Tender Value
₹6.0 Cr
EMD Value
₹11.9 L
Closing Date
30 Jul 2026, 2:00 pm4d left
Superintending Engineer
Irrigation Work Circle Sitapur
Reconstruction of damaged culverts on the distributaries and minors of the Shahjahanpur Branch System under the Second Sub-division of the Sharda Canal Division, Shahjahanpur (Lot No. 06)
2026_UPIDC_1169914_6
02/SE/2026-27
Open Tender
Civil Works
Item Wise
365 days
Shahjahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,614
₹11.9 L
Sitapur
17 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordanary soil including all leads and lifts, labour charges, T& P etc. and disposal of earth as per direction of Engineer-in-charge. | 2,541.72 | M3 | 120 | ₹3,05,006.4 |
| 2 | Cement Concrete (M15) (1:2:4) with cement, coarse sand and 12 to 20 mm size stone ballast including all material labour T&P etc and proper completion of work. | 1,556.76 | M3 | 7,858.05 | ₹1,22,33,097.92 |
| 3 | M25 R.C.C 1:1:2 in Slab, wearing coat with coarse sand, crushed agg. 12 to 20 mm size & cement including cost of all material labour taxes &carriage upto site of work all lead lifts for proper completion of work with mechanical mixing and used vibrator also | 2,205.51 | M3 | 6,213.98 | ₹1,37,04,995.03 |
| 4 | Centering & Shuttering for R.C.C. work including cost of centring and shuttering up to 3.0mt height | 3,857.43 | M2 | 166.49 | ₹6,42,223.52 |
| 5 | Supply of HYSD steel barincluding bending, binding cutting and placing in position including cost of winding wire in R.C.C. Slab | 190.69 | M.T. | 121 | ₹23,073.49 |
| 6 | Earth work in embankment by power tranported earth with a lead beyond upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts and etc. | 24,249.42 | M3 | 121 | ₹29,34,179.82 |
| 7 | Supplying and fixing RCC wheel guard size 1.20x0.20x0.20 m including cost of all material labour and T&P required for proper completion of work./No | 156 | No | 121 | ₹18,876 |
| 8 | Finishing of walls with water proofing cement including providing and all material labour and T&P etc. required for proper completion of work | 1,462.86 | M2 | 121 | ₹1,77,006.06 |
| 9 | Dismentling of Brick work and cement concrete in cement mortar and including stacking of material with in a distance of 60.0 m. | 550.02 | M3 | 121 | ₹66,552.42 |
| 10 | Dismentling of C.C. or granolite floor including base concrete and including stacking of material with in a distance of 60.0 m | 239.87 | M3 | 121 | ₹29,024.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_2195226.xls
BOQ • 0.24 MB
BID-Lot-6.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].