Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹2.8 L (1.40%)Admitted-Finance | ₹2.0 Cr+₹2.8 L (1.40%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹36.7 L (18.5%)Admitted-Finance | ₹2.3 Cr+₹36.7 L (18.5%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NIRMAL ENTERPRISES L2 | SHIVAM ENTERPRISES L1 | Jagad Electrical & Fabricators L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULED Q-1 (SUPPLY) | ||||||
| 2.00TOWER ACCESSORIES | ||||||
| 2.10 | NUMBER PLATE | 113 | Nos | 345 ₹38,985 Lowest | 350 ₹39,550 | 400 ₹45,200 |
| 2.20 | DANGER PLATE | 113 | Nos | 400 ₹45,200 | 350 ₹39,550 Lowest | 500 ₹56,500 |
| 2.30 | PHASE PLATE SET | 113 | Set | 340 ₹38,420 Lowest | 350 ₹39,550 | 550 ₹62,150 |
| 3.00INSULATOR | ||||||
| 3.10 | 160KN PORCELAIN INSULATORS FOR TENSION TOWERS | 4,100 | Nos | 1,120 ₹45,92,000 | 1,100 ₹45,10,000 Lowest | 1,250 ₹51,25,000 |
| 3.20 | 70KN PORCELAIN INSULATORS FOR SUSPENSION TOWERS | 4,116 | Nos | 645 ₹26,54,820 Lowest | 650 ₹26,75,400 | 900 ₹37,04,400 |
| 4.00OPGW | ||||||
| 4.10 | 48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE | 35 | Route Km | 1,33,500 ₹46,72,500 | 1,33,000 ₹46,55,000 Lowest | 1,40,000 ₹49,00,000 |
Tender Value
₹17.7 Cr
EMD Value
₹1.8 L
Closing Date
7 Sept 2022, 5:00 pmClosed
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
work tender
2022_UPTCL_724032_1
ETC MU T 64 2022 23
Open Tender
Electrical Works
Item Rate
90 days
muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EE ETD MUZAFFARNAGAR
₹1.8 L
Yes
20 Sept 2022
27 Aug 2022
8 Sept 2022
27 Aug 2022
7 Sept 2022
27 Aug 2022
Amount
SCHEDULED Q-1 (SUPPLY)
TOWER ACCESSORIES
NUMBER PLATE
DANGER PLATE
PHASE PLATE SET
INSULATOR
160KN PORCELAIN INSULATORS FOR TENSION TOWERS
70KN PORCELAIN INSULATORS FOR SUSPENSION TOWERS
48 FIBRE (DWSM) OPGW FIBRE OPTIC CABLE
SUPPLY & INSTALLATION OF HARDWARE SET FOR 48 FIBRE OPGW
JOINT BOX (48 FIBRE)
FODP 96F
FIBRE OPTIC APPROACH CABLE FOR 48 F OPGW
SUPPLY & INSTALLATION OF HARDWARE SET FOR 48 FIBRE (DWSM, G.652D) FIBRE OPTIC APPROACH CABLE
SCHEDULED Q-2 (WORK)
Erection of Superstructure of Towers and Anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulator, hardware & accessories but including fitting of danger, number & phase plates, bird guard and fixing & punching for 220 KV SC/DC Lines.
Tack welding of bolt up to height of one section or 5 Mtr. form ground level whichever is higher (1 Bolt = 1 No.).
Laying, stringing, tensioning, clamping, jointing etc. of ACSR 'Zebra' conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. Fittings Armour rods, vibration dampers etc. on all Six phases of 220 KV DC line.
Laying, stringing, tensioning, clamping, jointing including fittings of all necessary hardware and accessories of OPGW & OFAC, termination at S/s, end to end connectivity & testing etc. on 132 KV line.
Grounding work including earth work etc. for pipe type grounding including cost of coke & salt.
NIRMAL ENTERPRISES
Jagad Electrical & Fabricators
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_1168070.xls
BOQ • 0.24 MB
TenderDoc64.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .