| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-AOC 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | L1 | Accepted-AOC ELIGIBLE | |
| 2 | L2₹31.6 L+₹50,760 (1.63%)Rejected-AOC MATHOSHREE PLOT NO 55 SR NO 787 A BEHIND ASHWANI HOSPITAL GOVIND NAGAR NASIK 422 009 | NASIK | NASHIK | MAHARASHTRA | 422009 | L2 | Rejected-AOC ELIGIBLE | |
| 3 | L3₹46.8 L+₹15.7 L (50.6%)Rejected-AOC FLAT NO 2 AMEYA APARTMENT SHIV COLONY NEAR PANDAV NAGARI INDIRA NAGAR NASHIK 422009 | NASHIK | NASHIK | MAHARASHTRA | 422009 | L3 | Rejected-AOC ELIGIBLE |
Tender Value
Refer Docs
EMD Value
₹64,000
Closing Date
13 Apr 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE AF NAGPUR
HQ CWE AF NAGPUR VAYUSENA NAGAR, NAGPUR 440007 MILITARY ENGINEER SERVICES
SPECIAL RAPAIR / REPLACEMENT OF CHILLAR PLANT AT RSD M AT AF STATION OJHAR.
2021_MES_428417_1
80400
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE AF OJHAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹64,000
Yes
9 Jul 2021
5 Mar 2021
17 Apr 2021
6 Mar 2021
13 Apr 2021
30 Mar 2021
60 days
Amount
Water inlet temperature = 15 ° C Water Outlet temperature = 7 ° C Fouling Factor = 0.0000180 Fluid flow Rate = 36.19 cum/hr (b) CONDENSER: (i) Horizontal Multiphase shell & tube type water cooled condensers having M.S. shell & internally fins of copper tube to match with the above compressors. The condenser shall be complete with isolating valve, hot gases inlet & outlet, safety valve, purge valve. One gate valve at water inlet & one at outlet water drain connections. Condenser shall also be provided with thermometer & pressure gauges at water inlet & outlet with water pressure and flow switches . (ii) All safety features viz suction and discharge shut off valves, drive sets, suction strainer and safety valves HP/LP and oil pressure cut off switches and gauges.and shall be able to provide following unit operating condition: Water inlet temperature = 35 ° C Water Outlet temperature 30° C Fouling Factor = 0.0000440 Water flow Rate = 44.93 cum/hr (c) ELECTRIC MOTORS & CONTROL PANEL : Electric motor 3 phase suitable for operation of above compressors on 380/440 V, 50HZ, AC supply as per manufacturers recommendations with suitable starter as automatic Star-Delta type ISI standards having over load, reverse phase protection/single phase protection etc shall be provided,along with microprocessor based control panel with open protocol for hook up with BMS & KWH electronic(energy) meter to record power(unit) consumption . The power factor of the total system shall be 0.95 or above on load.
(d) REFRIGERATION LINE: Refrigerant shall be R407c .Copper Refrigerant pipe duly insulated and suitable pipe fittings ,water pipeline shall be heavy duty, MS tubes ‘C’ class including valves to interconnect the compressor and condenser, expansion valve and condenser water piping as per standards. The liquid indicator and liquid line filter shall be provided with isolating valves on both sides. (e) STRUCTURE: MS heavy duty structure steel frame for mounting the chiller unit with anti-vibration isolation pads. (f) INSULATION: Insulation to chiller and suction/discharge line shall be as per manufacturer’s instructions. (g) CONTROLS: Control comprising of thermostatic expansion valves, solenoid pilot valve & cooling thermostatic & humidity control switch. (h) ACCESSORIES & INTERLOCKS : Integral refrigerant piping & wiring, accessories as required and called for Automatic and safety control mounted in central console electronic microprocessor, with internal overload protector, complete including Chiller,condenser , MS piping for chiller & condenser (inlet & outlet)and ,suiable size Chilled water pipping , suitable Butter fly valves,NRV,Double regulating valves,,Y strainer,Ball valves,pressuregauges,thermometer,automatic purge valve,Expansionbellow,test plug/dead plug,drainvalve,3 way mixing valve modulating type,consate drain pipes,Expansion tank,condenser water piping,Descaling valve.
(k) Gauges : Pressure gauges with siphon & cock and temperature gauges shall be instrumental type comprising of pressure gauges, industrial type thermometer, dry & wet bulb thermometer etc. (m) ELECTRIC WORKS COMPRISING OF: (n) LT cables with XLPE insulated armored, heavy duty cable with aluminum conductor 1100 Volts grade of suitable sizes and capacities as required for connecting various equipment) CIVIL WORK COMPRISING OF: - i. Foundation PCC/RCC as recommended by OEM & MS fabrication for equipment such as Compressor/Chiller &Condensor , panel board, pump sets, cooling tower, make-up water tank, expansion tank, pipe line and common headers etc. ii. Excavation work for pipe work, cable work, foundation support etc. iii. Opening in walls for ducts, blanking(dummy) plates etc finishing of opening to match the existing work all as specified.Rate Quoted are deemed to be included with material & labour required for foundation iMS Base frame, making condensor,chilled water & process pump conection ,suitable MS pipe of suitable dia and length & suitable fittings insulated with 25 mm nitrile rubbber insulation & cover with glass cloth and UV paint duly as equired to meet suction & delivery end/fittings for inlet outlet connection ,suitable flanges , rubber gasket, SS304 nut bolts etc for smooth and leak free running of plant(iv)including dismantling of existing unit (ie compressor,chiller ,condensor along with drive motor from its base from its foundation and its MS steel structure )and depositing entire unit at MES yard NOTE : The rate quoted for Item No. 01 above shall include for all misc works given in BOQ as per Manufactures in Annexures viz All civil works, Earthwork and Excavation, PCC/RCC works, MS Fabrication works etc.
Water inlet temperature = 15 ° C Water Outlet temperature = 7 ° C Fouling Factor = 0.000020 Fluid flow Rate = 15.38 cum/hr Max operating pressure = 150 Psig (b) CONDENSER: (i) Horizontal Multiphase shell & tube type water cooled condensers having M.S. shell & internally fins of copper tube to match with the above compressors. The condenser shall be complete with isolating valve, hot gases inlet & outlet, safety valve, purge valve. One gate valve at water inlet & one at outlet water drain connections. Condenser shall also be provided with thermometer & pressure gauges at water inlet & outlet with water pressure and flow switches and evaporator duly insulated. (ii) All safety features viz suction and discharge shut off valves, drive sets, suction strainer and safety valves HP/LP and oil pressure cut off switches and gauges.and shall be able to provide following unit operating condition: Water inlet temperature = 35 ° C Water Outlet temperature 30° C Fouling Factor = 0.0000440 Water flow Rate = 18.92 cum/hr Max operating pressure = 150 Psig
(c) ELECTRIC MOTORS & CONTROL PANEL : Electric motor 3 phase suitable for operation of above compressors on 380/440 V, 50HZ, AC supply as per manufacturers recommendations with suitable starter as automatic Star-Delta type ISI standards having over load, reverse phase protection/single phase protection etc shall be provided,along with microprocessor based control panel with open protocol for hook up with BMS & KWH electronic(energy) meter to record power(unit) consumption . The power factor of the total system shall be 0.95 or above on load. (d) REFRIGERATION LINE: Refrigerant shall be R407c .Copper Refrigerant pipe duly insulated and suitable pipe fittings ,water pipeline shall be heavy duty, MS tubes ‘C’ class including valves to interconnect the compressor and condenser, expansion valve and condenser water piping as per standards. The liquid indicator and liquid line filter shall be provided with isolating valves on both sides. (e) STRUCTURE: MS heavy duty structure steel frame for mounting the chiller unit with anti-vibration isolation pads. (f) INSULATION: Insulation to chiller and suction/discharge line shall be as per manufacturer’s instructions.(c) CONTROLS: Control comprising of thermostatic expansion valves, solenoid pilot valve & cooling thermostatic & humidity control switch. (g) ACCESSORIES & INTERLOCKS : Integral refrigerant piping & wiring, accessories as required and called for Automatic and safety control mounted in central console electronic microprocessor, with internal overload protector, complete including Chiller,condenser , MS piping for chiller & condenser (inlet & outlet)and ,suiable size Chilled water pipping , suitable Butter fly valves,NRV,Double regulating valves,,Y strainer,Ball valves,pressuregauges,thermometer,automatic purge valve,Expansionbellow,test plug/dead plug,drainvalve,3 way mixing valve modulating type,consate drain pipes,Expansion tank,condenser water piping,Descaling valve.
(h) Gauges : Pressure gauges with siphon & cock and temperature gauges shall be instrumental type comprising of pressure gauges, industrial type thermometer, dry & wet bulb thermometer etc. (i) ELECTRIC WORKS COMPRISING OF: (i) LT cables with XLPE insulated armored, heavy duty cable with aluminum conductor 1100 Volts grade of suitable sizes and capacities as required for connecting various equipments all as specified. (j) CIVIL WORK COMPRISING OF : - i. Foundation PCC/RCC as recommended by OEM & MS fabrication for equipment such as Compressor/Chiller &Condensor , panel board, pump sets, cooling tower, make-up water tank, expansion tank, pipe line and common headers etc. ii. Excavation work for pipe work, cable work, foundation support etc. iii. Opening in walls for ducts, blanking (dummy) plates etc finishing of opening to match the existing work all as specified.Rate Quoted are deemed to be included with material & labour required for foundation MS Base frame, making condensor,chilled water & process pump conectionusing suitable MS pipe of suitable dia and length & suitable fittings as required over site duly insulated with 25 mm nitrile rubbber insulation & cover with glass cloth and UV paint duly as equired to meet suction & delivery end/fittings for inlet outlet connection ,suitable flanges , rubber gasket, SS304 nut bolts etc for smooth and leakfree running of plant(iv)including dismantling of existing unit (ie compressor,chiller ,condensor along with drive motor from its base from its foundation and its MS steel structure ) and depositing entire unit at MES yard. NOTE : The rate quoted for Item No. 02 above shall include for all misc works given in BOQ as per Manufactures in Annexures viz All civil works, Earthwork and Excavation, PCC/RCC works, MS Fabrication works etc.
Supply ,install ,testing & commisssioning ID type outdoor ,horizontal discharge,cross flow cooling tower capable of handling 45.00 Cubic meter per hour flow operating at inlet temperature off 35° C & outlet at 30° C at design wet bulb temperture of 27° C with fan of dia 1.219 meter, running at 683 RPM coupled to TEFC ,IE2 motor of 1.5 KW,415 V ,50 Hz,IP 55,weatherproof,cooling tower shall be rectangular in profile,spiral target nozzeles in hot water basin which sprays water under gravity uniformly into the fill with High performance PVC fill with drift eliminaters ,Fill casing made up of FRP,polypropylene nozzel,Basin FRP, multi blade propeller type axial flow fan with adjustable pitch driven through pulley driven V belt allowing location of motor outside moist & Humid air stream,,including aluminium ladder ,structure and framework shall be FRP construction & shall be able to withstand wind & earthquake loads ,making necessary inlet outlet water pipeline connections with exising pipeline using sutable size MS fittings/ fixutre/HDG steel Nut & bolt .entire assembly is to be mounted over suitable RCC structure as recommended by manufacturer,including taking down existing unit from its foundation and depositing entire unit at MES yard,complete all as specified & as directed by Engineer-In-Charge. Make :Paharpur/ Advance \/ Himgiri. NOTE : The rate quoted for Item No. 03 above shall include for all misc works given in BOQ as per Manufactures in Annexures viz All civil works, Earthwork and Excavation, PCC/RCC works, MS Fabrication works etc.
Material & labour Supply,installation,testing and commissioning of MS chillled water make up tank with 6 mm thickness of size 2.80 x 2.40 x2.15 with air vent ,drain & inlet/outlet valve & level indicator with 32 mm nitrile rubber insulation over its external surface duly covered with glass cloth and UV paint ,entire tank is to be mounted over new RCC foundation of & existing inlet outlet pipeline is to be connected(drawing attached),including demolishing/ dismantling and taking down existing tanks from its foundation and depositing entire unit at MES yard.(Rate quoted are deemed To be included with RCC foundation (Excavation in any type of strata around 21 Cubic meter, PCC 1:4:8 work around 1 cubic meter,followed by RCC(1:2:4) including Footing with column and slab = 7 cubic meter & MS Bar (16 mm ,12 mm ,10mm ,8 mm around 450 Kg) followed by form work around 15 sq.m & plaster and painting with cement based paint 20 Sq M). NOTE : The rate quoted for Item No. 04 above shall include for all misc works given in BOQ as per Manufactures in Annexures viz All civil works, Earthwork and Excavation, PCC/RCC works, MS Fabrication works etc.
Supply & fix MS flanged pipe 65 mm NB heavy dutywith 25 mm nitrile rubber insulation over its external surface duly covered with glass cloth and UV paint entire pipe is to be mounted over new MS steel foundation ,including demolishing/ dismantling and taking down existing pipes from its foundation and depositing entire unit at MES yard.
Supply and lay,testing & commissioning LTUG cable 3.5 core 95 Sqmm, 1100 volt grade, XLPE insulated armoured (heavy duty) stranded aluminium conductor complete all as specified.
DURGAI ELECTRICALS
United Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .