Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | L1 | Accepted-AOC BEING LOWEST BIDDER | |
| 2 | L2₹19.4 L+₹225 (0.01%)Rejected-Finance | L2 | Rejected-Finance NOT BEING LOWEST BIDDER | |
| 3 | L3₹19.8 L+₹34,895 (1.80%)Rejected-Finance | L3 | Rejected-Finance NOT BEING LOWEST BIDDER | |
| 4 | L4₹20.5 L+₹1.1 L (5.51%)Rejected-Finance | L4 | Rejected-Finance NOT BEING LOWEST BIDDER | |
| 5 | L5₹22.0 L+₹2.5 L (13.0%)Rejected-Finance | L5 | Rejected-Finance NOT BEING LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/s VIKAS TRADERS L7 | Samaksh Enterprises L5 | JYOTI ENTERPRISES L2 | MODI CORPORATION L8 | AJIT ENTERPRISES L6 | City buildcom builders & devlopers L1 | M/S VAIBHAV ENTERPRISES L4 | SHIV SHANKAR MISHRA L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling wrought iron or mild steel work of any description not otherwise provided for | 9.5 | Qtl | 100 ₹950 | 100 ₹950 | 50 ₹475 | 250 ₹2,375 | 250 ₹2,375 | 100 ₹950 | 50 ₹475 | 10 ₹95 Lowest |
| 2.00 | S&F for Roof trusses (Framed), trussed, purlins, crane gantries, posts, rails and fastening and heavy brackets framing(Beam, tee, angle, channel or flat section) including distance pieces, cleats, etc. complete all spd and directed. | 800 | Kg | 90 ₹72,000 | 100 ₹80,000 | 80 ₹64,000 Lowest | 125 ₹1,00,000 | 95 ₹76,000 | 89 ₹71,200 | 86 ₹68,800 | 100 ₹80,000 |
| 3.00 | S&F for Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. Doors, etc. to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing complete all as specified and directed | 150 | Kg | 100 ₹15,000 | 100 ₹15,000 | 85 ₹12,750 Lowest | 115 ₹17,250 | 120 ₹18,000 | 89 ₹13,350 | 94 ₹14,100 | 100 ₹15,000 |
| 4.00 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion and making good disturbed ground embedded in concrete or masonary | 130 | RM | 50 ₹6,500 | 50 ₹6,500 | 10 ₹1,300 | 20 ₹2,600 | 9 ₹1,170 Lowest | 10 ₹1,300 | 20 ₹2,600 | 10 ₹1,300 |
| 5.00 | S&F for MS posts and struts in fencing including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-165 | 700 | Kg | 100 ₹70,000 | 90 ₹63,000 | 80 ₹56,000 | 105 ₹73,500 | 96 ₹67,200 | 89 ₹62,300 | 86 ₹60,200 | 70 ₹49,000 Lowest |
| 6.00 | Excavation in post holes (or similar holes) each n. exc 0.5 cum getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25cm, watering, and removing surplus soil to a distance n. exc 50m and making good surface in soft/loose soil. | 45 | Each | 50 ₹2,250 Lowest | 125 ₹5,625 | 100 ₹4,500 | 180 ₹8,100 | 120 ₹5,400 | 80 ₹3,600 | 60 ₹2,700 | 100 ₹4,500 |
| 7.00 | M&L PCC 1:3:6 Type C2 40 mm graded stone aggregate in foundation, filling and mass concrete as in boundary pillars and post etc all as specified and directed. | 15 | Cum | 3,500 ₹52,500 | 3,000 ₹45,000 | 3,000 ₹45,000 | 4,500 ₹67,500 | 3,150 ₹47,250 | 3,000 ₹45,000 | 4,000 ₹60,000 | 2,400 ₹36,000 Lowest |
| 8.00 | MS Flats for supports or stays for chain link fencing and similar small articles conforming to Fe-290 Gde-E-165 | 250 | Kg | 110 ₹27,500 | 100 ₹25,000 | 85 ₹21,250 | 120 ₹30,000 | 100 ₹25,000 | 89 ₹22,250 | 80 ₹20,000 Lowest | 100 ₹25,000 |
| 9.00 | Supply only Chain link fencing incl line wires, any mesh, size and type to any standarards, rails straining bolts etc incl provn of binding wire. | 1,300 | Kg | 95 ₹1,23,500 | 125 ₹1,62,500 | 85 ₹1,10,500 | 110 ₹1,43,000 | 119 ₹1,54,700 | 90 ₹1,17,000 | 72 ₹93,600 Lowest | 110 ₹1,43,000 |
| 10.00 | Fixing only chain link fencing including line wires, any mesh, size and type to any type of standards, rails, straining bolts, etc. including provission of binding wire complete all as specified and directed. | 250 | Sqm | 15 ₹3,750 | 30 ₹7,500 | 25 ₹6,250 | 25 ₹6,250 | 40 ₹10,000 | 10 ₹2,500 | 6 ₹1,500 Lowest | 50 ₹12,500 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
16 Sept 2025, 6:00 pmClosed
Shri Ankit Goyal, IDSE
GE Dronachal, Dronachal Top, Neori Hills, Bhopal 462038
REPAIR, MAINT AND REPLACEMENT TO BOUNDARY WALL, FENCING, GATE PILLAR AND DRAINAGE SYSTEM DRONACHAL BASE UNDER GE DRONACHAL
2025_MES_726547_1
8912/E8
Open Tender
Civil Works
Item Rate
180 days
BHOPAL
Class-D, Category a (i) and as per NIT documents
7 documents required · 7 mandatory
₹500
Garrison Engineer Dronachal
₹60,000
Yes
18 Nov 2025
19 Aug 2025
18 Sept 2025
19 Aug 2025
16 Sept 2025
2 Sept 2025
19 Aug 2025 - 26 Aug 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .