| 1 | L1₹3.3 LAdmitted-Finance | -38.50% | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹1.2 L (35.7%)Admitted-Finance | -16.56% | ₹4.5 L+₹1.2 L (35.7%) | L2 | Admitted-Finance |
| 3 | L3₹4.8 L+₹1.5 L (45.4%)Admitted-Finance | -10.56% | ₹4.8 L+₹1.5 L (45.4%) | L3 | Admitted-Finance |
| 4 | L4₹4.9 L+₹1.6 L (49.8%)Admitted-Finance R O WARD NO 03 KATHUA DISTRICT KATHUA | -7.88% | ₹4.9 L+₹1.6 L (49.8%) | L4 | Admitted-Finance |
| 5 | L5₹5.3 L+₹2.0 L (60.1%)Admitted-Finance | -1.55% | ₹5.3 L+₹2.0 L (60.1%) | L5 | Admitted-Finance |
Tender Value
₹5.3 L
EMD Value
₹10,700
Closing Date
18 Sept 2026, 4:00 pmClosed
Xen Rew Office Kathua
Xen Rew Office Kathua
Development of Synthetic Court at Sumwan, ward no.3 Panchayat Flote B Block Nagri
2026_RDPR_324415_6
e-NIT No.218/REW/K of 2026-27 Dated 12/09/2026
Open Tender
Civil Works
Percentage
90 days
Nagri
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹10,700
22 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 8.28 | cum | 479.3 | ₹3,968.6 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead up to 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge.All kinds of soil : | 130 | sqm | 91.75 | ₹11,927.5 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1.7 | cum | 5,202.9 | ₹8,844.93 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 12 | cum | 5,733.6 | ₹68,803.2 |
| 5 | Treatment of soil using chemical like round up for anti weeding laid in holes @ 300 mm c/c and consumpution @ 600 ml/ 10 Sqm | 130 | Sqm | 50 | ₹6,500 |
| 6 | Excavating, supplying and filling of local earth (RBM)(including royalty)by mechanical transport upto a lead of 15 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 13 | cum | 276.6 | ₹3,595.8 |
| 7 | P/L and compacting stone agrregates of different sizes to form contour and elevation to the desired level as per the Drawing and instruction of Engineer Iincharge (size 40 mm /20 mm/10mm ) down black stone aggregate up to a depth of 300 mm from below primary backing . Layers of stone to be rolled as per desired slope and compaction using 8-10 tonnes Road roller over open area & pitch roller over areas with drainage pipes. | 15 | cum | - | - |
| 8 | Supply and installation of artificial UV resistanat polyethylene synthetic grass with rigid monofilment yarn, minimum 40mm pile height.
The turf should have minimum 40mm Pile Height made of POLYETHYLENE Monofilament & Pile weight minimum 900 g/m2 and above and stitched rate minimum @ 120/ mtr or above. The turf should have Dtex/Denier >=12300. The Primary backing of turf should be made of 100% POLYPROPYLENE, minimum weight 240 gram/m2 and above with Coating with Carboxylated SBR Latex appr. 1200 gr/m2 or Butadiene Styrene with weight of 900 g/sqm and total backing wt should not be less than 1140 g/sqm or as approved by FIFA under FIFA Quality Category.
The infill must be 22-25Kg Silica Sand, minimum 7kg & above SBR Rubber Granules. The line marking shall be stitched tufted material (Painted lines are not acceptable). The rate is inclusive of All applicable taxes, Lavies, Octoria, transportation loading/unloading complete Including Maintenance of 5 years by way of brushing and adding infill as and when required. | 130 | Sqm | 2,800 | ₹3,64,000 |
| 9 | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases of columns etc. for mass concrete. | 55.2 | sqm | 286.35 | ₹15,806.52 |
| 10 | carriage of stone aggregate for a distance of 07 km by mt | 41.69 | cum | 232.06 | ₹9,674.58 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.94 MB
BOQ_1094520.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .