| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹12.9 L (8.21%)Admitted-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | ₹1.7 Cr+₹12.9 L (8.21%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹30.6 L (19.5%)Admitted-Finance | ₹1.9 Cr+₹30.6 L (19.5%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | m m shawl engineers and contractors pvt ltd L2 | NEW ZEAL CONSTRUCTION Co L1 | tech builders L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and applying tack coat using hot straight run bitumen of Viscosity grade VG 30(60/70) or VG-10 (80/100) including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications. a ) 0.6Kq/sqm. | 35,509.41 | sqm | 25 ₹8,87,735.25 | 22 ₹7,81,207.02 | 20 ₹7,10,188.2 Lowest |
| 2.00 | Providing and laying of Hot Mix Dense Bituminous Macadam(DBM) using crushed stone aggregate of quality, size and grading as specified and cement as filler of quality as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [For tendering purpose VG bitumen of grade VG-30 shall be taken as 112.81 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material]. | 143 | cum | 6,800 ₹9,72,400 | 6,999 ₹10,00,857 | 5,000 ₹7,15,000 Lowest |
| 3.00 | Providing and laying of Hot Mix Semi Dense Asphaltic Concrete(SDAC) using crushed stone aggregate of quality, size and grading as specified and cement as filler of quality as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [For tendering purpose VG bitumen of grade VG-30 content shall be taken as 120 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material]. | 1,695 | cum | 8,720 ₹1,47,80,400 | 7,999 ₹1,35,58,305 Lowest | 10,000 ₹1,69,50,000 |
| 4.00 | Providing and applying 2.5 mm thick road marking strips (retroreflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 883 | sqm | 360 ₹3,17,880 Lowest | 375 ₹3,31,125 | 400 ₹3,53,200 |
Tender Value
Refer Docs
EMD Value
₹3.5 L
Closing Date
31 Aug 2020, 6:00 pmClosed
AGM Engineering Civil
AGM Engineering Civil, Srinagar International Airport Srinagar
Repair and Recarpeting of existing roads at Srinagar International Airport, Srinagar
2020_AAI_55626_1
AAI/SRN/Engg.(C)/Road/2020
Open Tender
Coal Works
Item Rate
30 days
Srinagar Airport
As per Tender Document
13 documents required · 13 mandatory
₹1,180
Airports Authority of India
₹3.5 L
8 Sept 2020
21 Aug 2020
4 Sept 2020
21 Aug 2020
31 Aug 2020
21 Aug 2020
21 Aug 2020 - 25 Aug 2020
Amount
Providing and applying tack coat using hot straight run bitumen of Viscosity grade VG 30(60/70) or VG-10 (80/100) including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler,cleaning and preparing the existing road surface as per specifications. a ) 0.6Kq/sqm.
Providing and laying of Hot Mix Dense Bituminous Macadam(DBM) using crushed stone aggregate of quality, size and grading as specified and cement as filler of quality as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [For tendering purpose VG bitumen of grade VG-30 shall be taken as 112.81 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material].
Providing and laying of Hot Mix Semi Dense Asphaltic Concrete(SDAC) using crushed stone aggregate of quality, size and grading as specified and cement as filler of quality as specified and Viscosity Grade Bitumen (supplied in bulk) in proportions as per job mix formula and laid to specified levels, grade and camber as per specification, drawings and as directed by the Engineer-in-Charge including compacting with 8-10 tonne, preferably vibratory road roller of adequate capacity to achieve the specified values of compaction, strength, surface accuracy complete [For tendering purpose VG bitumen of grade VG-30 content shall be taken as 120 kg/m3 of mix supplied in bulk produced by Govt. Refineries and 2% cement by weight of aggregates as filler material].
Providing and applying 2.5 mm thick road marking strips (retroreflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications.
m m shawl engineers and contractors pvt ltd
tech builders
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .