Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹14.3 CrAccepted-AOC PLOT NO 43 INDUSTRIAL AREA PHASE 2 PANCHKULA HARYANA | PANCHKULA | PANCHKULA | HARYANA | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹14.5 Cr+₹21.9 L (1.53%)Accepted-AOC | L-2 | Accepted-AOC L-2 | |
| 3 | L-3₹16.5 Cr+₹2.2 Cr (15.4%)Accepted-AOC | L-3 | Accepted-AOC L-3 |
Tender Value
₹17.0 Cr
EMD Value
₹17.3 L
Closing Date
13 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Exectuive Engineer Jal Shakti Division Nadaun
Exectuive Engineer Jal Shakti Division Nadaun
Providing House Hold connections by Ministry of Jal Shakti Har GharNal Se Jal for Multi Villages under JSV Galore Distt. Nadaun
2022_HPIPH_64274_1
Online NIT No. 2072-2122
Open Tender
Civil Works
Item Rate
120 days
Nadaun
SHExcavation, P,L and Jointing and testing of MSREW,GI pipes for rising mains, S,E Submersible Centrifugal pumping machinery and automation of the project and CO Anchor blocks.
9 documents required · 9 mandatory
₹2,500
EE JSD Nadaun
₹17.3 L
Chief Engineer(HZ) Jal Shakti Vibhag Hamirpur HP
18 Mar 2023
30 Aug 2022
13 Sept 2022
30 Aug 2022
13 Sept 2022
30 Aug 2022
30 Aug 2022 - 13 Sept 2022
7 Sept 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule A1 -Pumping Machinery and Electrical works | - | - | - | - |
| 2 | Supply of star rated enrgy efficient submersible pumping set of KSB/Calama/ Johnston/ Crompton/BS/ SABAR/ Oswal/ Kirloskar/WPIL make conforming to latest relevant BIS Code 8034:1976. The pump should be fitted with bronze impeller or suitable alloys suitable for handling Clear water having greased packed bearings and shaft with wound stator on motor side and with soft protection sleeve on pump side ensuring better life for shaft coupled to a submersible squirrel cage electric induction motor (water proof type) of required HP & 2900 rpm of reputed make conforming to BIS 9283-1979 latest with upto date amendments, totally dust and water proof for submersible duty isolated from the pump by intermediate casing with double mechanical seal in oil chamber and grease packed lubricated bearings and provided with stainless steel thrust bearing plate to with stand non vertical loads with minimum wear and tear. It should also be fitted with a device to take up expansion of water with the heating of motor. The pump set should include water level guards, erection clamps , cable clips, depth gauge NRV & Sluice valves of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in – Charge. The rates shall be for complete Job to run the machinery in proper working. and should meet with the requirements. (Ist stage). The cost of stepdown transformer alongwith all its accessories such as cables, panels etc. shall be part of the offer including standby arrangement, the rate shall be quoted with per set rate of pumping machinery. The HP are indicative.Since the re-survey and re-design of proposal/scheme is to be carried out by the lowest bidder, the design/drawings so approved by the competent authority after finalisation of design and drawings,any variation in HP and other accessories etc.The rate shall be worked out on prorata basis after approval of the competent authority and payment will be made accordingly. For detailed design parameters/ requirements are given in (Refer Technical specification & Data sheet No. 1) | - | - | - | - |
| 3 | Booster stage:- 4 sets (2 working & 2 standbye) | - | - | - | - |
| 4 | PW1 to Sump (7.65 LPS with Head of 40.23 m - 2 sets | 2 | P/Set | - | - |
| 5 | PW2 to Sump (7.65 LPS with Head of 41.63 m - 2 sets | 2 | P/Set | - | - |
| 6 | PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated enrgy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/double/multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/KSB/Kirloskar/Jyoti /Beaconweir BS&BE, ABB/CGL confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor, totally enclosed fan cooled motors/CACA motors of standard make such asKirloskar/BHEL/ Crompton/NGEF/GEC/Siemens/ Jyoti/Area Brown Boven and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15% of the duty point head. The motor/motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. | - | - | - | - |
| 7 | The motor shall be suitable of running at 415 volt+ - 15 volt atleast. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement (as per data sheet No. 13) including Pump sets (working + standby), All electrical equipments such as Starter, ICTP switches, MCB, Bush bar chamber, MCB, Panel board indicating lamps, Ammeter, Voltmeter, Hour run meter should be of electronic type , incoming and outgoing water proof cable for panel board, Double loop earthing, copper cable pressure gauge, capacitor, common header, sluice valve, NRV including erection and testing complete necessary piping for suction and common header and control valves alongwith electrical works including all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc. including specials and wastage etc.; complete as per Tender Specifications and instruction of Engineer in charge. The cost of stepdown transformer alongwith all its accessories such as cables, panels etc. shall be part of the offer including standby arrangement, the rate shall be quoted with per set rate of pumping machinery. The HP are indicative.Since the re-survey and re-design of proposal/scheme is to be carried out by the lowest bidder, the design/drawings so approved by the competent authority after finalisation of design and drawings,any variation in HP and other accessories etc.The rate shall be worked out on prorata basis after approval of the competent authority and payment will be made accordingly (Refer -Technical specification & Data sheet No. 2) | - | - | - | - |
| 8 | PH-1,Kohla to Sump well -2 Kashmir) - 3 sets (2 working & 1 standbye) of 7.66 LPS each with total Head 423.28 m. | 3 | P/Set | - | - |
| 9 | PH-2 Kashmir to MBR-Naraintal) - 3 sets (2 working & 1 standbye) of 7.66 LPS each with total Head 354.97 m. | 3 | P/Set | - | - |
| 10 | Schedule A2 - Rising Main | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_96777.xls
BOQ Document • 0.28 MB
104310773.pdf
Tender Document • 0.32 MB
104310775.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .