Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAccepted-AOC 37A 326F VIDHYA NAGAR NADLA PADI AGRA B 302 MANGLAM ESTATE DAYALBAGH AGRA | AGRA | AGRA | UTTAR PRADESH | ₹24.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹24.8 L+₹247.71 (0.01%)Rejected-Finance ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 735204 | ₹24.8 L+₹247.71 (0.01%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
16 Jul 2026, 12:00 pmClosed
EEREDAGRA
EEREDAGRA
1. ViIKASH KHAND achhaneraa men panavaaree maarg par graam panavaaree men mandir ke paas saamudaayik bhavan kaa nirmaaN kaary
2026_REDUP_1167764_1
430/NIVIDA AGRA/2026-27 dt 09.6.2026
Open Tender
Civil Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹50,000
Yes
7 Aug 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/work excavation in foundation in ordinary work lead up 30 mtr. and lift 1.50 mtr. including all charges etc. | 45.7 | Cum | 142.5 | ₹6,512.25 |
| 2 | Cement concrete in 1:4:8 cement sand and brick ballast in foundation with all material labour T & P etc. 4.1.8 | 75.75 | Cum | 5,343.75 | ₹4,04,789.06 |
| 3 | M-150 B\w in 1:6 cement sand mortar in foundation up to plaint with all labour material etc.SI No 6.1.2 | 26.5 | Cum | 5,177.5 | ₹1,37,203.75 |
| 4 | RCC in 1:1½ :3 cement, C/sand & Stone grit in plinth band including supply of T&P complete including all charges./5.1.2 | 12.65 | Cum | 7,790 | ₹98,543.5 |
| 5 | M-150 class B/work in 1:6 cement sand morter in super structure with all material, Labour T&P etc. SI No 6.8A | 31.46 | Cum | 5,614.5 | ₹1,76,632.17 |
| 6 | R.C.C. work in lintel at G.F. in 1:1½ :3 cement, C/sand & Stone grite including all charges 5.1.2 | 3.18 | Cum | 8,265 | ₹26,282.7 |
| 7 | R.C.C. work in slab at G.F. in 1:1½ :3 cement, C/sand & Stone grite including supply of T&P including all charges. 5.1.2 | 11.19 | Cum | 8,265 | ₹92,485.35 |
| 8 | MS steal rein forcement of TMT bar includeing cutting bending binding & placeing of steel bars including all charges. | 26.51 | Qtl | 7,811.85 | ₹2,07,092.14 |
| 9 | S/o Z-section M.S.Steel window fram including all charges | 518.4 | Kg | 114 | ₹59,097.6 |
| 10 | Supply & Fixing of angle iron door, frame with shutter including all charges | 302.4 | Kg | 85.5 | ₹25,855.2 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
sbd.pdf
Tender Documents • 1.40 MB
BOQ_2190060.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .