Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹10.7 L+₹74,985 (7.50%)Admitted-Finance 1 JOYRAMPUR JALA ROAD MAIL 42C SARADAMA UPANIBESH BEHALA KOLKATA 700060 | KOLKATA | WEST BENGAL | 700060 | L2 | Admitted-Finance |
Tender Value
₹10.0 L
EMD Value
₹20,000
Closing Date
29 Jan 2026, 12:00 pmClosed
D.G.(CIVIL)
5,S.N. BANERJEE ROAD , KOLKATA-700013
CLEANING POND WITH POND BANK PROTECTION AT 3 NO BIJOYGARH IN WARD NO-096, BR-X, APAS ID- APAS/01/150/238/0001
2026_KMC_990199_1
X/096/047/2025-2026/APAS(2ND CALL)
Open Tender
CIVIL WORKS
Percentage
45 days
WARD- 96
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
28 Feb 2026
17 Jan 2026
31 Jan 2026
17 Jan 2026
29 Jan 2026
17 Jan 2026
Supplying Eucalyptus-bullah piles at work site,including dressing and maiking one end pointed iii)150mm dia meter
Supplying Eucalyptus-bullah piles at work site,including dressing and maiking one end pointed i)100mm diameter
Cool tarring on wooden surfaces including cost of materials a)Double Coat
Labour for diving Sal_bullah/Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position ,protecting the pile head with iron ring and cutting and shapping heads before and after driving and including hire and labour for necessary driving appiances and all tackles. (iii)150 mm diameter
Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails,bolts and nuts.
Supplying empty Cement bags in good condition.
Filling empty Cement bags with dry earth or sand stitching the bag(cost of the thread include) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags.
MATERIALS AND LABOUR 1. Building (A) Materials delivered and stacked at site: 6)c)Fine Sand. Note: 1. The above rates are inclusive of all charges such as Royalty, Supervision Charges, etc. and also include allowance for sinkage, as applicable, and/or shrinkage and 10% Contractor?s Profit but exclusive of GST 2. Rates for Sand and Brick/ Jhama/ Bats items are complete rates at site and no other costs need to be considered. For other items, necessary loading-unloading & carriage charges are admissible.3. Laterrite Boulder &Moorum are available in the districts as mentioned in Sl. No. ? 23 & 24 respectively, remaining districts may add necessary carriage cost as applicable.
BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(ii) Two coats (white in shade)
SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white)
Estimated amount
Add: 9%SGST
Add: 9%CGST
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_2420114.xls
BOQ • 0.27 MB
tenderform.pdf
Tender Documents • 0.30 MB
civil.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .