Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 CrAccepted-Finance 109 S O RAMESH CHANDRA RAI MOTI SADAN KALPANA NAGAR BHOPAL MADHYA PRADESH 462021 UDYAM MP 10 0003670 23AAFCC1560R1ZH R M S | BHOPAL | MADHYA PRADESH | 462021 | ₹14.3 Cr | L1 | Accepted-Finance LOWEST RATES QUOTED BY THE CONTRACTOR |
| 2 | L2₹15.4 Cr+₹1.0 Cr (7.22%)Rejected-Finance | ₹15.4 Cr+₹1.0 Cr (7.22%) | L2 | Rejected-Finance HIGER RATES QUOTED THEN L1 |
| 3 | L3₹15.4 Cr+₹1.1 Cr (7.78%)Rejected-Finance 4 DUGGAL COMPLEX GOVIND GARDEN BHOPAL M P | BHOPAL | BHOPAL | MADHYA PRADESH | ₹15.4 Cr+₹1.1 Cr (7.78%) | L3 | Rejected-Finance HIGER RATES QUOTED THEN L1 |
| 4 | L4₹15.8 Cr+₹1.5 Cr (10.2%)Rejected-Finance | ₹15.8 Cr+₹1.5 Cr (10.2%) | L4 | Rejected-Finance HIGER RATES QUOTED THEN L1 |
| 5 | L5₹15.9 Cr+₹1.6 Cr (10.8%)Rejected-Finance E 8 46 SHIVA KUNJ RAILWAY SOCIETY ARERA COLONY 12 NO STOP BHOPAL M P | BHOPAL | MADHYA PRADESH | 462016 | ₹15.9 Cr+₹1.6 Cr (10.8%) | L5 | Rejected-Finance HIGER RATES QUOTED THEN L1 |
Tender Value
₹18.6 Cr
EMD Value
₹10 L
Closing Date
17 Feb 2026, 5:30 pmClosed
C.E. P.W.D. Bhopal Zone Bhopal
Office of The Chief Engineer PWD Bhopal Zone Nirman Bhawan Bhopal
Construction of Atal Bihari Vajpayee Hindi University i/c Academic Building, Staff Residence Hostel Blocks, Sports Complex and other Development works for phase-1, at Mungaliakot, Bhopal (M.P.)- Balance Work PAC RS. 1862.87 LACS First call
2026_PWDRB_479552_1
01/ G. /1/Mis/C.Z./2019 (Year 2026)
Open Tender
Civil Works - Buildings
Percentage
365 days
Bhopal
As per Tender Document
3 documents required · 3 mandatory
₹30,000
₹10 L
Bhopal
8 Apr 2026
2 Feb 2026
19 Feb 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
10 Feb 2026
Works
Construction of Atal Bihari Vajpayee Hindi University i/c Academic Building, Staff Residence Hostel Blocks, Sports Complex and other Development works for phase-1, at Mungaliakot, Bhopal (M.P.)- Balance Work PAC RS. 1862.87 LACS First call on on Building S.O.R. wef 01.01.24 AND Electrical S.O.R. wef 01.01.24 Work Period 365 days i/c rainy season
stage.html
html • 0.05 MB
technical_563839.pdf
techsummary_563839.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
TDatal.pdf
Tender Documents • 11.95 MB
ATALScheduleCIVIL.pdf
Other Document • 0.94 MB
ATALScheduleELEC.pdf
Additional Documents • 0.62 MB
BOQ_563839.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .