Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance LOCATION TAMIL NADU TN | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹3.2 L+₹19,300 (6.42%)Accepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | L2 | Accepted-Finance BQR Conditions Satisfied |
Tender Value
₹2.9 L
EMD Value
₹2,900
Closing Date
6 Jun 2020, 2:00 pmClosed
Superintending Engineer Operation,TTPS
Office of the Superintending Engineer Operation, TTPS, Tuticorin-628 004.
TTPS Operation Circle CAD CWPH I Unit III Annual overhauling of TW Screen 3A 3B complete silt removal from pump suction end to TW Screen channel entry fore bay gate for the year 2020 2021
2020_EB_164562_1
SE/O/TTPS/Spec.No.91/20-21
Open Tender
Miscellaneous Works
Item Rate
15 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹2,900
10 Jun 2020
22 May 2020
8 Jun 2020
22 May 2020
6 Jun 2020
22 May 2020
Charges for divers, towards diving in to the 7.5 to 8 mtr deep sea water intake channel of traveling water screen for tracing, picking, removing foreign material in the bottom seating grooves of stopper gate including hire charges for breathing apparatus under light etc in TWS 3A & 3B.
Charges for shifting traveling water screen’s stopper gate (3 Nos. of 1 set) from stock yard to traveling water screen by assembling the gate one over the other and lowering them inside the channel arresting the sea water leakage, make the gate link proof, lifting and dismantling the gates one after the other after completion of the dewatering & silt removal shifting to yard and stocking the gates for traveling water screen 3A & 3B (Electrical crane will be supplied by board).
Charges for installing 50/30 HP dewatering pump (Electrically) spared by TANGEDCO at free of rent near channel, installing 5/10 HP diesel pump 1 no. spared by the contractor and dewatering the channel, removal of silts from pump suction to channel entry gate, transporting and unloading the removal silt to the dumping yard near rejected coal stone yard adjacent to west side of the compound. Scrapping the fore bay wall and removal of marine growth for TWS 3A & 3B.
Charges for removal of front & rear cover of TWS, dismantling the head, intermediate and foot structure from channel overhauling head and foot structure assemblies such as main drive assembly take up screw assembly. Bearing block bushes, Plummer block bushes, cleaning the screen basket chain link and injector pipe nozzle and allied other parts, reassembling the screens lowering the structure in to channel, fixing chain links baskets. Grease packing the rollers, aligning the screens and commissioning of TWS 3A & 3B.
Charges for painting one coat of enamel paint on the TWS head, intermediate, foot structure and covers (front & back area) including the cost of consumables and paint for 3A & 3B.
Charges for painting all basket with one coat enamel paint including the cost of consumables and paint for TWS 3A & 3B.
VEL ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open
tech_eval
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .