Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.8 L+₹26,200 (17.5%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹1,800
Closing Date
5 Apr 2024, 2:00 pmClosed
SE-ES
SUPERINTENDING ENGINEER/ ELECTRICAL SYSTEM, NCTPS-I, CHENNAI-120
NCTPS I ES Circle EM I Division SDn IV Repair and Rewinding of 3 phase 415V Auxiliary cooling Water pump motor 110 KW 1No Flushing pump motor 11 KW 1 No and Stator water pump motor 9 3 KW 1 No
2024_EB_449333_1
CE NCTPS I SE ES WC No 99 2023 24
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,800
Yes
12 May 2025
15 Mar 2024
6 Apr 2024
15 Mar 2024
5 Apr 2024
15 Mar 2024
Amount
110 KW Auxiliary Cooling Water Pump Motor Labour Charges for Rewinding of motor
Labour required for Metal filling, machining and repairing of worn out shafts / Bearing seating surfaces on DE & NDE sides, checking of bearings housings, providing sleeves in the end covers on DE & NDE. (Optional)
Labour charges for Fabrication of terminal cover, copper terminal flat, hylemsheet for support insulation including assembling.
Charges for Dynamic balancing of rotor
11 KW Debris Flushing Pump Motor Labour Charges for Rewinding of motor
Charges for stator core restacking
Charges for Dynamic balancing rotor
Labour required for metal filling, machining and repairing of worn out shafts / bearing seating surfaces of one side, checking of bearing housings, providing sleeves in the end cover of one side. (Optional)
9.3 KW Stator Water Pump Motor Labour Charges for Rewinding of motor.
Labour required for metal filling, machining and repairing of worn out shafts / bearing seating surfaces of one side, checking of bearing housings, providing sleeve in the end covers of one side. (Optional)
Material Charges for Rewinding of 110 KW motor (Copper and Insulating Materials)
Charges for providing PVC fan and cooling fan cover (110 KW)
Motor Terminal Block (110 KW)
Material Charges for Rewinding of 11 KW motor (Copper and Insulating Materials)
Charges for new PVC fan and fan cover (11 KW)
Material Charges for Rewinding of 9.3 KW motor (Copper and Insulating Materials)
Charges for new PVC fan and fan cover (9.3 KW)
Consumable and T&P
Transport
KAARTHIKEYAN ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .