Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹28.3 LAccepted-Finance H 6 HOUSING BOARD UNIT MATHAVANKUTTAI P O METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹29.5 L+₹1.2 L (4.21%)Accepted-Finance M 36 HOUSING UNIT MATHAIYANKUTTAI PO METTUR DAM 636452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 2 | Accepted-Finance Satisfied | |
| 3 | 3₹30.5 L+₹2.2 L (7.62%)Accepted-Finance 76 58 A1 KAMARAJ NAGAR SALEM CAMP METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 3 | Accepted-Finance Satisfied | |
| 4 | 4₹31.7 L+₹3.4 L (12.0%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 4 | Accepted-Finance Satisfied |
| Sl No | Description | Qty | Unit | R K ENGINEERING CONTRACTOR L1 | MARSSAL ENTERPRISES L2 | THIAGARAJAN ENGINEERING CONTRACTOR L4 | Jose Enterprises L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Opening of all manhole doors, and closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors including cost of consumable and T&Ps. | 24 | Nos. | 610 ₹14,640 Lowest | 630 ₹15,120 | 680 ₹16,320 | 650 ₹15,600 |
| 2.00 | Removal of ash deposit around guide bearing area and inside the APH including cost of consumable and T&Ps. | 2 | Nos. | 5,930 ₹11,860 Lowest | 6,100 ₹12,200 | 6,800 ₹13,600 | 6,500 ₹13,000 |
| 3.00 | Charges for cutting and removing of rigid stoppers checking and correction of rotor leveling, checking and correction of critical distance between guide bearing housing and housing sleeve and fixing, welding the rigid stoppers and provide shim packing in between guide bearing housing and permanent stoppers including cost of consumable and T&Ps. | 2 | Nos. | 39,100 ₹78,200 Lowest | 40,700 ₹81,400 | 42,300 ₹84,600 | 41,000 ₹82,000 |
| 4.00 | Charges for leveling and aligning of the radial sector plates and axial seal plates with respect to the rotor axis including cost of consumable and T&Ps. | 18 | Nos. | 6,480 ₹1,16,640 Lowest | 6,600 ₹1,18,800 | 6,800 ₹1,22,400 | 6,700 ₹1,20,600 |
| 5.00 | Charges for removal of worn-out/damaged bypass seals (complete assembly CE & HE) fixing and positioning properly with new seals. (Including transporting of new materials from stores to site and scraps from site to Stores) including cost of consumable and T&Ps. | 2 | Nos. | 25,300 ₹50,600 Lowest | 26,400 ₹52,800 | 28,500 ₹57,000 | 27,000 ₹54,000 |
| 6.00 | Charges for finding the high point in 'T' bar, adjusting the bypass seals to correct clearance and clamping properly in both hot and cold ends of APH including cost of consumable and T&Ps. | 2 | Nos. | 8,100 ₹16,200 Lowest | 8,700 ₹17,400 | 9,100 ₹18,200 | 8,900 ₹17,800 |
| 7.00 | Charges for replacing of rotor post seal at hot end and cutting of sealing ring segments, cutting of tracking rod stuffing boxes, kawool packing and patch up sealing ring segments and leak arresting works around the guide bearing area and fixing of rotor post seals and rectification works on the eroded portions of spool seal assembly including cost of consumable and T&Ps. | 2 | Nos. | 17,300 ₹34,600 Lowest | 17,900 ₹35,800 | 19,400 ₹38,800 | 18,100 ₹36,200 |
| 8.00 | Overhaul of APH soot blower mechanism including changing the bearings, soot blowers spray nozzles, if necessary and changing of lubrication etc including cost of consumable and T&Ps. | 2 | Nos. | 4,990 ₹9,980 Lowest | 5,100 ₹10,200 | 5,400 ₹10,800 | 5,300 ₹10,600 |
| 9.00 | Inspection of support bearing by removing the cover, drain oil, cleaning and checking level etc.Including cost of consumable and T&Ps. | 2 | Nos. | 12,300 ₹24,600 Lowest | 12,900 ₹25,800 | 14,100 ₹28,200 | 13,500 ₹27,000 |
| 10.00 | Charges for removal of worn-out radial seal in both cold end and hot end (complete assembly) and re fixing with new HT bolts & nuts and positioning. (Including transporting of new materials from Stores to site and scraps from site to stores). ( Double sealing arrangement) Including cost of consumable and T&Ps. | 2 | Nos. | 99,000 ₹1,98,000 Lowest | 1,02,000 ₹2,04,000 | 1,05,000 ₹2,10,000 | 1,03,500 ₹2,07,000 |
Tender Value
Refer Docs
EMD Value
₹28,800
Closing Date
9 Sept 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM AOH 2026 27 Unit III Complete overhaul of APH A and B Sides and other related works
2026_EB_700997_1
CE / MTPS-I / SE / M-I / BM /OT.57 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹28,800
Yes
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Opening of all manhole doors, and closing manhole doors after completion of work including changing of asbestos ropes and clamps in the doors including cost of consumable and T&Ps. | 24 | Nos. | - | - |
| 2 | Removal of ash deposit around guide bearing area and inside the APH including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 3 | Charges for cutting and removing of rigid stoppers checking and correction of rotor leveling, checking and correction of critical distance between guide bearing housing and housing sleeve and fixing, welding the rigid stoppers and provide shim packing in between guide bearing housing and permanent stoppers including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 4 | Charges for leveling and aligning of the radial sector plates and axial seal plates with respect to the rotor axis including cost of consumable and T&Ps. | 18 | Nos. | - | - |
| 5 | Charges for removal of worn-out/damaged bypass seals (complete assembly CE & HE) fixing and positioning properly with new seals. (Including transporting of new materials from stores to site and scraps from site to Stores) including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 6 | Charges for finding the high point in 'T' bar, adjusting the bypass seals to correct clearance and clamping properly in both hot and cold ends of APH including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 7 | Charges for replacing of rotor post seal at hot end and cutting of sealing ring segments, cutting of tracking rod stuffing boxes, kawool packing and patch up sealing ring segments and leak arresting works around the guide bearing area and fixing of rotor post seals and rectification works on the eroded portions of spool seal assembly including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 8 | Overhaul of APH soot blower mechanism including changing the bearings, soot blowers spray nozzles, if necessary and changing of lubrication etc including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 9 | Inspection of support bearing by removing the cover, drain oil, cleaning and checking level etc.Including cost of consumable and T&Ps. | 2 | Nos. | - | - |
| 10 | Charges for removal of worn-out radial seal in both cold end and hot end (complete assembly) and re fixing with new HT bolts & nuts and positioning. (Including transporting of new materials from Stores to site and scraps from site to stores). ( Double sealing arrangement) Including cost of consumable and T&Ps. | 2 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_842572.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .