| 1 | L1₹17.2 LAccepted-AOC PLOT NO 927 SECTOR 47 GURGAON 2022R6406 | GURGAON | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.5 L+₹1.3 L (7.69%)Rejected-Finance WSS GROUP BUILDING 59 2 NH 8 36 MILESTONE HARI NAGAR GURGAON GURGAON HARYANA 122001 HARI NAGAR GURGAON | GURUGRAM | HARYANA | 122001 | L2 | Rejected-Finance L2 |
Tender Value
₹17.3 L
EMD Value
₹34,512
Closing Date
8 Mar 2022, 5:00 pmClosed
R.Nagender Singh
XEN(E)
Construction of District Head Quarter office building for Excise and Taxation Department in Sector-19 Rewari (Pdg. LAN system only)
2022_HRY_205163_2
PWD/HRY/JAN-005
Open Tender
Electrical Works
Works
90 days
XEN(E)
Refer DNIT
2 documents required · 2 mandatory
₹1,000
₹34,512
24 Jun 2022
26 Feb 2022
9 Mar 2022
26 Feb 2022
8 Mar 2022
26 Feb 2022
Amount
Supply, Installation, Testing and Commissioning of CAT6 Information Outlet - Jack for AP Link Manufacturer should have ISO 9001:2008 Certification for Quality Management System.Manufacturer should have ISO 14001:2004 Certification for Environmental Management System complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work Make: AMP / Schneider / D-link.
Supply, Installation, Testing and Commissioning of Face Plate with 3x3 Gang Box Manufacturer should have ISO 9001:2008 Certification for Quality Management System.Manufacturer should have ISO 14001:2004 Certification for Environmental Management System complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work Make: AMP / Schneider / D-link.
Supply, Installation, Testing and Commissioning of Cat6 24 Port loaded UTP Patch Panel.Manufacturer should have ISO 9001:2008 Certification for Quality Management System.Manufacturer should have ISO 14001:2004 Certification for Environmental Management System complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work .Make:- Systemax/ AMP/D-Link/ R&M
Supply Installation Testing Commissioning of UTP Cat - Mounting Patch Cords complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work Make: AMP / Schneider / D-link.3 ft length
5 ft length
Supply, Installation, Testing and Commissioning of Wall Mount 9U x 600W x 600 D ,Front Glass Door (tinted,Toughened) with Lock & Key, 2 pairs of 19" Mounting Rails with U-Marking,Welded Side Walls With Metal Engraved D-Link Logo,1U Cable Manager (1), Hardware Packet (1 Pkt),6 Socket 5 Amp. Power Distribution Unit (1 No)Roof Mounted Fan Unit / 90 CFM /230V AC (1 No).Rack should be as per DIN41494 Standards.OEM must be ISO 9001,14001 certified complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work .Make:- Rittal/ APC/ D-Link/ Panduit
Supply, Installation, Testing and Commissioning of Server Rack/Network Enclosure Frame-800X1000-STEEL with accessories like fan, pdu, cable manager,castors wheels etc.Adjustable Levellers set of 4,19" Reduced Channel - Loop Type with Window Moldings,Glass Door-800-42U Single,Metal Vented Rear Door Double,Side Panels-1000-42U-Vented,Mounting Hardware-(Pack of 20),FHU with 4 FAN 360CFM,Vertical Power Distribution Unit with 12 x 5/15 sockets Round Pin, 230 Volts AC, 32 Amp with Plug,Horz. Cable Manager-1U-Loop. as per DIN 41494 or equivalent standard.Make:- Rittal/ APC/ D-Link/ Panduit
Supply,Installation and Comissioning of Core/Distribution Switch with minimum usable 24 10/100/1000BASE-T ports, 2 10GBASE-T ports , 4 10G SFP+ ports L3 Stackable Managed Switch with Redundant Power Supply Support,Console Port,9 Unit Stack Support,32 Unit SIM,ERPS,32Group LACP,Loopback Detection,Root Restriction,1024 Multicast Groups.Port-based VLAN,802.1v Protocol VLAN,Voice VLAN,MAC-based VLAN,VLAN translation,ISM VLAN,Asymmetric VLAN,Private VLAN,VLAN Trunking,Super VLAN,Multicast VLAN (ISM VLAN for IPv4/IPv6),Port Security,Broadcast/Multicast/Unicast Storm Control,DHCP Server Screening,ARP Spoofing Prevention,VRRP,DoS Attack Prevention,BPDU Attack Protection,RADIUS and TACACS+ authentication,Compliant with RoHS,Power saving,IEEE 802.3az,Cable diagnostics,802.3ah.SNMP v1/v2c/v3,System Log,sFlow,Multiple images,Multiple Configurations. VRRP,RIPv1/v2/ng,Static Routing-512 IPv4 entries,IGMP Filtering,Dynamic Routing.UL/cUL,CE,FCC.6Kv Surge Protection on all ethernet Ports complete in all respect up to the entire satisfaction of Engineer-in-Charge of the work. Make:- Cisco/Extreme/D-Link/Juniper
Supply Installation Testing & Commissioning of 5 KVA Online UPS with isolation transformer suitable for single phase AC Input and single Phase AC output, Floor Mounted type Rating of UPS 5 KVA, Indicative Backup time 120 Minutes Complete in all respect including bettery etc. as per DGS&D Specification MAKE:- APC/ LIBERT EINOVA/Emerson/ Aar Key
HSR 23.1.6.6Wiring main ,sub mains and Circuit wiring in two single core for phase and neutral wire and one single core for earth wire PVC insulated Copper conductor cable 1100 Volts grade in MS Conduit etc as required 2 run of Size 1.50 Sqmm(1/1.40mm)
HSR 23.7.6Supply and erection of PVC CONDUIT ISi marked (Medium) recessed in walVceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work PVC pipe of 20 mm dia
PVC pipe of 25 mm dia
PVC pipe of 32 mm dia
PVC pipe of 40 mm dia
HSR 23.23.10Supplying and drawing of 1 no UTP 4 pair CAT Sa LAN Cable in the existing surface/recess MS/PVC conduit as required
WSS SECURITY SOLUTIONS PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .