Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹19.6 L+₹6.0 L (44.4%)Accepted-Finance | L2 | Accepted-Finance OK | |
| 2 | L3₹19.7 L+₹6.1 L (45.1%)Accepted-Finance | L3 | Accepted-Finance OK | |
| 3 | L4₹19.9 L+₹6.4 L (46.8%)Accepted-Finance CHATAI SHEEP WARD NO 07 NEW MARKET ROAD AHIWARA DURG CHHATTISGARH 490036 | DURG | CHHATTISGARH | 490036 | L4 | Accepted-Finance OK | |
| 4 | L5₹20.8 L+₹7.2 L (53.0%)Accepted-Finance WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L5 | Accepted-Finance OK | |
| 5 | L6₹21.5 L+₹7.9 L (58.0%)Accepted-Finance D 1 A 72 UPPER GROUND FLOOR JANAK PURI JAI ROAD NEW DELHI DELHI 110058 | WEST DELHI | DELHI | 110058 | L6 | Accepted-Finance OK |
Tender Value
₹21 L
EMD Value
₹42,000
Closing Date
15 Jan 2020, 6:00 pmClosed
Garrison Enginner Gwalior
Garrison Enginner Morar Cantt Gwalior
8483/GWL/E8 OUTSOURCING THE RESOURCES FOR OPERATION, MAINT AND MANAGEMENT OF WATER SUPPLY INSTALLATION AT MORAR CANTT UNDER GE GWALIOR
2019_MES_300368_2
8483/GWL/E8
Open Tender
Miscellaneous Works
Item Rate
335 days
Garrison Enginner Gwalior
As per tender documents
9 documents required · 9 mandatory
₹500
Garrison Enginner
₹42,000
20 Jan 2020
28 Dec 2019
17 Jan 2020
28 Dec 2019
15 Jan 2020
3 Jan 2020
Amount
Out sourcing of M&O round the clock (i.e. 24 Hours in three shifts, each shift of 8 hours i.e Ist shift from 0600 Hours to 1400 hours, 2nd shift 1400 hours to 2200 hours and 3rd Shift 2200 hours to 0600 hours) by employing minimum one ITI qualified with 3 years experience or SSC passed with 5 years experience FGM per shift for water supply bore well installation and booster pump installation at NCC OTA, station road having 02 Nos (01 No as standby) of 17.5 HP, 3 phase, 415 volts submersible motor pump set at bore well and 02 Nos pumping set (01 No as standby) of 17.5 HP, 3 phase 415 volts induction motor, centrifugal pumping set at Booster pump, electrical contrtol panel, electrical fittings, connected pipes/fittings with installation including repair /rectification of fault developed in the installation and upkeep the installation operational & working conditions, maitain day to day record of maintenance activities in log sheet etc. complete all as specified and directed including the following:- (a) Operation of control valves (sluice valve/gate valve) for control of water for different area as per the time schedule given by the Engineer-in-charge. (b) Maintenance of all machines and equipments installed within the installation boundary and keeping them serviceable/clean and ready condition including periodical maintenance and all repair to motor, pump, pipe fitting, starter panels and accessories as required and directed by Engineer-in-Charge. (c) Operation and maintenance of chlorination plant and control valves as per time schedule given by Engineer-in -Charge for supply of cholrinated water to user destination with minimum 0.2 PPM at users end. (d) It will be the responsibility of the contractor to provide trade's man with T&P to change all the burnt out, unserviceable changeover switches, panel, motor starter & other accessies as directed by Engineer-in-Charge.
Out sourcing of M&O in two shifts ( i.e. 16 hours in two shifts, each shift of 8 hours i.e. Ist shift from 0600 Hours to 1400 hours and 2nd shift 1400 hours to 2200 hours ) by employing minimum one ITI qualified with 3 years experience or SSC passed with 5 years experience FGM per shift for water supply bore well installation and booster pump installation at NCC Kampoo having 02 Nos (01 No as standby) of 17.5 HP, 3 phase, 415 volts submersible motor pump set at bore well and 02 Nos pumping set (01 No as standby) of 17.5 HP, 3 phase 415 volts induction motor, centrifugal pumping set at Booster pump, electrical contrtol panel, electrical fittings, connected pipes/fittings with installation including repair /rectification of fault developed in the installation and upkeep the installation operational & working conditions, maitain day to day record of maintenance activities in log sheet etc. complete all as specified and directed including the following:- (a) Operation of control valves (sluice valve/gate valve) for control of water for different area as per the time schedule given by the Engineer-in-charge. (b) Maintenance of all machines and equipments installed within the installation boundary and keeping them serviceable/clean and ready condition including periodical maintenance and all repair to motor, pump, pipe fitting, starter panels and accessories as required and directed by Engineer-in-Charge. (c) Operation and maintenance of chlorination plant and control valves as per time schedule given by Engineer-in -Charge for supply of cholrinated water to user destination with minimum 0.2 PPM at users end. (d) It will be the responsibility of the contractor to provide trade's man with T&P to change all the burnt out, unserviceable changeover switches, panel, motor starter & other accessies as directed by Engineer-in-Charge.
Description all as per item No 2 here-in-before but at 42 Med Regt (Pump House). NOTE for item No 1 to 3 :- Quoted rates deemed to be inclusive for the following :- (a) Area cleaning including cutting of grass etc upto 3 Mtrs from the plinth protection all around plants rooms and it should be ready for insp at any time (b) Daily check as per manufacturers manual before starting the machine. (c) Any abnormality observed be immediately intimated to the JE E/M or AGE E/M. (d) Reqd tools to be always available with the operator and will be provided by contractor. (e) Log sheet to be maintained regularly in binding book, month wise all as directed by Engr-in-Charge. (f) First aid box including medicines shall always be kept in the installation and will be provided by the contractor. (g) Preparation and display of duty charts/ posters neately all as directed (h) Cost of uniform as approved by the Engr-in-Chrage/GE and operators shall always be in proper uniform (j) Max duty hours of one operator will not be increase by more than 08 hours in any case (k) Min repair of line ( Mtrl & labour for replacing of rubber gasket, packing of gland, replacing of nuts and bolts) to be carried out by the contractor without any extra cost to run the installation smoothly.
M/s Pal Construction
m/s yadav builders
M/S SANTOSH CONSTRUCTION CO
G M CONSTRUCTION COMPANY
Choice india
V S BUILDER
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .