Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.2 CrAccepted-Finance ALTUS 601 BALEWADI PUNE 45 | PUNE | PUNE | MAHARASHTRA | 411045 | L1 | Accepted-Finance L1 | |
| 2 | L2₹68.3 Cr+₹9.8 L (0.14%)Rejected-Finance 1313 SADASHIV ETH OPP BHARAT NATY MANDIR PUNE 411030 | PUNE | PUNE | MAHARASHTRA | 411030 | L2 | Rejected-Finance L2 | |
| 3 | L3₹68.6 Cr+₹45.5 L (0.67%)Rejected-Finance 308 HIREN LIGHTS INDUSTRIAL PREMISES CO OP SOC MOGUL LANE MAHIM WEST ANDHERI WEST MUMBAI MUMBAI MAHARASHTRA INDIA 400016 | MUMBAI | MAHARASHTRA | 400016 | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical BEHIND CC TOWER P NO 65 SENAPATI BAPAT ROAD PUNE 411016 | PUNE | PUNE | MAHARASHTRA | 411016 | - | Rejected-Technical Rejected due to Work Done and MAF Not Fulfield | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected due to Bid Capicity Work Done and Machinery Not Fulfield |
Tender Value
₹65.1 Cr
EMD Value
₹32.5 L
Closing Date
25 Jul 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Add.Chief Executive Officer Z.P.Pune WellaslayRd.C
Add.Chief Executive Officer Z.P.Pune WellaslayRd.Camp Pune-1
1.RENOVATION AND UPGRADATION OF PRIMARY HEALTH CENTRES PHCs into Model PHCs at Various Locations in Pune District
2025_RDPUN_1199454_1
ZPPune/North/e-Tender/30/25-26
Open Tender
Civil Works - Buildings
Percentage
300 days
PUNE
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹32.5 L
Zilla Parishad PUNE
8 Oct 2025
11 Jul 2025
26 Jul 2025
11 Jul 2025
25 Jul 2025
11 Jul 2025
18 Jul 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A(Civil WOrk) Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 2,887.08 | One Square Metre | 7 | ₹20,209.56 |
| 2 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. | 1,639.29 | One Cubic Metre | 335 | ₹5,49,162.15 |
| 3 | Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 212.07 | One Cubic Metre | 930 | ₹1,97,225.1 |
| 4 | Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. | 1,760.73 | One Cubic Metre | 633 | ₹11,14,542.09 |
| 5 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. | 1,308 | One Number | 156 | ₹2,04,048 |
| 6 | Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. | 1,301.28 | One Cubic Metre | 558 | ₹7,26,114.24 |
| 7 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete | 16,418.82 | One Square Metre | 45 | ₹7,38,846.9 |
| 8 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | 51,902.73 | One Square Metre | 52 | ₹26,98,941.96 |
| 9 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) by Mechanical Means. | 1,533.52 | One Cubic Metre | 207 | ₹3,17,438.64 |
| 10 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means | 555.13 | One Cubic Metre | 227 | ₹1,26,014.96 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
Tender Document • 0.04 MB
Tendernotice_1.pdf
Tender Document • 24.71 MB
BOQ_2077186.xls
BOQ • 0.60 MB
BOQ.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .