Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹39.3 L+₹9,339.94 (0.24%)Rejected-AOC | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | V.DEVI L2 | Kavitha Mahendran L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Neithavasal to Puthukuppam Km. Road 0/0 - 0/980 - R - 1219 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 588 | Sqm | 7 ₹4,116 | 6 ₹3,528 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 980 | sqm | 24 ₹23,520 | 23 ₹22,540 Lowest |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 264 | cum | 141 ₹37,224 | 140 ₹36,960 Lowest |
| 5.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 110.25 | cum | 1,122 ₹1,23,700.5 | 1,121.5 ₹1,23,645.38 Lowest |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | 459.38 | Cum | 3,458 ₹15,88,536.04 | 3,457 ₹15,88,076.66 Lowest |
| 7.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,675 | sqm | 87 ₹3,19,725 | 86.5 ₹3,17,887.5 Lowest |
| 8.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 3,675 | Sqm | 21 ₹77,175 | 20 ₹73,500 Lowest |
| 9.00 | Bituminous Macadam to 25 mm thick (Grade - I) Using VG30 & Plastic Waste
Providing and laying Bituminous Macadam to 50mm thick using 0.20 cum of 26.5-13.20mm,0.43 cum of 13.20-2.36mm and 0.26cum of 2.96 & below IRC HBG metal with 58.66 kgs of VG30 bitumen with 3.74kg of Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH. | 91.88 | cum | 12,453 ₹11,44,181.64 | 12,452.5 ₹11,44,135.7 Lowest |
| 10.00 | Provision for HM Stone | 4 | no | 781 ₹3,124 | 779 ₹3,116 Lowest |
Tender Value
₹39.5 L
EMD Value
₹39,530
Closing Date
10 Mar 2026, 4:00 pmClosed
Block Development Office Sirkali
Block Development Office Sirkali
Strengthening of Neithavasal to Puthukuppam Road in Kaveripoompattinam Panchayat Sirkali Block
2026_RDTN_672332_1
1182/2025/A2 06.03.2025
Open Tender
Civil Works
Item Rate
120 days
Block Development Office Sirkali
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹39,530
Yes
Block Development Office Sirkali
11 Mar 2026
9 Mar 2026
10 Mar 2026
9 Mar 2026
10 Mar 2026
10 Mar 2026
9 Mar 2026
Strengthening of Neithavasal to Puthukuppam Km. Road 0/0 - 0/980 - R - 1219
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Bituminous Macadam to 25 mm thick (Grade - I) Using VG30 & Plastic Waste Providing and laying Bituminous Macadam to 50mm thick using 0.20 cum of 26.5-13.20mm,0.43 cum of 13.20-2.36mm and 0.26cum of 2.96 & below IRC HBG metal with 58.66 kgs of VG30 bitumen with 3.74kg of Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.
Provision for HM Stone
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
SklPriceBid.pdf
Tender Documents • 0.17 MB
SklTechnicalBid.pdf
Tender Documents • 0.46 MB
BOQ_808018.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .