| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC B 12 SANGWAN CITY ASHADPUR KYAM ALIGARH UTTAR PRADESH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.3 Cr+₹19.5 L (9.27%)Rejected-AOC | ₹2.3 Cr+₹19.5 L (9.27%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.6 Cr+₹46.0 L (21.9%)Rejected-AOC | ₹2.6 Cr+₹46.0 L (21.9%) | L3 | Rejected-AOC L3 |
| 4 | L4₹2.6 Cr+₹52.1 L (24.7%)Rejected-AOC | ₹2.6 Cr+₹52.1 L (24.7%) | L4 | Rejected-AOC L4 |
| 5 | L5₹2.9 Cr+₹83.5 L (39.6%)Rejected-AOC 0 BARAGOAN JANGIGANJ BHADOHI SANT RAVIDAS NAGAR UTTAR PRADESH 221310 | BHADOHI | UTTAR PRADESH | 221310 | ₹2.9 Cr+₹83.5 L (39.6%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Durga Engineers and Earth Movers L7 | SHRI SAI CONSTRUCTION L5 | M/S VAISHNAVI CONSTRUCTION COMPANY L3 | J P INFRATECH L2 | GANPATI CONSTRUCTIONS L6 | GSB DEVELOPERS PRIVATE LIMITED L8 | HARBIR SINGH L4 | M/S SATT SAHIB CONSTRUCTION CO L9 | M/S MANOJ TRADERS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in foundation in dry ordinary soil (loam clay or sand) i/c lift up to 1.50m and lead up ot 30m i/c back filling, watering and ramming of excavated earth i/c all cost of material, labour,t&P etc complete. | 5,105 | CUM | 66.13 ₹3,37,593.65 | 65.3 ₹3,33,356.5 | 62 ₹3,16,510 | 50 ₹2,55,250 Lowest | 65.48 ₹3,34,275.4 | 67.54 ₹3,44,791.7 | 58.32 ₹2,97,723.6 | 68.58 ₹3,50,100.9 | 50 ₹2,55,250 Lowest |
| 2.00 | Earth work in embankment by power tranported earth with upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete . | 1,020 | CUM | 198.49 ₹2,02,459.8 | 196 ₹1,99,920 | 171 ₹1,74,420 | 140 ₹1,42,800 Lowest | 196.54 ₹2,00,470.8 | 202.7 ₹2,06,754 | 175.04 ₹1,78,541.82 | 205.84 ₹2,09,956.8 | 200 ₹2,04,000 |
| 3.00 | Dismantling of Damaged C.C. in D/s of Torrent xing i/c Disposal of Material. i/c all cost of material, labour, T&P etc for proper completion of work. | 175 | CUM | 475.78 ₹83,261.5 | 469.83 ₹82,220.25 | 410 ₹71,750 | 350 ₹61,250 Lowest | 471.12 ₹82,446 | 485.88 ₹85,029 | 419.58 ₹73,426.5 | 493 ₹86,275 | 500 ₹87,500 |
| 4.00 | Making C.C. Block in M-10 (1:3:6) with 20% plum of 1.50 x 1.50 x 0.90 m size i/c cost of all material, labour, T&P etc. | 3,990 | CUM | 4,221.7 ₹1,68,44,583 | 4,168.84 ₹1,66,33,671.6 | 3,550 ₹1,41,64,500 | 3,450 ₹1,37,65,500 | 4,180.33 ₹1,66,79,516.7 | 4,311.33 ₹1,72,02,206.7 | 3,723 ₹1,48,54,781.97 | 4,377 ₹1,74,64,230 | 2,650 ₹1,05,73,500 Lowest |
| 5.00 | Laying C.C. In M-15 (1:2:4) cement concrete in floor u/s & D/s of Torrent xing i/c all cost of material, Labour, T&P etc for proper completion of work. | 135 | CUM | 5,177.86 ₹6,99,011.1 | 5,113 ₹6,90,255 | 4,453 ₹6,01,155 | 4,000 ₹5,40,000 Lowest | 5,127.12 ₹6,92,161.2 | 5,287.79 ₹7,13,851.65 | 4,566.21 ₹6,16,438.76 | 5,369 ₹7,24,815 | 4,000 ₹5,40,000 Lowest |
| 6.00 | Centring & shuttering for C.C. work i/c cost of labour material T&P etc complete for proper completion of work. | 5,605 | SQM | 528.14 ₹29,60,224.7 | 521 ₹29,20,205 | 453 ₹25,39,065 | 250 ₹14,01,250 Lowest | 522.96 ₹29,31,190.8 | 539.35 ₹30,23,056.75 | 465.75 ₹26,10,528.75 | 548 ₹30,71,540 | 300 ₹16,81,500 |
| 7.00 | Filling Gaps/ Jhirrie with shingle (40-80 mm size) between C.C. blocks i/c cost of material, Labour etc comp. (Per Cum) | 350 | CUM | 1,960.54 ₹6,86,189 | 1,935 ₹6,77,250 | 1,688 ₹5,90,800 | 1,500 ₹5,25,000 Lowest | 1,941.33 ₹6,79,465.5 | 2,002.16 ₹7,00,756 | 1,728.95 ₹6,05,130.75 | 2,033 ₹7,11,550 | 2,000 ₹7,00,000 |
| 8.00 | Laying Random Rubble Stone masonery in M-10 (1:3:6) cement mortar i/c cost of all material, labour, T&P et, complete. | 63 | CUM | 4,136.74 ₹2,60,614.62 | 4,084 ₹2,57,292 | 3,558 ₹2,24,154 | 3,500 ₹2,20,500 | 4,096.21 ₹2,58,061.23 | 4,224.56 ₹2,66,147.28 | 3,648.08 ₹2,29,828.91 | 4,289 ₹2,70,207 | 3,000 ₹1,89,000 Lowest |
| 9.00 | Laying 450 mm thick Dry Boulder pitching 20 to 40k.g. i/c all cost of labour, t&P etc for proper completion of work (Labour Only) | 1,135 | CUM | 316.88 ₹3,59,658.8 | 312 ₹3,54,120 | 273 ₹3,09,855 | 200 ₹2,27,000 Lowest | 313.78 ₹3,56,140.3 | 323.61 ₹3,67,297.35 | 279.45 ₹3,17,175.75 | 328 ₹3,72,280 | 330 ₹3,74,550 |
| 10.00 | Supply of Boulder 20 to 40 k.g. from Quarry to Stacking at site i/c all cost of material, labour, T &P etc complete for proper completion of work. | 2,400 | CUM | 1,577.2 ₹37,85,280 | 1,557 ₹37,36,800 | 1,500 ₹36,00,000 | 1,280 ₹30,72,000 Lowest | 1,561.75 ₹37,48,200 | 1,610.69 ₹38,65,656 | 1,390.89 ₹33,38,140.8 | 1,635 ₹39,24,000 | 1,400 ₹33,60,000 |
Tender Value
₹3.2 Cr
EMD Value
₹6.5 L
Closing Date
22 Sept 2025, 5:00 pmClosed
SE IWC SAHARANPUR
OFFICE OF THE SE IWC SAHARANPUR
Repair work of Damaged works of Raipur Level Crossing constructed at k.m. 13.761 of Eastern Yamuna Canal in District Saharanpur
2025_UPIDC_1074200_2
02/SE/SRE/2025-26
Open Tender
Civil Works
Item Rate
180 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.5 L
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
17 Oct 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
22 Sept 2025
16 Sept 2025
20 Sept 2025
Amount
Earth work excavation in foundation in dry ordinary soil (loam clay or sand) i/c lift up to 1.50m and lead up ot 30m i/c back filling, watering and ramming of excavated earth i/c all cost of material, labour,t&P etc complete.
Earth work in embankment by power tranported earth with upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete .
Dismantling of Damaged C.C. in D/s of Torrent xing i/c Disposal of Material. i/c all cost of material, labour, T&P etc for proper completion of work.
Making C.C. Block in M-10 (1:3:6) with 20% plum of 1.50 x 1.50 x 0.90 m size i/c cost of all material, labour, T&P etc.
Laying C.C. In M-15 (1:2:4) cement concrete in floor u/s & D/s of Torrent xing i/c all cost of material, Labour, T&P etc for proper completion of work.
Centring & shuttering for C.C. work i/c cost of labour material T&P etc complete for proper completion of work.
Filling Gaps/ Jhirrie with shingle (40-80 mm size) between C.C. blocks i/c cost of material, Labour etc comp. (Per Cum)
Laying Random Rubble Stone masonery in M-10 (1:3:6) cement mortar i/c cost of all material, labour, T&P et, complete.
Laying 450 mm thick Dry Boulder pitching 20 to 40k.g. i/c all cost of labour, t&P etc for proper completion of work (Labour Only)
Supply of Boulder 20 to 40 k.g. from Quarry to Stacking at site i/c all cost of material, labour, T &P etc complete for proper completion of work.
Laying C.C. Grouting in M-10 (1:3:6) ratio over Dry Bolder pitching i/c all cost of material, labour, T &P etc complete for proper completion of work.
Providing and laying Painting of Torrent crossing Gate by applying 1 coat of red oxide zinc chromate primer and 02 coat of high build black bituminous paint of standard make after proper cleaning, scrapping the surface i/c cost of material, all material, labour T&P and scoffolding bridges with proper safety arrangement as per required for proper completion of work.
Painting of superstructure of gate by applying I coat of red oxide zinc chromate primer and 2 coat of high glass synthetic enamel phiroza blue paint of standard make after proper cleaning, scarping the surface including cost of all material, labour T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work.
S/Laying Dry Brick on edge with M-150 Brick i/c preparation of sub grade and filling joints with local sand i/c all cost of material, labour, t&P etc complete.
Providing & Laying Finishing wall with water Proof Weather coat Paint of Approved make and Quality on New work with two coat to give an even shade i/c supply of al material, labour, t&P etc complete.
Supply of 8 SWG G.I. wire crates size 3.0x1.50x1.0 m with 15x15 cm Sqm mesh with double kontted i/c cost of G.I. wire at site etc. (per No.)
Laying Packing of Boulder in G.I. Wire crate of size 3.0x1.50x1.0m i/c tying of crate (Labour only) etc complete.
Providing & Fixing of 5 mm thick M.S. Sheet on deck platform of Torrent croosing i/c All Cost Of Material Labour T&P etc Complete.
Replacing of musical note type side rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate, scraping & cleaning surface, making holes feding and clamping the M.S plate by new counters sunk head high tensile bolts, nuts and washer, making adjustment as per requirement of site including cost of all material labour and T&p required for proper completion of work. For size 120 X 12mm note dia 45mm
Replacing of bottom rubber seal as per IS code 11855 by removing old damaged side rubber sea from gate, scraping & cleaning surface, making holes, fixing and clamping the M.S plate by new counters sunk head high tensile bolts, nuts and washer, making adjustment as per requirement of site including cost of all material, labour and T&p required for proper completion of work . For size 80X20 mm
Reparing of guide roller (side sway roller) by taking our defective guide roller from gate. Rethreading of foundation hole after extrancting broken foundation bolts. Repairing of pin by remetaling by welding, machining of roller shaft assembling the guide roller and fitting on gates with new foundation bolt and new rubber bushes and necessary oiling and greasing including cost of all material, labour, T&P test and trial etc required 1 for proper complletion of work
Greasing oiling of component of lifting mechanism of gates (excluding rollers) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour and T&P etc. required proper completion of work. For gate span up to 8.00 mtr
Applying cardium compound on steel wire rope, teeth of drum gear and pinion of gate after proper cleaning including cost of all materail, labour, T&P and scaffolding with safety arrangement required for proper completion of work For gate span up to 8.00 mtr
Replacing filling gear oil in Radicon Reduction Gear Box (radicon or flaxon unit) after proper cleaning including cost of all materials, labour T&P etc requirred for proper completion of work. For gate span up to 8.00 mtr
J P INFRATECH (BID ID -5550315)
M/S VAISHNAVI CONSTRUCTION COMPANY (BID ID -5548628)
HARBIR SINGH (BID ID -5552387)
SHRI SAI CONSTRUCTION (BID ID -5539529)
GANPATI CONSTRUCTIONS (BID ID -5548126)
Durga Engineers and Earth Movers (BID ID -5546497)
GSB DEVELOPERS PRIVATE LIMITED (BID ID -5549155)
M/S SATT SAHIB CONSTRUCTION CO (BID ID -5542044)
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .