Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹9.3 L
Closing Date
7 Oct 2026, 12:30 pm5d left
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Minor Bridge on Ral Drain (3x7.10m Span) at NH-19 to Arhera Bajna Bati road KM-6 in District Mathura
2026_CEAGR_1191778_2
4853/14M-AC/2026-27 dated 05-09-2026
Open Tender
Civil Works - Bridges
Percentage
180 days
Mathura
Construction of Minor Bridge
2 documents required · 2 mandatory
₹2,360
₹9.3 L
Yes
Agra
1 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORT&H Specification no. 12.1 (304). | 921 | Cum | 88 | ₹81,048 |
| - | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORT&H Specification no. 12.03 | 114 | Cum | 1,524 | ₹1,73,736 |
| - | PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing. | 133 | Cum | 5,543 | ₹7,37,219 |
| - | Plain Cement Concrete (PCC Grade M-20 ) in Open Foundation complete as per Drawing and Technical Specifications. | 108 | Cum | 7,413 | ₹8,00,604 |
| - | Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8G Case II. | 215 | Cum | 8,101 | ₹17,41,715 |
| - | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.42 | 57 | MT | 74,500 | ₹42,46,500 |
| - | Furnishing and Placing Reinforced/ Prestressed (RCC Grade M 30) cement concrete in super-structure as per drawing and Technical Specification. As per MORT&H Specification no. 14.1C. | 300 | cum | 9,099 | ₹27,29,700 |
| - | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702 As per MORT&H Specification no. 14.4 | 19.5 | cum | 13,858 | ₹2,70,231 |
| - | Providing and laying Flooring complete as per drawing and Technical specifications laid over cement concert bedding. | 135 | cum | 5,930 | ₹8,00,550 |
| - | Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. | 225 | cum | 2,432 | ₹5,47,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_2248639.xls
BOQ • 0.29 MB
T2_ArheraBajna2.pdf
Tender Documents • 2.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .