| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
23 Jul 2024, 12:00 pmClosed
SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
VARIOUS SITE EXISTING 250 KVA AND 400 KVA DT TF PLINTH REPAIR, NEW FENCING, EARTHING AND NEW 33 KV VCB INSTALLATION AND OTHER WORK WORK IN BUSINESS PLAN 2024-25
2024_PVVNL_924075_3
226/2023-24/EDC-I/MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EDD II MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I MZN
₹10,500
24 Jul 2024
27 Jun 2024
23 Jul 2024
27 Jun 2024
23 Jul 2024
27 Jun 2024
Amount
The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
33 KV VCB 750 MVA with STEEL STRUCTURE
33 KV LINE ISOLATOR
33 KV BUS ISOLATOR
33 KV FUSE SET
33 KV LIGHTNING ARRESTAR
LT XLPE CABLE 1x400 Sqmm
XLPE CABLE ALUMINIUM 1x50 Sqmm
Complete work of installing the electrical material received from the store center at the site.
Complete work of installation and commissioning of new 33 KV VCB 750 MVA with STEEL STRUCTURE at 33/11 KV sub-station. as per RESPO standards.
Complete work of installation and commissioning of new 33 KV CT at 33/11 KV sub-station. as per RESPO standards.
Complete work of Removal of old / damaged 33 KV LINE ISOLATOR at 33/11 KV sub-station and installation and commissioning of new 33 KV LINE ISOLATOR 800 Amp. as per RESPO standards.
Complete work of Removal of old / damaged 33 KV BUS ISOLATOR at 33/11 KV sub-station and installation and commissioning of new 33 KV BUS ISOLATOR 800 Amp. as per RESPO standards.
Complete work of Removal of old / damaged 33 KV FUSE SET at 33/11 KV sub-station and installation and commissioning of new 33 KV FUSE SET. as per RESPO standards.
Complete work of installation and commissioning of new 33 KV LIGHTNING ARRESTAR at 33/11 KV sub-station. as per RESPO standards.
Complete work of Laying/ Installation CONTROL CABLE 4x2.5 Sqmm at 33/11 KV sub-station. as per RESPO standards. In which Control Cable 4x2.5 Sqmm and other Decentralized materials will be provide by the contractor / Firm.
Complete work of Laying/ Installation CONTROL CABLE 2x2.5 Sqmm at 33/11 KV sub-station. as per RESPO standards. In which Control Cable 2x2.5 Sqmm and other Decentralized materials will be provide by the contractor / Firm.
Replacement work of LT XLPE CABLE 1x400 Sqmm on the Established Distribution Transformer 250 KVA & 400 KVA installed at various site as per RESPO norms. Including opening / dismantling of old / damaged cable of the transformer.
Replacement work of XLPE CABLE ALUMINIUM 1x50 Sqmm on the Established Distribution Transformer 250 KVA & 400 KVA installed at various site as per RESPO norms. Including opening / dismantling of old / damaged cable of the transformer.
Complete work of Pipe Earthing (upto Water Level) of Established 33 KV VCB at 33/11 KV substation, as per RESPO standards.
Complete work of Pipe Earthing (upto Water Level) of Established 33 KV CONTROL PANNEL at 33/11 KV substation, as per RESPO standards.
Complete work of Pipe Earthing (upto Water Level) of Established ISOLATOR STRUCTURE at 33/11 KV substation, as per RESPO standards.
Complete Repair work of damaged plinth of 250 KVA Distribution Transformer (08 No.) & 250 KVA Distribution Transformer (02 No.) installed at the site as per RESPO standards, includes removing the 250 KVA & 400 KVA distribution transformer safely from the plinth, after repair work done the plinth, installing and making the transformer as per RESPO Standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Making New Fencing for 250 KVA Distribution Transformer (08 No.) & 250 KVA Distribution Transformer (02 No.) as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm.
Complete work of Pipe Earthing (upto Water Level) of Established 250 KVA Distribution Transformer (08 No.) & 250 KVA Distribution Transformer (02 No.) at various site, as per RESPO standards.
As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar.
33 KV ISOLATOR (SCRAP/DAMAGE)
33 KV FUSE SET (SCRAP/DAMAGE)
LT LEAD (SCRAP/DAMAGE)
M/S Vikas Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .