Tender Value
₹17.7 L
EMD Value
₹35,402
Closing Date
20 Feb 2026, 4:00 pmClosed
Executive Engineer(E)
O/o Executive Engineer(E) ESS 33kV 1st Floor Kidwai Nagar West, Delhi
Servicing, Leakage Arrest and Overhauling of Power Transformer at Vidyut Bhawan Old PTR no 1(16/20MVA) and Tilak Marg PTR no 2(16/20MVA) under M-33kV Division in NDMC (Special Repair).
2026_NDMC_286844_1
18/EE(M-33kV)/Elect./2025-26
Open Tender
Electrical Works
60 days
Vidyut Bhawan and Tilak MArg
As per NIT
2 documents required · 2 mandatory
₹0
₹35,402
12 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
1. Dismantling of all Transformer Accessories such as Radiators, Conservator, Cooling Fan, Bushing (HV & LV) Bus-bar. Buccholz Relay and the connecting pipes etc. by using suitable crane or by manually after draining of complete oil into oil drum tankers. 2. Lifting Top Cover of Transformer main tank and OLTC by using heavy duty crane after removing of complete Nut-Bolts and removing of all old damaged gaskets. 3. Washing/Cleaning of Core-winding and coil assembly of Transformer main tank and OLTC with hot oil by using connecting pipe with pump/filter machine for removing of sludge including checking/ replacement of damaged OLTC Fixed/ Moving Contacts transition resistance. 4. Attending leakage from OLTC terminal boards & oil seal inspection window. 5. Fixing new gasket of transformer, radiators, inspection window etc. 6. Refusing of Top cover of the main tank and OLTC Top plate after checking/repairing of OLTC connection and Tightening of the Nut Bolts of core assembly by using heavy duty crane. 7. During overhauling of transformer dry air purging should be carried out avoiding moisture. The dew point of dry air should be greater than 60 degree. 8. Making and fusing of blanking plates. pressure testing, healing of transformer to dry out it by applying of 3 cycle of vacuum and Nitrogen for improvement of IR/PI value of the transformer. 9. Dry out should be carried out by purging dry air nitrogen having dew point heating & vacuum massing the job till the required PI value achieve. 10. Washing, Cleaning and spray painting of transformer main tank, radiators and its accessories by using ISI market superior quality paint by applying tree coat of required colour paint. 11. The paint should be high quality glow paint which do not led due to sun heat. 12. Assembling/ Erection of all the Tr. accessories such as Radiator, Conservator, Buchholz and all the connecting. pipe etc. by using suitable capacity crane and man power with new gasket. 13. Filtration of transformer oil upto the BDV of 60 KV. Filter machine and operator will be arranged by the contractor. 14. Any other work required for Overhauling/Servicing of power transformer and its satisfactory working there after which is not specifically mentioned IS:10028 (Part-III).
Following testing of oil need to be conducted after filtration / dehydration of oil: DGA, BDV, Water content PPM and resistivity of oil.
Final Testing and commissioning of 20MVA Power Transformer with complete Test Report
ADD: GST @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 29.58 MB
BOQ_379903.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid