria"
Document required
4 Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) /Limited Liability Partnership (LLP) etc. Please submit a certificate in the prescribed format Annexure V(A) (please download the format from the link given below). Non submission of the certificate, or submission of certificate either not properly filled in, or in a format other than the prescribed format shall lead to summary rejection of your offer
Document required
Show 3 more groups Compliance & Declarations 30 conditions · 4 needing a document upload
Commercial-Compliance 1 Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Document optional
General Instructions 1 The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Senior Divisional Electrical Engineer/Traction Distribution/ Secunderabad Division/ South Central Railway / Secunderabad - 500025. In submitting the tender it would be deemed that the tenderer has kept himself fully Informed of the provision of the Indian Railways Standard General Conditions of Contract including all corrections and Amendments issued upto date and claim that he is not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
2 STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Senior Divisional Electrical Engineer/Traction Distribution/ Secunderabad Division/ South Central Railway/ Secunderabad - 500025. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
3 DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalised by the Railway and will, therefore, be supplied to the contractor as and when they are finalised on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.
4 Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED
5 If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed.
6 CORRIGENDUM NOTICE ON IREPS: [I] Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III] To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders.
7 E-Tender shall be rejected if it is not accompanied by the prescribed: [1] Cost of tender document [2] EMD [3] Certificate(s) in support of technical eligibility criteria [4] Certificate(s) in support of financial eligibility criteria [5] Copy of documents in support of Proprietary concern/ Partnership firm / Pvt.Ltd.company / Limited Company / JV firm / Valid MOU for JV firms as detailed in COMMERCIAL COMPLIANCE.
8 The bidders/tenderers should ensure that they are GST compliant. Quoted rates are inclusive of applicable GST as per GST ACT -2017 amended from time to time and as detailed in Special Conditions - General (under TAXES clause).
9 The tenderer[s] may also upload the following documents alongwith his/their tender: The tenderer may upload method statement, which shall contain organizational set up and working systems to be adopted by the successful tenderers during the operation of the contract. It shall contain the details of man power and machineries in the prescribed format and details of methodology for planning, execution, monitoring and completion of the project. The methodology so adopted shall suit to the nature of work and shall also comply fully with best practice and current regulations. A comprehensive detailing for each activity like setting-up organization, safety plan, execution plan, quality assurance plan, sequence of work to achieve the mile stones, ensure targeted progress and quality and inturn deployment of resources, risk analysis and its mitigation strategy shall be given communication arrangement within his organization and with the railways for decisions, progress or any other matter connected with this project to ensure full information about the project including progress of work at different time scale shall also be furnished.
10 Tenderer shall adhere to the time frame as mentioned in mile stone chart prescribed in the tender.
11 Tenderer shall engage the personnel with requisite qualification as per Special Conditions of Contract.
12 Tenderer shall deploy adequate number of plant and equipment for the execution of subject contract works to achieve progress as per mile stone chart.
13 List of works completed in the last seven financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work. Date of actual start, actual completion and final value of contract should also be given.
14 List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award.
15 Supportive documents/certificates from the organizations with whom they worked/are working as list of works completed and list of works on hand should be enclosed
16 I/ We have visited the works site and I / We am / are aware of the site conditions.
17 [1] I/We have read the various conditions of the tender attached hereto and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for the period mentioned in the tender document [NIT HEADER] from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money Deposit submitted. [2] I/We offer to do the work at the percentage rates quoted by me/us in the attached schedule and bind myself/ourselves to complete the work within the period of completion given in this tender document [NIT HEADER] from the date of issue of letter of acceptance of this tender. I/We also hereby agree to abide by the IRS GCC and Special Conditions of contract in carryingout the works laid down by South Central Railway for the present contract. [3] The full value of the earnest money paid shall stand forfeited without prejudice to any other rights or remedies of the railway if [a]I/We do not execute the contract document within seven days after receipt of notice issued by the Railway that such documents are ready: OR [b] I/We do not commence the work within fifteen days after receipt of orders to that effect. [4] Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
18 I/We fail to submit the requisite Performance Guarantee [P.G] in the prescribed format within the time limit as prescribed in GCC (as amended from time to time) from the date of issue of Letter of Acceptance, we are aware that the contract shall be terminated duly forfeiting EMD and other dues, if any payable against the contract. Also, I/We shall be debarred from participating in the retender for the work.
19 I/We understand that no post-tender correspondence will be entertained, however, if any clarification is required by the Railway, the same will be sought from the tenderer. Also, I/We are aware that any Certificate/ Documents offered after the tender opening shall not be given any credit and shall not be considered.
20 I/we do hereby solemnly affirm and state on behalf of the tenderer including its constituents as under:
21 [i] I/We the tenderer(s) am/are signing this document after carefully reading the contents. [ii] I/We declare and certify that I/We have not made any misleading or false representation in the documents, forms, statements attached in proof of the qualification requirements. [iii] I/We also understand that my/our offer will be evaluated based on the documents/credentials uploaded alongwith the offer and the same shall be binding upon me/us. [iv] I/We declare that the information and the documents attached alongwith the tender by me/us are correct and I/We are fully responsible for the correctness of the information and the documents submitted by us.
22 [i] I/We do hereby undertake that, if any of the certificates regarding eligibility criteria submitted by us are found to be forged/false/incorrect at any time during the process of evaluation of the tenders, it shall lead to forfeiture of the tender EMD. Further, I/We and all my/our constituents understand that my/our offer shall be summarily rejected. [ii] I/We also understand that, if the certificates submitted by us are found to be false/forged/ incorrect at any time after the award of the contract, it will lead to termination of the contract besides suspending of business for 5 years, with the tenderer and with all the partners in case of partnership firm and with all the members of a JV in case of a Joint Venture, forfeiture of EMD/SD and Performance Guarantee and any other action provided in the contract.
23 It is certified that I/We have not been blacklisted or debarred by railways or any other ministry/ department/public sector undertaking of the government of India/State Government from participation in tenders/contract on the date of tender opening of bids, either in individual capacity or as a member of JV firm in which I/We were/are members.
24 I/We indemnify and save harmless the Railway from and against all actions, suit proceedings losses, costs, damages, charges, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the Contractor, his agents or employees, in the execution of the works or in his guarding of the same. All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the actual loss or damage sustained, and whether or not any damage shall have been sustained.
Show 2 more groups 225 items across 161 schedules · ₹3,53,21,519.16 total
1-SCHEDULE A1: OHE & PSI ITEMS Item- 1 1(d)Supply and Installation of Traction Working Rule Diagram Boards
# Description Unit Qty Rate Amount 1 Supply and Erection Square Foot 120.00 1,271 1,52,520 Schedule total ₹1,52,520
1-SCHEDULE A1: OHE & PSI ITEMS Item- 2 1(g) Design and Preparation of Structure Erected Drawing (SED).
1-SCHEDULE A1: OHE & PSI ITEMS Item- 3 3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations.
1-SCHEDULE A1: OHE & PSI ITEMS Item- 4 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 5 3(e)Supply and Erection of Guy Rod Assembly
1-SCHEDULE A1: OHE & PSI ITEMS Item- 6 4(a)(i) Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 7 4(a)(ii) Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 8 4(a)(iii) Erection of Three Cantilever Assemblies on same structure or support for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 9 7436.00 8(a)(v) Supply and Erection of Regulating Equipment WithCounter-Weightassembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 10 8(a)(xii)Marking/Painting of temperature and 'Y' - MeasurementonOHEStructuresatBWA locations.
1-SCHEDULE A1: OHE & PSI ITEMS Item- 10 8(a)(xii)Marking/Painting of temperature and 'Y' - MeasurementonOHEStructuresatBWA locations.
1-SCHEDULE A1: OHE & PSI ITEMS Item- 12 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 13 17920.00 149136.00 9(a) Supply (without Insulators) and Erection of Anti-creepwithgalvanizedsteelwirefor Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 14 50744.00 9(c)Supply (without Insulators) and Erection of Anti-creep with cadmium copper catenary wire for Conventional OHE in polluted area (excluding supply of cadmium copper catenary wire)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 14 50744.00 9(c)Supply (without Insulators) and Erection of Anti-creep with cadmium copper catenary wire for Conventional OHE in polluted area (excluding supply of cadmium copper catenary wire)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 16 11(a)(i) Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator.
1-SCHEDULE A1: OHE & PSI ITEMS Item- 17 11(a)(ii) Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator.
1-SCHEDULE A1: OHE & PSI ITEMS Item- 18 11(b) Supply (without Insulator) and Erection of 25 kV Post Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 20 12(c) Erection of Light Weight Section Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 21
1-SCHEDULE A1: OHE & PSI ITEMS Item- 23 13(c)Supply and Erection of Earth Contact Assembly for an Isolator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 24 13(d)Supply and Erection of an Interlocking device
1-SCHEDULE A1: OHE & PSI ITEMS Item- 24 13(d)Supply and Erection of an Interlocking device
1-SCHEDULE A1: OHE & PSI ITEMS Item- 26 15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 27 16(a) Supply and Erection of Structure Bond
1-SCHEDULE A1: OHE & PSI ITEMS Item- 28 16(b) Supply and Erection of Longitudinal Bond
1-SCHEDULE A1: OHE & PSI ITEMS Item- 29 16(c) Supply and Erection ofTransverse & Special Bond
1-SCHEDULE A1: OHE & PSI ITEMS Item- 30 16(aa) Drilling of Holes on Rails
1-SCHEDULE A1: OHE & PSI ITEMS Item- 31 16(d)Supply and Erection of Structure Bond on Platform Area
1-SCHEDULE A1: OHE & PSI ITEMS Item- 32 17(a) Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc.
1-SCHEDULE A1: OHE & PSI ITEMS Item- 33 17(b)Supply and Erection of Earth Bus
1-SCHEDULE A1: OHE & PSI ITEMS Item- 34 4392.00 1920.00 6312.00 31(a)Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support
1-SCHEDULE A1: OHE & PSI ITEMS Item- 35 31(b) Provision of additional bracket assembly/assemblies on a mast or support
1-SCHEDULE A1: OHE & PSI ITEMS Item- 36 31(c) Dismantling of Overhead Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 37 31(e)Splicing and Extension of Anchored OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 38 31(f)Dismantling of Section Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 39 31(g)Slewing and Putting back of OHE in original position
1-SCHEDULE A1: OHE & PSI ITEMS Item- 40 31(h)Dismantling of an Isolator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 41 31(i) Dismantling of Post Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 42 31(j)(i) Dismantling of Suspension Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 43 31(j)(ii) Dismantling of Cut-in Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 44 31(k)(i) Dismantlement of OHE Mast or structure by cutting
1-SCHEDULE A1: OHE & PSI ITEMS Item- 45 31(k)(ii) Dismantlement of Upright of TTC/Portal by cutting
1-SCHEDULE A1: OHE & PSI ITEMS Item- 46 31(l)(i) Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc
1-SCHEDULE A1: OHE & PSI ITEMS Item- 47 31(l)(ii) Removal of OHE Masts on Bridges
1-SCHEDULE A1: OHE & PSI ITEMS Item- 48 31(n) Dismantling of Guy Rod
1-SCHEDULE A1: OHE & PSI ITEMS Item- 49 12576.00 31(o) Releasing of Multiple Cantilever Crossarm cantilever assemblies where single cantilever assembly is leftover
1-SCHEDULE A1: OHE & PSI ITEMS Item- 50 31(p) Dismantling of Drop Arms/Booms/ Temporary Masts
1-SCHEDULE A1: OHE & PSI ITEMS Item- 51 31(s) Dismantling of Fabricated Steel or Small Parts Steel (SPS)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 52 1701.60 31(t)(i Dismantling of a Regulating Equipment (Three- pulley type) with counter weight assembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 53 31(t)(iii) Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire
1-SCHEDULE A1: OHE & PSI ITEMS Item- 54 31(t)(iv)Dismantling of all types of Copper Jumpers
1-SCHEDULE A1: OHE & PSI ITEMS Item- 55 31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 56 31(t)(ix) Re-adjustment of OHE Spans, including droppers
1-SCHEDULE A1: OHE & PSI ITEMS Item- 57 31(t)(x) Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond
1-SCHEDULE A1: OHE & PSI ITEMS Item- 57 31(t)(x) Dismantling of Structure Bond / Longitudinal Bond / Transverse and Special Bond
1-SCHEDULE A1: OHE & PSI ITEMS Item- 59 32/3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) under power block
1-SCHEDULE A1: OHE & PSI ITEMS Item- 60 32/3(e) Supply and Erection of Guy Rod Assembly under power block
1-SCHEDULE A1: OHE & PSI ITEMS Item- 61
1-SCHEDULE A1: OHE & PSI ITEMS Item- 62 86400.00 86400.00 32/4(a)(ii) Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE 1 Labour / Erection Each 20.00 1619.00 Total 32380.00 32380.00 32/4(a)(iii) Erection of Three Cantilever Assemblies on same structure or support for Conventional Item- 63 OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 64 32/8(a)(v) Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 64 32/8(a)(v) Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 66 32/8(b)(ii) Erection of Materials for Termination of Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 67 32/9(a) Erection of Anti-creep with galvanized steel wire for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 67 32/9(a) Erection of Anti-creep with galvanized steel wire for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 69 6744.00 6744.00 32/10(a) Extra on item 6(a) or 6(c) for Supply and Erection of additional fittings required at a turnout, cross-over or overlap
1-SCHEDULE A1: OHE & PSI ITEMS Item- 70 32/11(a)(i) Erection of 25 kV Solid Core Cut-in Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 71 32/11(a)(ii) Erection of 25 kV Solid Core Suspension Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 72 32/11(b) Erection of 25 kV Post Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 73 5376.00 32/12(a) Supply (without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 74 32/12(c) Erection of Light Weight Section Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 75
1-SCHEDULE A1: OHE & PSI ITEMS Item- 77 32/15(a) Supply and Erection of 50 sq.mm Copper Jumper (C Jumper, F-Jumper, Anti-Theft Jumper)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 78 32/15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 79 10880.00 10880.00 32/31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Cantilever Assembly from old Mast or Support
1-SCHEDULE A1: OHE & PSI ITEMS Item- 80 32/31(b) Provision of additional bracket assembly/assemblies on a mast or support
1-SCHEDULE A1: OHE & PSI ITEMS Item- 81 32/31(c) Dismantling of Overhead Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 82 32/31(e) Splicing and Extension of Anchored OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 83 32/31(f) Dismantling of Section Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 84 32/31(g) Slewing and Putting back of OHE in original position
1-SCHEDULE A1: OHE & PSI ITEMS Item- 85 32/31(h) Dismantling of an Isolator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 86 32/31(i) Dismantling of Post Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 87 32/31(j)(i) Dismantling of Suspension Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 88 32/31(j)(ii) Dismantling of Cut-in Insulator
1-SCHEDULE A1: OHE & PSI ITEMS Item- 89 32/31(k)(i) Dismantlement of OHE Mast or structure by cutting
1-SCHEDULE A1: OHE & PSI ITEMS Item- 90 32/31(k)(ii) Dismantlement of Upright of TTC/Portal by cutting
1-SCHEDULE A1: OHE & PSI ITEMS Item- 91 32/31(l)(i) Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc
1-SCHEDULE A1: OHE & PSI ITEMS Item- 92 32/31(l)(ii) Removal of OHE Masts on Bridges
1-SCHEDULE A1: OHE & PSI ITEMS Item- 93 32/31(n) Dismantling of Guy Rod
1-SCHEDULE A1: OHE & PSI ITEMS Item- 94 12576.00 12576.00 32/31(o) Releasing of Multiple Cantilever Cross arm cantilever assemblies where single cantilever assembly is leftover
1-SCHEDULE A1: OHE & PSI ITEMS Item- 95 32/31(p) Dismantling of Drop Arms/Booms/ Temporary Masts
1-SCHEDULE A1: OHE & PSI ITEMS Item- 96 32/31(s) Dismantling of Fabricated Steel or Small Parts Steel (SPS)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 97 1701.60 32/31(t)(i) Dismantling of a Regulating Equipment (3-pulley type) with counter weight assembly for Conventional OHE
1-SCHEDULE A1: OHE & PSI ITEMS Item- 98 32/31(t)(iii) Dismantling of Anti-creep with galvanized steel wire or cadmium catenary wire
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type)
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135 41(i)Supply and Erection of Enamel Protected Area Board
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135 41(i)Supply and Erection of Enamel Protected Area Board 12744.00 11800.00 1432.00 13232.00 41(j) Supply and Erection of Retro-Reflective Sigma Board
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135 41(i)Supply and Erection of Enamel Protected Area Board 12744.00 11800.00 1432.00 13232.00 41(j) Supply and Erection of Retro-Reflective Sigma Board 41(k)Supply and Erection of Vitreous Enameled TSS/SP/SSP Name Board
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135 41(i)Supply and Erection of Enamel Protected Area Board 12744.00 11800.00 1432.00 13232.00 41(j) Supply and Erection of Retro-Reflective Sigma Board 41(k)Supply and Erection of Vitreous Enameled TSS/SP/SSP Name Board 2864.00 13904.00 11176.00 358.00 11534.00 41(l)Supply and Erection of set of Isolator operation OPEN/CLOSE boards
1-SCHEDULE A1: OHE & PSI ITEMS Item- 99 32/31(t)(iv) Dismantling of all types of Copper Jumpers 3360.00 3360.00 32/31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment 1 Item- 101 10300.00 10300.00 32/31(t)(ix) Re-adjustment of OHE Spans, including droppers 34(f)Exacavation of Earth, filling including compaction in all kinds of soil 28800.00 28800.00 2880.00 2880.00 2880.00 2880.00 348000.00 39(a)Erection of Released Guy Rod 1 Item- 111 16800.00 16800.00 Total 38 Transportation of OHE structures / Materials / Equipments 1 Item- 110 76600.00 76600.00 37(b) Loading of all types of Copper & Aluminium conductors 1 Item- 109 37(a) Unloading of all types of Copper & Aluminium conductors 1 Item- 108 1331800.00 1331800.00 36(b) Loading of all types of Steel Structures 1 Item- 107 36(a) Unloading of all types of Steel Structures 1 Item- 106 29800.00 34(k)Supply and Spreading of 20 mm ballast at TSS/SSP/SP yards 1 Item- 105 29800.00 34(j)Providing and Laying Pitching with Stone Boulders 1 Item- 104 39(c)Erection of Released Regulating Equipment 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 14980.00 14980.00 13440.00 13440.00 32 / 39(b) Erection of Released Cantilever Assembly 1 Item- 121 32 / 39(a) Erection of Released Guy Rod 1 Item- 120 7420.00 7420.00 39(j)Erection of Released Anti-creep 1 Item- 119 39(i)Erection of Released Copper Jumper 1 Item- 118 22400.00 22400.00 39(h)Erection of Released 25 kV Single Pole Isolator 1 Item- 117 39(g)Erection of Released Section Insulator 1 Item- 116 67152.00 39(f)Erection of Released 25 kV Post Insulator 1 Item- 115 67152.00 39(d)Erection of Released Termination 1 Item- 114 296500.00 296500.00 32 / 39(c)Erection of Released Regulating Equipment 32 / 39(d) Erection of Released Termination 17812.00 17812.00 8156.00 8156.00 10880.00 10880.00 32 / 39(j) Erection of released Anti creep 1 Item- 128 7420.00 7420.00 32 / 39(i) Erection of Released Copper Jumper 1 Item- 127 32 / 39(h) Erection of Released 25 kV Single Pole Isolator 1 Item- 126 22400.00 32 / 39(g) Erection of Released Section Insulator 1 Item- 125 22400.00 32 / 39(f) Erection of Released 25 kV Post Insulator 1 Item- 124 14980.00 14980.00 40(a) Supply and Erection of Number Plate (Enamel Type) 197120.00 40(b) Supply and Erection of Number Plate (Retro-Reflective Type) 8664.00 179.00 Total Item- 132 716.00 9380.00 41(c) Supply and Erection of Enamel type Staff Caution board 5136.00 716.00 5852.00 41(f)Supply and Erection of Enamel type Caution Clearance to OHE nearby Restricted Board 1 Item- 136 716.00 14356.00 179.00 Total 13640.00 41(e) Supply and Erection of Retro-Reflective Type Power Block Working Limit Board 1 Item- 135 41(i)Supply and Erection of Enamel Protected Area Board 12744.00 11800.00 1432.00 13232.00 41(j) Supply and Erection of Retro-Reflective Sigma Board 41(k)Supply and Erection of Vitreous Enameled TSS/SP/SSP Name Board 2864.00 13904.00 11176.00 358.00 11534.00 41(l)Supply and Erection of set of Isolator operation OPEN/CLOSE boards 6876.00 42Supply and Erection of Shock Treatment Chart
2-SCHEDULE A2: FOUNDATION ITEMS (incl. Supply & Erection) Item- 143 2(a)(i) Concrete for foundations and plinth in Hard Soil Supply and Erection cum 16.00 10004.00 160064.00 Total 160064.00 Supply and Erection cum 16.00 10259.00 164144.00 Total 164144.00
2-SCHEDULE A2: FOUNDATION ITEMS (incl. Supply & Erection) Item- 143 2(a)(i) Concrete for foundations and plinth in Hard Soil Supply and Erection cum 16.00 10004.00 160064.00 Total 160064.00 Supply and Erection cum 16.00 10259.00 164144.00 Total 164144.00 2(b) Concrete for foundations and plinth in other than Hard and Rock Soil 1 Item- 146 2(a)(ii) Concrete for foundations and plinth in Rocky Soil 1 Item- 145 12737400.00 12737400.00 2(i) Breaking of foundation up to 200 mm below track formation and drain / PF surface etc
3-SCHEDULE B1: STEEL SUPPLY Item- 147 3(as) Supply of Rolled or Fabricated and Galvanized Traction Masts, Switching Station Masts, AT masts, Feeder masts etc (B/200-20, B/150-4)
3-SCHEDULE B1: STEEL SUPPLY Item- 147 3(as) Supply of Rolled or Fabricated and Galvanized Traction Masts, Switching Station Masts, AT masts, Feeder masts etc (B/200-20, B/150-4)
3-SCHEDULE B1: STEEL SUPPLY Item- 147 3(as) Supply of Rolled or Fabricated and Galvanized Traction Masts, Switching Station Masts, AT masts, Feeder masts etc (B/200-20, B/150-4)
4-SCHEDULE B2: COPPER SUPPLY Item- 150 6(cs) Supply of 7 mm dia Hard Drawn Round Copper Dropper Wire
4-SCHEDULE B2: COPPER SUPPLY Item- 150 6(cs) Supply of 7 mm dia Hard Drawn Round Copper Dropper Wire 6(ds) Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire
4-SCHEDULE B2: COPPER SUPPLY Item- 150 6(cs) Supply of 7 mm dia Hard Drawn Round Copper Dropper Wire 6(ds) Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire
4-SCHEDULE B2: COPPER SUPPLY Item- 150 6(cs) Supply of 7 mm dia Hard Drawn Round Copper Dropper Wire 6(ds) Supply of 5 mm dia Hard Drawn Round Copper Dropper Wire 312500.00 312500.00 15(as) Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire 1 Item- 153 270000.00 63050.00 63050.00 15(bs) Supply of 160 sq.mm Annealed Stranded Copper Jumper Wire
5-SCHEDULE B3: INSULATOR SUPPLY Item- 154 4(ax) Supply of Porcelain Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv)
5-SCHEDULE B3: INSULATOR SUPPLY Item- 154 4(ax) Supply of Porcelain Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv)
5-SCHEDULE B3: INSULATOR SUPPLY Item- 154 4(ax) Supply of Porcelain Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv) 56.00 4145.00 232120.00
5-SCHEDULE B3: INSULATOR SUPPLY Item- 154 4(ax) Supply of Porcelain Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv) 56.00 4145.00 232120.00 88928.00 88928.00 12(ax) Supply of Sectioning and 9-ton Insulators for Item no. 12(a) 232120.00 11(bx) Supply of Post Insulator for Item no. 11(b) 1 Item- 157 750600.00 750600.00 Total Item- 156
5-SCHEDULE B3: INSULATOR SUPPLY Item- 154 4(ax) Supply of Porcelain Stay and Bracket Insulators for Item No. 4(a)(i) / 4(a)(iv) 56.00 4145.00 232120.00 88928.00 88928.00 12(ax) Supply of Sectioning and 9-ton Insulators for Item no. 12(a) 232120.00 11(bx) Supply of Post Insulator for Item no. 11(b) 1 Item- 157 750600.00 750600.00 Total Item- 156 Supply / Purchase Set 2.00 14236.00 28472.00 Total 28472.00 13(bx)Supply of Post and Operating Rod Insulators for Item no. 13(b)
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond Supply and Labour/Erection Each 400.00 112.00
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond Supply and Labour/Erection Each 400.00 112.00
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond Supply and Labour/Erection Each 400.00 112.00 9744.00 44800.00 44800.00 75000.00 75000.00 18(z)(v)Supply of Paint and Painting of Fencing Panels 1 Item- 167 9744.00 18(z)(iv) White Washing for copping of mast/portal foundations 1 Item- 166 18(z)(iii) Supply of Paint and Painting of any type of Bond Total 50400.00 50400.00 18(z)(vi)Supply of Paint and Painting of PSI Equipment's
6-SCHEDULE C: GENERAL ITEMS Item- 160 3(z) Portal Boom Splicing and Extension for Each Portal Labour/Erection Each 2.00 38000.00 76000.00 Total 76000.00 16(z) Disconnection & Reconnection of any type of bond Supply and Labour/Erection Each 400.00 112.00 9744.00 44800.00 44800.00 75000.00 75000.00 18(z)(v)Supply of Paint and Painting of Fencing Panels 1 Item- 167 9744.00 18(z)(iv) White Washing for copping of mast/portal foundations 1 Item- 166 18(z)(iii) Supply of Paint and Painting of any type of Bond Total 50400.00 50400.00 18(z)(vi)Supply of Paint and Painting of PSI Equipment's
7-Non SOR Items: Part-IV: OTHER ITEMS (D) : Hiring of machinery for miscellaneous works : 211200 Hiring of machinery for minor miscellaneous works for short duration including Schedule operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. Item- 169 211201 JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity
7-Non SOR Items: Part-IV: OTHER ITEMS (D) : Hiring of machinery for miscellaneous works : 211200 Hiring of machinery for minor miscellaneous works for short duration including Schedule operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. Item- 169 211201 JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity
7-Non SOR Items: Part-IV: OTHER ITEMS (D) : Hiring of machinery for miscellaneous works : 211200 Hiring of machinery for minor miscellaneous works for short duration including Schedule operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. Item- 169 211201 JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity 26758.72 26758.72 211203 Tractor with Trolley for local transportation or other misc. works
7-Non SOR Items: Part-IV: OTHER ITEMS (D) : Hiring of machinery for miscellaneous works : 211200 Hiring of machinery for minor miscellaneous works for short duration including Schedule operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. Item- 169 211201 JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity 26758.72 26758.72 211203 Tractor with Trolley for local transportation or other misc. works