| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 CrAccepted-Finance | ₹12.8 Cr | L1 | Accepted-Finance Technical qualified and consequently evaluated by eprocurement site |
| 2 | L2₹13.0 CrAccepted-Finance | ₹13.0 Cr | L2 | Accepted-Finance Technical qualified and consequently evaluated by eprocurement site |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technical disqualified for non adherance of terms and condition of eNIT. |
Tender Value
Refer Docs
EMD Value
₹12.9 L
Closing Date
5 Apr 2025, 2:20 pmClosed
Executive Engineer, Sangram division, PWD
O/o Executive Engineer, Sangram division, PWD, Kurung Kumey district, Sangram
C/o Bridge over Pado river in between Parsi-Parlo to Paddo village with approach road(span-60.0m) (CMCSRDP-ll).
2025_PWDAP_2404_1
SGMD/eNIT/W-44/PTK/2024-25/001
Open Tender
Civil Works
730 days
Pado, Parsi Parlo, Kurung Kumey district, A.P
Tender fee and EMD
4 documents required · 4 mandatory
₹10,000
Executive Engineer,Sangram Division, PWD
₹12.9 L
Yes
camp office of EE Sangram div. situated at Yupia
5 Apr 2025
22 Mar 2025
5 Apr 2025
22 Mar 2025
5 Apr 2025
22 Mar 2025
22 Mar 2025 - 31 Mar 2025
31 Mar 2025
Amount
SH : I : FORMATION CUTTING=0.6km
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
SH: II: CROSS DRAINAGE
R.C.C. Box Culvert 1.00 Mtr Span - 1.50 Mtr Height = 2 Nos Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. i.Manual Means a.Depth upto 3 m
Providing and laying boulders Solling for bed for protection against scour with stone boulders weighing not less than 05kg each complete as per drawing and Technical specification.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. A.RCC Grade M30
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. A.RCC Grade M20
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification a. RCC Grade M20 , Using Concrete Mixer, Height upto 5m
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
SH:III-Protection Works
SH:- C/o R.C.C. Retaing Wall 4.00 Mtr Height=78 m Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material). I.Ordinary soil A.Manual Means i.upto 3 m depth
Dry rubble Flooring complete as per drawing and Technical specification.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. a.R.C.C. Grade M20. Case I, Using concrete mixer.
Centring and shuttering including strutting proping etc. and removal of form work for: a.Foundations and plinth.
Walls including attached buttresses, pilasters etc.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. a. Granular material
SH:- C/o R.C.C. Breast Wall 3.00 Mtr Height)=40 m Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material). I.Ordinary soil A.Manual Means i.upto 3 m depth
Dry rubble Flooring complete as per drawing and Technical specification.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. a.R.C.C. Grade M20. Case I, Using concrete mixer.
Centring and shuttering including strutting proping etc. and removal of form work for: a.Foundations and plinth.
Walls including attached buttresses, pilasters etc.
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. a. Granular material
SH:IV-Pavement(0.595 km)
Granular Sub-base (150 mm thick)=0.595 Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
Granular Sub-base with Close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) A.By Manual Means
WBM-I Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Mechanical Means: Grading- I (Using Screening Crushable type such as Moorum or Gravel), Using Screening Type-A (13.2 mm Agg.)
WBM-II Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) b.By Mechanical Means: Grading- II (Using Screening Crushable type such as Moorum or Gravel), Using Screening Type-A (13.2mm Agg.)
WBM-III By Mechanical Means: Grading- III (Using Screening Crushable type such as Moorum or Gravel), Using Screening Type-A (13.2mm Agg.)
Carpeting (DBM & BM) Prime coat Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
Dense Bituminous Macadam Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects) i. for GradingII(19 mm nominal size)
b.Tack coat Tack coat - Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 Kg per Sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
BM Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II (10 mm nominal size)
SH:V- C. C. Drain 0.60 mtr. Wide
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I.Ordinary soil A.Manual Means i.upto 3 m depth
Providing and laying boulders Solling for bed for protection against scour with stone boulders weighing not less than 05kg each complete as per drawing and Technical specification.
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications a.PCC Grade M15
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. A.In Tees, Angles and Channels
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
12mm Cement Plaster in CM..1:4..
Cement Neat Punning…..
SH:VI-Road sign board and Km. stone
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing).
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ) i.Over 10 cm in width.
SH:VII-Steel Girder Composite Bridge=01 Job
SH-1:FOUNDATION Excavation for Structures i(b)Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides and bottom and backfilling with approved material (with de-watering) a.Ordinary Soil (Mechanical Means) - Depth 3 m to 6 m
b.Ordinary rock (not requiring blasting) - Mechanical Means (Depth up to 3 m)
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. Using Batching Plant, Transit Mixer and Concrete Pump RCC Grade M 30
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per Drawing and Technical Specifications
SH:2-SUB - STRUCTURE Plain/Reinforced Cement Concretein Sub structure complete as per drawing Technical Specifications RCC Grade M 30 With Batching Plant, Transit Mixer and Concrete Pump Height 5m to 10 m
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification A.Granular Material
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel complete including all accessories as per drawing and Technical Specifications and BS :5400. section 9.1 & 9.2 (for PTFE) and clause 2004 of MoRTH Specifications.
SH:3-SUPER - STRUCTURE Furnishing and placing a reinforced / prestressed cement concrete in super- structure as per drawing and Technical Specification. C.RCC Grade M 30 Using Batching Plant, Transit Mixer and Concrete Pump i.For Solid Slab Super-structure p.Height up to 5m
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and Technical Specifications
Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-35 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
Type - B, "THRIE" : Metal Beam Crash Barrier Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Drainage Spouts complete as per drawing and Technical specification
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. (Cement Concrete M 30 Grade)
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
Supply and fabrication of steel work at fabricators workshop comprising of main griders, cross griders connecting plates, stringers,stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, decaling, degreasing cutting to size and shape drilling welding and grinding supply of all MS/HTS shop or site bolts nuts & washers, holding down bolts and nuts etc. trail assembling at workshop one priming coat of shop paint with red lead paint conforming to IS-102 with all labour material cost of paints consumables stacking in protected condition etc complete as per specification and as directed by the Engineer in charge (Carriage cost from fabricator workshop to actual bridge site will be paid separately).
Haulage of materials by mechnical transport from source (Guwahati, Assam) to Site of work including cost of loading, unloading and stacking as per direction of Engineer-in-Charge.
Taking delivery fo fabricated steel work from stacks at site as necessary assemblimg and erection at site as necessary assembling and erection of fabricated steel structure to proper line level and camber as per approved drawing complete in asll respect including transportation and handling supply of all fastener. painting of all exposed surfaces of steel work after erection with one coat or red lead conforming to IS-102 and two coats Aluminium paint to IS-2339, grouting of anchor bolts in position including all lobour consumables material machinery tools and tackles complete as per specification and as directed by the Engineer fin charge
Load Testing of Super structure of bridge after completion in all respect using static loading method to determine accpectance criteria of design as per IRC:SP:51-2015 complete as per direction of Engineer- In-Charge.
M/s Tayo Enterprises (BID ID -7184)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid