| 1 | FIRST₹22.7 LAccepted-AOC 39 SR LAYOUT MAIN ROAD NAL WING TUNNEL ROAD MURUGESH PALYA BANGALORE 560 017 | BENGALURU URBAN | KARNATAKA | 560017 | ₹22.7 L | FIRST | Accepted-AOC BEING LOWEST |
| 2 | SECOND₹2.3 CrRejected-Finance 704 SILVER DEAL DAFFODIL WING 1 B T KAWADE ROAD PUNE 411 001 | PUNE | PUNE | MAHARASHTRA | 411001 | ₹2.3 Cr | SECOND | Rejected-Finance BEING NOT LOWEST |
| 3 | Rejected-Technical | - | - | Rejected-Technical BID NOT ADMITTED DUE TO NO IN WLR QE SEP 2025 |
| Sl No | Description | Qty | Unit | GKR and CO L1 | M/S - KRUPA ELECTRICALS L2 |
|---|---|---|---|---|---|
| 1.00 | Maintenance of TROLLEY GATE at ASTE Qty -04 including checking and testing on monthly basis all the parts ie rollers , rail , motors for driving the rollers from Engineer from reputed company ,and removing the unserviceable parts of the gate and replacing / repairing the same and submitting the report to GE offfice on monthly basis all as spd and directed by Engineer in charge. Note: Unserviceable parts will be paid separately under below items | 11 | Each Job | 3,600 ₹39,600 Lowest | 9,000 ₹99,000 |
| 2.00 | Supply only rail wheels . Make as per existing | 15 | Each | 1,000 ₹15,000 Lowest | 2,800 ₹42,000 |
| 3.00 | Supply only rail of existing size including welding and making good as per existing complete all as directedby EIC | 20 | RM | 1,000 ₹20,000 Lowest | 4,200 ₹84,000 |
| 4.00 | M& L for rewinding of motor 5 HP including transportation to work shop and taking it back to site and testing and commissionimg complete all as spd and directed | 2 | Each | 9,100 ₹18,200 | 7,500 ₹15,000 Lowest |
| 5.00 | Spray painting of trolley gate alongwith motor, cover,panel of any type all as per cplour shade of MES specification after cleaning the dust particle complete all as specifed and directed by EIC | 2 | Each Job | 13,500 ₹27,000 Lowest | 17,500 ₹35,000 |
| 6.00 | Comprehensive operation and maintenance of Solar Power Plant 60 KW Routine maintenance, performnance monitoring and reporting 24/7, corrective maintenance and other services like basic maintenance, compliance with all safety regulations and standards complete all as directed by EIC | 11 | Months | 9,800 ₹1,07,800 Lowest | 10,000 ₹1,10,000 |
| 6.01Note: following services shall be include in operation and maintenance Routine Inspection and maintenance: 1. Visual inspections of solar panels, mounting structure and electrical components 2. Cleaning of solar planels to ensure maximum efficiency- max 11 cycles in the period of 11 months 3. Inspection of wiring, cables and connectors for wear and tear or any damage. 4. Maintenance of inverters,ACDB,DCDB Box ,and other critical equipment. 5. Checking and servicing of monitoring systems to ensure accurate performance data. 6. Cleaning of area (with in the boundry of solar modules area in the plant and ensureing No shadow effect on module due to tress) | |||||
| 6.02Performance Monitoring and reporting: 1. 24/7 real-time monitoring of plant performance with help of SCADA 2. Monthly performance analysis and efficiency optimization. 3. Preparation of detailed monthly and annual reports on energy production equipment status, and any incidents-will make SoP at the time of agreement | |||||
| 6.03Corrective maintenance 1. Troubleshooting and rectification of any faults or performance issues. 2. Replacement of damaged or malfunctioning components (Note: Spare parts shall be measured and paid separately) 3. Emergency response services for major breakdowns with the help of guidelines of OEM of the equipments. | |||||
| 7.00 | Taking Old unsv , Supply and installation Solar Module panel of exisiting wattage MNRE approved, alongwith miscellaneous components like termination kits, lugs, comprising of existing technical specification complete all as specified and as directed by Engineer in charge . | 3 | Each | 11,200 ₹33,600 Lowest | 25,000 ₹75,000 |
Tender Value
₹24.9 L
EMD Value
₹49,800
Closing Date
24 Dec 2025, 6:00 pmClosed
GE AF MARATHAHALLI
GE AF MARATHAHALLI WIND TUNNEL ROAD, KEMPAPURA, YEMALUR POST, BANGALORE. PIN- 560037
ANNUAL MAINTENANACE OF TROLLEY GATE SOLAR POWER PLANT AT ASTE UNDER GE (AF) MARATHAHALLI
2025_MES_742694_1
8805/E8
Open Tender
Civil Works
Item Rate
330 days
GE AF MARATHAHALLI
AS PER ENIT
7 documents required · 7 mandatory
₹500
GE AF MARATHAHALLI
₹49,800
Yes
21 Feb 2026
3 Dec 2025
30 Dec 2025
3 Dec 2025
24 Dec 2025
18 Dec 2025
Maintenance of TROLLEY GATE at ASTE Qty -04 including checking and testing on monthly basis all the parts ie rollers , rail , motors for driving the rollers from Engineer from reputed company ,and removing the unserviceable parts of the gate and replacing / repairing the same and submitting the report to GE offfice on monthly basis all as spd and directed by Engineer in charge. Note: Unserviceable parts will be paid separately under below items
Supply only rail wheels . Make as per existing
Supply only rail of existing size including welding and making good as per existing complete all as directedby EIC
M& L for rewinding of motor 5 HP including transportation to work shop and taking it back to site and testing and commissionimg complete all as spd and directed
Spray painting of trolley gate alongwith motor, cover,panel of any type all as per cplour shade of MES specification after cleaning the dust particle complete all as specifed and directed by EIC
Comprehensive operation and maintenance of Solar Power Plant 60 KW Routine maintenance, performnance monitoring and reporting 24/7, corrective maintenance and other services like basic maintenance, compliance with all safety regulations and standards complete all as directed by EIC
Note: following services shall be include in operation and maintenance Routine Inspection and maintenance: 1. Visual inspections of solar panels, mounting structure and electrical components 2. Cleaning of solar planels to ensure maximum efficiency- max 11 cycles in the period of 11 months 3. Inspection of wiring, cables and connectors for wear and tear or any damage. 4. Maintenance of inverters,ACDB,DCDB Box ,and other critical equipment. 5. Checking and servicing of monitoring systems to ensure accurate performance data. 6. Cleaning of area (with in the boundry of solar modules area in the plant and ensureing No shadow effect on module due to tress)
Performance Monitoring and reporting: 1. 24/7 real-time monitoring of plant performance with help of SCADA 2. Monthly performance analysis and efficiency optimization. 3. Preparation of detailed monthly and annual reports on energy production equipment status, and any incidents-will make SoP at the time of agreement
Corrective maintenance 1. Troubleshooting and rectification of any faults or performance issues. 2. Replacement of damaged or malfunctioning components (Note: Spare parts shall be measured and paid separately) 3. Emergency response services for major breakdowns with the help of guidelines of OEM of the equipments.
Taking Old unsv , Supply and installation Solar Module panel of exisiting wattage MNRE approved, alongwith miscellaneous components like termination kits, lugs, comprising of existing technical specification complete all as specified and as directed by Engineer in charge .
Taking Old Supply MC4 Connector complete all asa pecified and as directed by EIC
Taking down old UNSV inverter & Supply fixing testing and commissioning of Solar grid type inverter for 60 KW alongwith along with ACDB & DCDB 6 in 6 out box complete all as specified and as directed.Make : Waree/Onewave/TataBP/Luminous
Taking Old UNSV ,Supply and erection of roof mounting structure made of hot dip galvanised steel with minimum thickness of 120 microns of aluminium alloy and suitable for SPV module specified and here in after ,including bolts,nuts ,fasteners,panel mounting clamps,/aluminium alloy mounting arrangement suitable with M15 PCC (1:2:4)type B1 using 20 mm graded stone aggregate as per MNRE standards , complete all as specified and as directed by EIC
Taking Old Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 185 Sq.mm, 3½ core including taking down existing cable complete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately
Taking Old ,Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 120Sq.mm, 3½ core including taking down existing cable complete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately
Taking Old Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 70 Sq.mm, 3½ core including taking down existing cable complete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately
Taking Old Supply ,fix,testing and commissioning of 1C X 16 Sq.mm UG cable complete all as specified and as directed by EIC
Material and labour for maintenance free earth consisting of one earth pits using copper -bonded steel rods, compression couplers earth enanching compound and exothermic welding for connecting pit electrodes to strip . Each earth pit consists of 17.2mm copper bonded steel ectrodes 10ft long -01 Nos, Earth enhancing compound of 10 kg bag -5 Nos, 25mm x 2mm copper strip -7.5 mts , including inspection chamber of size 30cmx30cm Lightening arrester with necessary arrangement alongwith suitable EMC electrode complete all as specified and directed by Eng - in- Charge. Note :(1) On testing after completion of Job , if desired earth resistence (Less than 1 Ohm )is not obtained , the earthing shall be redone by the contractor without any cost to Govt. (2) The chemical earthing will be done by the manufacturer or its authorised representative on the site.
Taking Old ,Supply install testing and commissioning of 2" UPVC pipes complete all as specified and asd Directed .Note : All fittings like T Bend,L bend,Coupler,End Cap etc complete all as specified and as directed .
Taking Old Supply install testing and commissioning of 1" UPVC pipes complete all as specified and asd directed .Note : All fittings like T Bend,L bend,Coupler,End Cap etc complete all as specified and as directed .
Supply installation of Stickers - Sign Boards for All Solar Equipments complete all as specified and as diirected
Taking Old ,Supply install testing and commissioning of FRP walkway (350 mm widh x 25 mm thickness) if required some concreting work complte all as specified and as directed .
Taking Old ,Supply fixing testing & commissioning of Ladder cable tray of aluminium of size 120 x50x1.2 mm complete all as specified and as directed
Supply ABC type fire extinguisher of capacity 6 kg complete all as specified and as directed
Taking down Old UNSV,Supply pressure pump of motor power 2000W ,water flow rate 600 L/H portable type ,maximum pressure 130 bar ,of hose length 8 mtr complete all as specified and as directed by EIC
Comprehensive maintenance and servicing on once in two months basis of boom barriers of span 5.5 metre installed at VISHWA VIHAR, electrically operated, lifting type, of make : M/S NIKASH including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directed by Engr-in-Charge.
Comprehensive maintenance and servicing on once in two months basis of boom barriers of span 7.2 metre installed at ASTE, electrically operated, lifting type, of make : M/S NIKASH including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directed by Engr-in-Charge.
Comprehensive maintenance and servicing on once in two months basis of boom barriers of span 5.5 metre installed at IAM, electrically operated, lifting type, of make : M/S NIKASH including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directed by Engr-in-Charge.
Comprehensive maintenance and servicing of boom barriers of span 5.5 metre installed at 26ED, electrically operated, lifting type, of make : M/S NIKASH including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc, complete for smooth functioning all as specified and as directed by Engr-in-Charge.
Disconnection ,Supply and Fix Electronic Controller for suitable boom Barrier /Sliding gate complete all as specified and as directed by EIC
Disconnection ,Supply and Fix gate barrier of of boom of existing span of length complete all as specified and as directed .
Disconnection , Supply and Fix Wheels suitable for Sliding gate installed at 26 ED/ complete all as specified and as directed .
M/L for providing earthing with GI earth plate electrode 600 x 600 x 6.3 mm thick burried directly in ground vertically to depth of not less than 2.25 mtr deep below normal ground level with top edge of the plate not less than 1.5 mtr below ground level connected to GI earth strip of 25x4mm by means of bolts, nuts, washers of GI and provision of earth lead, GI protection pipe with 15mm light grade galvanized including necessary earth work in any type of soil, PCC 1:3:6 type CI (using 20mm graded stone aggregate) earth chamber and 1:2:4 type B1 RCC cover fitted with50mm thick with 6mm dia MS bars complete all as shown in SSR Pt - 1 electrical plate No 3. Note : Quoted rate deemed to include the cost or excavation and earth work PCC Chamber, funnel cover etc.
Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 16 Sq.mm, 4 core including taking down existing cable complete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately
Supply, laying, testing XLPE insulated screened, PVC innersheathed galvanised steel strip or wire, armoured, heavy duty LT UG electric cable with aluminium conductor, 1100 volts grade, cross-sectional area 10 Sq.mm, 4 core including taking down existing cable complete all as specified. NOTE: Excavation & Earthwork, Sand Cushioning & Cable protection shall be measured & paid seperately
Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth, not exceeding 10 sq m on plan and getting out in hard/dense soil complete all as specified.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm thick with soils.
Removal of surplus soil to a distance not exceeding 50 m and deposited where directed at a level not exceeding 1.5 m above the starting point complete all as specified.
S&F 50 mm bore GI tubing light grade including necessary fittings such as bend, tee, elbow etc complete in trenches/ on wall complete all as specified.
Supply and laying unreinforced pre cast concrete cable cover class LV type I flat size 250 x 150 x 40 mm for cable protection
Supply and spreading M-Sand in trenches for cushioning of under ground cable all as directed by Engr-in-Charge at site Note:- Only punned thickness 18 cm will be measured and paid .
Taking Old Supply, installation and testing commissioning three phase gear motor 415 volt of cap 2 HP high speed motor (motor should be fitted to master leaf) with suitable heavy grade speed reduction gear attachments for the movement of main leaf along with subsequent movement of slave leaf - 05 Nos with slave arrangement mechanism including suitable declutching facility for manual operation, the speed of door movement shall be as per international standard i.e. 7 to 8 mtr per minute for Hangar doors including removal of existing motor and handing over to MES complete all as specified and directed.
Taking Old Supply, installation and testing of VFD for controller complete all as specified and directed.
Dismantling of existing wheel assembly complete by protecting entire door without any damages and replace with heavy duty wheel made out of MS embedded with ball bearing complete all as specified.(HN10,HN11)
Taking Old Supply, installation and testing of control panel indoor type for operation of suitable starters locally and remote control alongwith indication lamps and multifunction meter, push buttons and single phase preventer complete all as specified and directed.
Taking Old Supply, installation and testing of 4 core 2.5 sqmm sheathed copper cable alongwith guide wire and rails complete all as specified and directed.
Taking Old Supply, installation and testing of limit switch heavy duty complete all as specified and directed.
Maintenance and servicing of Sliding gate electrically operated including repairs and servicing of electrical motor, fly wheel, pinions, clutch plates, limit switch, control cables, switch gears and replacement of oil etc., installed at 26 ED(AF) complete for smooth functioning all as specified and as directed by Engr-in-Charge. Note : All the minor parts like flywhell pinions,clutch plate,limit switch ,control cables if required need to be change inclusive in the above rate quoted.
Disconnection , Supply and Fix Wheels suitable for Sliding gate installed at 26 EDcomplete all as specified and as directed .
Taking down ,Supply,Fixing ,Testing & Commissioning Smart ,Solar LED street light (All in One)(24 W)with following specifications Battery Lithium ion of capacity 28.6AH 11.1 V ,Autonomy 42 Hrs ,LED 48 ,pole height 8 mtrs ,solar charging time 5-6 hrs ,Lighting time 24 hrs ,Body fibre reinforced plastic,Protection IP 65,Sensor PIR motion ,Work temperature -10 degree celsuis to +55 degree celsius ,Light Source W-LED ,Cplour temperature 5500-6500 K,Light Output 180 lm/watt ,Duty cycle dusk to dawn,PV Module (Wp)under STC 55 Wp,PV module chemistry -monocrystalline ,PV module efficiency 17 %, etc complete all as specified an as directed by EIC
Taking down Old Supply testing and commissioning of CS 250 Energizer with hooter complete all as specified and as directed
Taking down Old Supply testing and commissioning of Fence lite comple
te all as specified and as directed
Taking down Old Supply testing and commissioning of 12V 65AH Battery complete all as specified and as directed
Taking down Old Supply testing and commissioning of charge controller complete all as specified and as directed
Taking down Old Supply intermediate post Kwitah/T angular 5 feet length with square post duly galvaniized complete all as specified and as directed
Taking down Old Supply end corner post 40 mm SQ galvanised post of 5 feet length complete all as specified and as directed
Taking down Old Supply support post of 25 mm dia galvanised post of 5 feet length complete all as specified and as directed
Taking down Old Supply fixing of breakway insulators complete all as specified and as directed
Taking down Old Supply fixing of endstrain insulators complete all as specified and as directed
Taking down Old Supply fixing of S Hook complete all as specified and as directed
Taking down Old Supply fixing of joint Clamps complete all as specified and as directed
Taking down Old Supply fixing of flat wire tightener complete all as specified and as directed
Taking down Old Supply testing and commissioning of HT wire 2.59 mm -12 G complete all as specified and as directed
Taking down Old Supply double insulated cable 2.5 sqmm all as specified and as directed
Taking down Old Supply warning sign board all as specified and as directed
Taking down Old Supply Earthing kit all as specified and as directed
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_831672.xls
BOQ • 3.10 MB
TENDER.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .