Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC | ₹3.5 Cr | 1 | Accepted-AOC aoc |
| 2 | 2₹3.6 Cr+₹9.9 L (2.86%)Rejected-Finance | ₹3.6 Cr+₹9.9 L (2.86%) | 2 | Rejected-Finance reject |
| 3 | 3₹3.7 Cr+₹22.5 L (6.52%)Rejected-Finance | ₹3.7 Cr+₹22.5 L (6.52%) | 3 | Rejected-Finance reject |
| 4 | 4₹3.7 Cr+₹23.7 L (6.86%)Rejected-Finance | ₹3.7 Cr+₹23.7 L (6.86%) | 4 | Rejected-Finance reject |
| 5 | 5₹3.8 Cr+₹30.2 L (8.75%)Rejected-Finance | ₹3.8 Cr+₹30.2 L (8.75%) | 5 | Rejected-Finance reject |
Tender Value
₹4.8 Cr
EMD Value
₹4.8 L
Closing Date
20 Jul 2022, 5:30 pmClosed
E.E. PWD DIVISION SHAJAPUR
E.E. PWD DIVISION SHAJAPUR
CONSTRUCTION OF PAGRAWAD TO PIPALRAVA ROADS LENGTH 5.5 K.M. Inclusive pole Shifting work
2022_PWDRB_206504_1
02/22-23 dated 24.05.2022
Open Tender
Civil Works - Roads
Percentage
240 days
CONSTRUCTION OF PAGRAWAD TO PIPALRAVA ROADS LENGTH
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
₹4.8 L
12 Dec 2022
25 May 2022
22 Jul 2022
31 May 2022
20 Jul 2022
31 May 2022
eProcurement System Government of Madhya Pradesh Created By: RAVINDRA KUMAR VERMA Created Date/Time: 10-Aug-2022 03:53 PM Tender Title: CONSTRUCTION OF PAGRAWAD TO PIPALRAVA ROADS LENGTH 5.5 K.M. Inclusive pole Shifting work Tender ID: 2022_PWDRB_206504_1
Tender Inviting Authority: Executive Engineer P.W.D. Division Shajapur
Name of Work: CONSTRUCTION OF PAGRAWAD TO PIPALRAVA ROADS LENGTH 5.5 K.M. Inclusive pole Shifting work
Contract No: 90096-99029 E.E. P.W.D. Division Shajapur
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 GSB Infrastructure(GSTN-23AASFG5509Q1ZR) 47660000.00 -27.56 34524904.00 Three Crore Fourty Five Lakh Twenty Four Thousand Nine Hundred and Four
2.00 santosh kumar sonania(GSTN-23BBWPS2895H1Z0) 47660000.00 -25.49 35511466.00 Three Crore Fifty Five Lakh Eleven Thousand Four Hundred and Sixty Six
3.00 JITENDRA SING TAKAT SING(GSTN-23AHVPR3852K2ZN) 47660000.00 -18.33 38923922.00 Three Crore Eighty Nine Lakh Twenty Three Thousand Nine Hundred and Twenty Two
4.00 S Kumar Infracons (India) Private Limited(GSTN-24AAQCS0002F1ZU) 47660000.00 -22.59 36893606.00 Three Crore Sixty Eight Lakh Ninty Three Thousand Six Hundred and Six
5.00 Shiv Shakti Construction Company(GSTN-23BAFPP0833E1Z5) 47660000.00 -17.40 39367160.00 Three Crore Ninty Three Lakh Sixty Seven Thousand One Hundred and Sixty
6.00 MS RAJENDRA KUMAR AGRAWAL(GSTN-23ABWPA1305K1ZW) 47660000.00 -21.22 37546548.00 Three Crore Seventy Five Lakh Fourty Six Thousand Five Hundred and Fourty Eight
7.00 RADHE RADHE CONSTRUCTION(GSTN-NA) 47660000.00 -18.00 39081200.00 Three Crore Ninty Lakh Eighty One Thousand Two Hundred
8.00 M/s Mukesh Kumar Verma Contractor(GSTN-NA) 47660000.00 -22.84 36774456.00 Three Crore Sixty Seven Lakh Seventy Four Thousand Four Hundred and Fifty Six
Lowest Amount Quoted BY: GSB Infrastructure(34524904.00)
BOQ Summary Details Tender Title: CONSTRUCTION OF PAGRAWAD TO PIPALRAVA ROADS LENGTH 5.5 K.M. Inclusive pole Shifting work Tender ID: 2022_PWDRB_206504_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 GSB Infrastructure 34524904.00 L1
2 santosh kumar sonania 35511466.00 L2
3 M/s Mukesh Kumar Verma Contractor 36774456.00 L3
4 S Kumar Infracons (India) Private Limited 36893606.00 L4
5 MS RAJENDRA KUMAR AGRAWAL 37546548.00 L5
6 JITENDRA SING TAKAT SING 38923922.00 L6
7 RADHE RADHE CONSTRUCTION 39081200.00 L7
8 Shiv Shakti Construction Company 39367160.00 L8
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .