| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-AOC | 1 | Accepted-AOC Below Estimate | |
| 2 | 2₹4.1 L+₹546 (0.13%)Rejected-AOC | 2 | Rejected-AOC Above Estimate |
| Sl No | Description | Qty | Unit | K R KRISHNAMOORTHY L1 | RAJARAM L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 20 | m3 | 6,900 ₹6,900 Lowest | 7,000 ₹7,000 |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 7 | m3 | 48,699 ₹48,699 Lowest | 48,720 ₹48,720 |
| 3.00Supplying and erecting shuttering including Necessary supports for plain surfaces such asR.C.C. Columns for footings, plimn beam, Stair case, RCC. Critical pier etc., complete In all floor. | |||||
| 3.01 | a) Below 1m Height | 3 | m2 | 1,287 ₹1,287 Lowest | 1,290 ₹1,290 |
| 3.02 | b) Above 1m Height | 33 | m2 | 28,347 ₹28,347 Lowest | 28,380 ₹28,380 |
| 4.00 | Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 40% of 40mm size and 60% of 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specification | 28.5 | m3 | 2,07,423 ₹2,07,423 Lowest | 2,07,480 ₹2,07,480 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 3.5 | m3 | 29,155 ₹29,155 Lowest | 29,172.5 ₹29,172.5 |
| 6.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using best Country III Class Bricks of size 8¾"x4¼x2¾ from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications | 7.5 | m3 | 56,895 ₹56,895 Lowest | 56,925 ₹56,925 |
| 7.00 | Plastering with cement mortar 1: 5 mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2 | 61 | m2 | 22,326 ₹22,326 Lowest | 22,570 ₹22,570 |
| 8.00 | Plastering with cement mortar 1: 3mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2 | 13.5 | m2 | 5,157 ₹5,157 Lowest | 5,197.5 ₹5,197.5 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
16 Dec 2025, 3:00 pmClosed
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of C.C Floor with retaining wall at Ward No. 10 in Hulical TP (MLACDS 2025-26)
2025_DTP_632107_1
198/2025-3
Open Tender
Civil Works
Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
8 Mar 2026
15 Dec 2025
16 Dec 2025
15 Dec 2025
16 Dec 2025
15 Dec 2025
15 Dec 2025 - 16 Dec 2025
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
a) Below 1m Height
b) Above 1m Height
Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 40% of 40mm size and 60% of 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specification
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using best Country III Class Bricks of size 8¾"x4¼x2¾ from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications
Plastering with cement mortar 1: 5 mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2
Plastering with cement mortar 1: 3mix to 12mm thick including cost and conveyance of all materials to site including curing etc.,complete as per standard specification – 10m2
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_756201.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .