| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 CrRejected-Finance | ₹1.5 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 CrRejected-Finance SC 79 A SHASTRI NAGAR THANA KAVINAGAR GHAZIABAD UTTAR PRADESH 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹1.5 Cr | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical MOHALLA LUHARI SARAI NAGINA DISTRICT BIJNOR UTTAR PRADESH | NAGINA | BIJNOR | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 0 BARAGOAN JANGIGANJ BHADOHI SANT RAVIDAS NAGAR UTTAR PRADESH 221310 UDYAM UP 66 0000471 | BHADOHI | UTTAR PRADESH | 221310 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Hariom Sharma L3 | M/S SATT SAHIB CONSTRUCTION CO L2 | MAA GAYATRI ASSOCIATES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning Thick Bushes & Throny Jungle without uprooting & its disposal with all cost of labour and T&P etc. complete. | 5,260 | Sqm | 3.5 ₹18,410 | 4 ₹21,040 | 3 ₹15,780 |
| 2.00 | Uprooting Jhunds with all cost of labour and T&P etc. complete. | 925 | Nos | 30 ₹27,750 | 30 ₹27,750 | 30 ₹27,750 |
| 3.00 | Providing and Weaving of G.I.Wire crates double knot 150x150mm mesh of size 3.0x1.50x1.00 placing in position, boulder laid in wire crates made with 4mm dia GI wire (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing 20 to 40 kg including cost of boulder, material, T&P, labour, carriage, royality and all taxes etc. complete | 6,415 | Cum | 2,150 ₹1.4 Cr | 2,120 ₹1.4 Cr | 2,065 ₹1.3 Cr |
| 4.00 | Form work for C.C.Blocks including all shuttering including cost of all material, carriage, labour and T&P etc. complete. | 108 | Sqm | 450 ₹48,600 | 550 ₹59,400 | 518 ₹55,944 |
| 5.00 | Providing and Laying Cement Concrete in 1:2:4 (Cement: Coarse sand: Coarse aggregate) with Plum up to 20% for C.C.Blocks and proper compaction also including cost of boulder, material, carriage, labour and T&P etc. Complete. | 32.4 | Cum | 5,000 ₹1.6 L | 5,200 ₹1.7 L | 4,950 ₹1.6 L |
| 6.00 | Providing and laying Boulder (20 to 40 kg) Pitching on slopes including cost of boulder, T&P, labour, carriage, royality and all taxes etc. complete. | 202.5 | Cum | 1,500 ₹3.0 L | 1,700 ₹3.4 L | 1,700 ₹3.4 L |
| 7.00 | Providing and laying in position cement concrete 1:2:4 (Cement: coarse sand: coarse aggregate) with compaction including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 2 | Cum | 6,100 ₹12,200 | 6,000 ₹12,000 | 5,700 ₹11,400 |
| 8.00 | Providing and Laying Ist Class Brick Work in 1:4 (cement: sand) mortar including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 7.2 | Cum | 5,300 ₹38,160 | 5,400 ₹38,880 | 5,100 ₹36,720 |
| 9.00 | 12 mm thick Cement Plaster in 1:4 (cement: Fine sand) mortar including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete. | 187 | Sqm | 170 ₹31,790 | 150 ₹28,050 | 155 ₹28,985 |
| 10.00 | Finishing walls with Acrylic Smooth exterior paint of required shade (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 kg/10 sqm including cost of all material, carriage, labour and T&P etc. complete. | 2,246.5 | Sqm | 100 ₹2.2 L | 100 ₹2.2 L | 112 ₹2.5 L |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
8 Sept 2025, 2:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2025_UPIDC_1070146_6
04/SE/2025-26
Open Tender
Civil Works
90 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹3.1 L
Office of SE GNSM Meerut
20 Jan 2026
2 Sept 2025
8 Sept 2025
2 Sept 2025
8 Sept 2025
2 Sept 2025
3 Sept 2025
Amount
Cleaning Thick Bushes & Throny Jungle without uprooting & its disposal with all cost of labour and T&P etc. complete.
Uprooting Jhunds with all cost of labour and T&P etc. complete.
Providing and Weaving of G.I.Wire crates double knot 150x150mm mesh of size 3.0x1.50x1.00 placing in position, boulder laid in wire crates made with 4mm dia GI wire (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing 20 to 40 kg including cost of boulder, material, T&P, labour, carriage, royality and all taxes etc. complete
Form work for C.C.Blocks including all shuttering including cost of all material, carriage, labour and T&P etc. complete.
Providing and Laying Cement Concrete in 1:2:4 (Cement: Coarse sand: Coarse aggregate) with Plum up to 20% for C.C.Blocks and proper compaction also including cost of boulder, material, carriage, labour and T&P etc. Complete.
Providing and laying Boulder (20 to 40 kg) Pitching on slopes including cost of boulder, T&P, labour, carriage, royality and all taxes etc. complete.
Providing and laying in position cement concrete 1:2:4 (Cement: coarse sand: coarse aggregate) with compaction including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete.
Providing and Laying Ist Class Brick Work in 1:4 (cement: sand) mortar including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete.
12 mm thick Cement Plaster in 1:4 (cement: Fine sand) mortar including cost of all material, T&P, labour, carriage, royality and all taxes etc. complete.
Finishing walls with Acrylic Smooth exterior paint of required shade (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 kg/10 sqm including cost of all material, carriage, labour and T&P etc. complete.
M/S SATT SAHIB CONSTRUCTION CO (BID ID -5518982)
Hariom Sharma (BID ID -5520724)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid