Construction of Hot Dipped Galvanized Iron Chain link mesh or Compound Wall of R and B Circuit Guest House in Mahabubnagar District.
723239
DRBO/R&B/MBNR/12/TENDERS/2026-27, Dt:27.07.2026
OPEN
Buildings
MAHABUBNAGAR, TELANGANA
5 documents required · 5 mandatory
₹52
₹1,461
1 Aug 2026
1 Aug 2026
3 Aug 2026
Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS 20B (ApSS 308) in Ordinary Soil-Manual Means-Upto 3M depth For East side Gate & North side Gate
Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING For East side Gate & North side Gate
Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing and cost of overheads & contractors profit etc., complete for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX. For East side Gate & North side Gate Footings and For Columns East side Gate & North side Gate Columns
Plastering 12 mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, but including sales & other taxes on all materials, and all operational, incidental charges on materials including centering using Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., HIRE CHARGES FOR CENTERING & SCAFFOLDING .etcand including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for Internal & Even faces of Brick Wall and RCC exposed faces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 12 mm (Out Side & In Side) For Columns East side Gate & North side Gate Top
Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats. For Columns East side Gate & North side Gate Top
Providing Mild Steel Tubes & pipes of all diameters as per IS-1161, of different diameters, cutting, placing in position, including cost and conveyance of all materials to work site and all operational, incidental, labour charges including cost of overheads & contractors profit complete for finished item of work for purlins of AC sheet roofing. For Compound Wall East & South side
Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 3"x3" (76 mm x 76 mm) - 8 Gauge For Compound Wall Mesh
Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by (GOEL, SFIYAM, JAI BALAJI, AFSTAR/MSLIFE TMT. RADHA TMT, SUGNA TMT) as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126) For East side & South side Footing & Column
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Boq Compound Wall.xlsx
TENDER_DOCUMENT • 0.02 MB
Bid Document (1).docx
TENDER_DOCUMENT • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .