Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 CrAccepted-AOC | ₹4.8 Cr | L1 | Accepted-AOC L1 Letter No. 1934(S)WE Date-08.05.2026 |
| 2 | L2₹5.1 Cr+₹30.3 L (6.27%)Rejected-Finance KUNWAR SADAN VEER KUNWAR SINGH COLONY AIRPORT ROAD HINOO RANCHI 834002 JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834002 | ₹5.1 Cr+₹30.3 L (6.27%) | L2 | Rejected-Finance L2 Letter No. 1934(S)WE Date-08.05.2026 |
| 3 | L3₹5.4 Cr+₹57.7 L (11.9%)Rejected-Finance | ₹5.4 Cr+₹57.7 L (11.9%) | L3 | Rejected-Finance L3 Letter No. 1934(S)WE Date-08.05.2026 |
| 4 | L4₹5.5 Cr+₹62.8 L (13.0%)Rejected-Finance | ₹5.5 Cr+₹62.8 L (13.0%) | L4 | Rejected-Finance L4 Letter No. 1934(S)WE Date-08.05.2026 |
| 5 | L5₹5.8 Cr+₹98.7 L (20.4%)Rejected-Finance | ₹5.8 Cr+₹98.7 L (20.4%) | L5 | Rejected-Finance L5 Letter No. 1934(S)WE Date-08.05.2026 |
| Sl No | Description | Qty | Unit | KUMAR AND ROY CONSTRUCTION L3 | Ms Gupteshwar Construction L5 | SANJU CONSTRUCTION PRIVATE LIMITED L4 | ARUN KUMAR L2 | M/S CHHINMASTIKA CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Manual means using dozer , In area of light jungle | 0.43 | Hect. | 80,000 ₹34,400 | 88,500 ₹38,055 | 36,261 ₹15,592.23 | 1,35,385.92 ₹58,215.95 | 25,000 ₹10,750 Lowest |
| 2.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means Depth upto 3 m | 2,144.63 | Cum. | 50 ₹1,07,231.5 Lowest | 60 ₹1,28,677.8 | 282.03 ₹6,04,850 | 144 ₹3,08,826.72 | 210 ₹4,50,372.3 |
| 3.00 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump | 25.24 | Cum. | 5,100 ₹1,28,724 | 5,200 ₹1,31,248 | 5,801.76 ₹1,46,436.42 | 4,504.32 ₹1,13,689.04 Lowest | 4,800 ₹1,21,152 |
| 4.00 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification RCC Grade M30 RCC Grade M30 using batching plant & manual placing | 287.33 | Cum. | 6,200 ₹17,81,446 | 6,300 ₹18,10,179 | 884.8 ₹2,54,229.58 Lowest | 4,966.92 ₹14,27,145.12 | 4,700 ₹13,50,451 |
| 5.00 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm | 178.84 | Mtr. | 10,000 ₹17,88,400 | 10,000 ₹17,88,400 | 1,058.6 ₹1,89,320.02 Lowest | 14,608.32 ₹26,12,551.95 | 7,000 ₹12,51,880 |
| 6.00 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 75.85 | MT | 75,000 ₹56,88,975 | 89,000 ₹67,50,917 | 55,647.6 ₹42,21,037.4 Lowest | 84,608.64 ₹64,17,819.17 | 75,000 ₹56,88,975 |
| 7.00 | Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 23.86 | MT | 85,000 ₹20,28,100 | 96,500 ₹23,02,490 | 63,911 ₹15,24,916.46 Lowest | 92,723.4 ₹22,12,380.32 | 75,000 ₹17,89,500 |
| 8.00 | Carrying out the confirmatory boring for soil inestigation for foundation as per clause 2400 of MORTH specification | 45 | Mtr. | 2,000 ₹90,000 Lowest | 2,200 ₹99,000 | 2,417.4 ₹1,08,783 | 2,494.08 ₹1,12,233.6 | 2,500 ₹1,12,500 |
| 9.00 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications,RCC Grade M30. Height upto 5m RCC Grade M30 using batching plant, transit mixer & concrete pump | 601.76 | Cum. | 6,000 ₹36,10,560 | 6,600 ₹39,71,616 | 4,834.8 ₹29,09,389.25 Lowest | 5,262.19 ₹31,66,575.45 | 5,000 ₹30,08,800 |
| 10.00 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications | 75.54 | MT | 85,000 ₹64,20,560 | 89,000 ₹67,22,704 | 55,647.6 ₹42,03,397.11 Lowest | 84,608.64 ₹63,90,998.23 | 75,000 ₹56,65,200 |
Tender Value
₹5.8 Cr
EMD Value
₹5.8 L
Closing Date
29 Dec 2025, 12:00 pmClosed
Executive Engineer, R.C.D., Road Division, Latehar
EXECUTIVE ENGINEER, ROAD CONSTRUCTION DEPARTMENT, ROAD DIVISION, LATEHAR
Construction of Bridge over Local Nala at Chainage 12th Km. in Manika to Herhanj via Matlong Road
2025_CECOM_107407_1
RCD/LATEHAR/1043/2025-26 (1st Call)
Open Tender
Civil Works - Bridges
Item Rate
540 days
Local Nala at 12th Km. in Manika to Matlong Road
Document supporting technical paper as per SBD Document
3 documents required · 3 mandatory
₹10,000
₹5.8 L
19 Jun 2026
8 Dec 2025
30 Dec 2025
8 Dec 2025
29 Dec 2025
8 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Manual means using dozer , In area of light jungle | 0.43 | Hect. | - | - |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means Depth upto 3 m | 2,144.63 | Cum. | - | - |
| 3 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump | 25.24 | Cum. | - | - |
| 4 | Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification RCC Grade M30 RCC Grade M30 using batching plant & manual placing | 287.33 | Cum. | - | - |
| 5 | Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm | 178.84 | Mtr. | - | - |
| 6 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. | 0.2 | MT | - | - |
| 7 | Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 23.86 | MT | - | - |
| 8 | Carrying out the confirmatory boring for soil inestigation for foundation as per clause 2400 of MORTH specification | 45 | Mtr. | - | - |
| 9 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications,RCC Grade M30. Height upto 5m RCC Grade M30 using batching plant, transit mixer & concrete pump | 601.76 | Cum. | - | - |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications | 0.4 | MT | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
SBD12.pdf
Tender Documents • 4.04 MB
BOQ_144946.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .