Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.3 LAccepted-Finance 5546 NICHOLSON ROAD SADAR BAZAR AMBALA HARYANA 133001 | AMBALA | HARYANA | 133001 | ₹32.3 L | 1 | Accepted-Finance Accept |
| 2 | 2₹32.4 LAccepted-Finance | ₹32.4 L | 2 | Accepted-Finance Accept |
| 3 | 3₹34.5 LAccepted-Finance | ₹34.5 L | 3 | Accepted-Finance Accept |
| 4 | 4₹36.0 LAccepted-Finance | ₹36.0 L | 4 | Accepted-Finance Accept |
| 5 | 5₹36.4 LAccepted-Finance | ₹36.4 L | 5 | Accepted-Finance Accept |
Tender Value
₹37.2 L
EMD Value
₹74,411
Closing Date
4 Jun 2026, 6:00 pmClosed
Udyog Vihar, Sriganganagar
OFFICE OF THE REGIONAL MANAGER RIICO, UDYOG VIHAR, SRIGANGANAGAR
Construction of Boundary wall around Dumping Yard at Industrial Area Hanumangarh Ph-II
2026_RIICO_561676_1
12/2026-27/(A)
Open Tender
Civil Works
Percentage
150 days
Hanumangarh Ph-II
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
RIICO LTD.,
₹74,411
Yes
5 Jun 2026
25 May 2026
5 Jun 2026
25 May 2026
4 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 739.2 | Cum. | 178 | ₹1,31,577.6 |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 62.37 | Cum. | 3,302 | ₹2,05,945.74 |
| 3 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks, Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 347.19 | Cum. | 4,263 | ₹14,80,070.97 |
| 4 | Providing and laying in position specified grade of cement concrete for RCC structural elements upto floor five level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers (if required ) excluding the cost of centering, shuttering and reinforcement for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. M20 grade Nominal Mix / Design Mix | 24.25 | Cum. | 5,609 | ₹1,36,018.25 |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) | 1,306.64 | Kg. | 77 | ₹1,00,611.28 |
| 6 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 179.85 | Sqm. | 340 | ₹61,149 |
| 7 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :, Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 162.11 | Cum. | 4,990 | ₹8,08,928.9 |
| 8 | Add extra for Square or Rectangular Pillars in Superstructre brick work up to five storey, Upto 45 cm length and all sides are free | 27.56 | Cum. | 327 | ₹9,012.12 |
| 9 | Plaster on new surface on walls in cement sand mortar 1:4 including racking of joints etc. complete fine finish : 20mm thick . | 2,016 | Sqm. | 202 | ₹4,07,232 |
| 10 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40mm nominal size). | 5.41 | Cum. | 4,544 | ₹24,583.04 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TformA.pdf
Tender Documents • 0.19 MB
BOQ_999556.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].