| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC | ₹10.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 L+₹1.1 L (10.6%)Rejected-AOC | ₹11.1 L+₹1.1 L (10.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹11.1 L+₹1.1 L (10.9%)Rejected-AOC | ₹11.1 L+₹1.1 L (10.9%) | L3 | Rejected-AOC L3 |
| 4 | L4₹11.1 L+₹1.1 L (11.0%)Rejected-AOC | ₹11.1 L+₹1.1 L (11.0%) | L4 | Rejected-AOC L4 |
Tender Value
₹11.2 L
EMD Value
₹1.1 L
Closing Date
5 Aug 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction of covered RCC drain and interlocking tile paving at Municipal Corporation Zonal Office No. 1 in Ward 42 Numaish Camp.
2026_NNSAH_1173509_1
6335 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
₹1.1 L
1 Sept 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in ordinary soil with lift 1.5m & lead upto 30m etc including all work complete (S.I. No. 251{a}) | 57.6 | cum | 90 | ₹5,184 |
| 2 | Disposal of Excavated Sol up to 5.00 KM distance complete with labour T&P ETC at site (SOR UP PWD SI-131(A) | 46.08 | cum | 130 | ₹5,990.4 |
| 3 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI-273) | 7.2 | cum | 2,985 | ₹21,492 |
| 4 | Construction of Granular sub-base by providing Coarse graded Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in lace method with rotavator of OMC, and compacting with vibratory power roller to achieve the desired density. complete (As per clause 401 RA) | 64 | cum | 2,015 | ₹1,28,960 |
| 5 | R.C.C. Work with cement, approved coarse sand & 2 cm guage approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. (SOR UP PWD SI-284a) | 14.7 | cum | 7,400 | ₹1,08,780 |
| 6 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape as necessary inciding bending for proper complition of the work and including supply of all steel & wastage, bend, hooks and authorised everlapping hall be measured.(As per analysis) | 1,153.95 | kg | 85.29 | ₹98,420.4 |
| 7 | M-150Brick work in one cement & Four course sand mortar in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI-305a) | 3.17 | cum | 4,690 | ₹14,867.3 |
| 8 | 12 mm thick plaster with cement and ccorse sand of 1:25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1cm.including supply of all materals labour 1&p etc. (SOR UP PWD SI-584a) | 23.2 | sqm | 165 | ₹3,828 |
| 9 | Cement Concrete with 2c.m.gauge approved slone balliast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 0.97 | cum | 5,750 | ₹5,583.25 |
| 10 | M.S. or iron work of small sizes and section such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. Same as in item 502 above but in M.S. Grills/Stair case railing/gates/trusher/racks etc. (SOR UP PWD SI-279A) | 334.8 | kg | 61.5 | ₹20,590.2 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_2203936.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .