| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.9 L+₹1,496.71 (0.19%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A.PONNARASU L1 | INIYA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Construction of 10000 Litre OHT (7.5m Stage) at West Pananthoppu H/O Ramanaickenpalayam Panchayat | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B | 42.53 | cum | 246.5 ₹10,483.65 Lowest | 250 ₹10,632.5 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 5.55 | cum | 1,698 ₹9,423.9 Lowest | 1,700 ₹9,435 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete | 2.77 | cum | 5,322 ₹14,741.94 Lowest | 5,330 ₹14,764.1 |
| 5.00 | Reinforced cement concrete 1:1:5:3 mix using 20mm ISS Metal inculding cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete Item 1.50 m to below GL | 5.88 | Cum | 9,001 ₹52,925.88 Lowest | 9,010 ₹52,978.8 |
| 6.00 | 0.00 to 1.50m Below GL | 1.03 | cum | 9,001 ₹9,271.03 Lowest | 9,010 ₹9,280.3 |
| 7.00 | 0.00 to 4.50m from GL | 2.11 | cum | 9,131 ₹19,266.41 Lowest | 9,150 ₹19,306.5 |
| 8.00 | 4.50 to 7.32m from GL | 2.48 | cum | 9,261 ₹22,967.28 Lowest | 9,300 ₹23,064 |
| 9.00 | 7.32 to 10.98m from GL | 4.72 | cum | 9,522 ₹44,943.84 Lowest | 9,530 ₹44,981.6 |
| 10.00 | Supplying and erecting centering shuttering inculding necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, roof slabs, staircase stpes, bed blocks, critical Plane Surface | 10.92 | sqm | 1,033 ₹11,280.36 Lowest | 1,040 ₹11,356.8 |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
29 Jul 2024, 3:00 pmClosed
BDO VP Attur
BDO Office Taluk Office Campaus Attur
Construction of 10,000 Lit OHT (12.00m Stage) at West Pananthoppu H/O Ramanaickenpalayam Panchayat Attur Block at Salem District NABARD RIDF XXIX 2024-2025 Work No.11
2024_RDTN_465466_1
Roc No.3331/2023/T1-NABARD-W.No.11
Open Tender
Civil Works
Fixed-rate
90 days
Block Development Office Attur
As Per Tender Documents
3 documents required · 3 mandatory
₹0
₹8,500
BDO Office Attur
26 Sept 2025
24 Jul 2024
29 Jul 2024
24 Jul 2024
29 Jul 2024
24 Jul 2024
24 Jul 2024
Amount
Construction of 10000 Litre OHT (7.5m Stage) at West Pananthoppu H/O Ramanaickenpalayam Panchayat
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Reinforced cement concrete 1:1:5:3 mix using 20mm ISS Metal inculding cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete Item 1.50 m to below GL
0.00 to 1.50m Below GL
0.00 to 4.50m from GL
4.50 to 7.32m from GL
7.32 to 10.98m from GL
Supplying and erecting centering shuttering inculding necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, roof slabs, staircase stpes, bed blocks, critical Plane Surface
From GL to 3.30m
From 3.30 to 4.30m
From 6.30m to 7.30m
Square Coloumns
BGL & upto 3.30m
Curved surface
Supplying and fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given inculding cost of steel and binding wire in all floors etc., complete complying with standard specification Up to 16 mm dia
Painting two coats over new plastered using approved cement paint inculding cost and onveyance of all materials to site and all labour charges etc complete
Supplying, fabricationg, Delivery and placing in position MS steel ladder wide 0.45m made out of 50x50x6mm MS angle for sides and stps in 16mm MS plain rods fixed at 30cm c/c welded and jointed etc., complete
Providing and fixing of RCC inner access ladder in RCC 1:11/2 :3 (one cement,one and half sand and three aggregate) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centring,shuttering charges, mixing concrete,curing etc. to required height and clear width of 45 cm consisting of 2 nos. of vertical post of 10 cm x 15 cm and step slab of 25mm x 25mm etc.complete and as directed by TWAD Board Officers.
Supplying and fixing of 110mm PVC vent cowl
Providing Manhole cover of size 0.60x0.60m in RCC 1:11/2:3 mix with suitable reinforcement and 50x50x6mm MS angle fixed along edges and as directed by Department officers
Supply and fixing of cut stone of size 0.30m x 0.30m x 0.15m in CM 1;3(one cement and three sand) below inlet pipe for Service Reservoir as directed
50mm dia GI pipes for inlet connection
50mm dia GI Elbow
50mm dia GI Coupling
50mm dia GM Gate valve
50mm dia Flange set
Earth work excavation for foundation
63 mm dia od pvc -4ksc pipes for delivery line
Supply and delivery of 63mm rigid Pipe and GI pipe as per ISI Marked Standarad specification.
Refilling the excavated earth as per the standard specifications
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers
Earth work excavation and deposting on bank with an initial lead of 10m & lift of 2m for pipe laying works with standard trench width and depth etc., complete
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conbeyance of all materials to site and all labour charges etc complete
Filling the soak pit with 225 mm boulders as per specification
Filling the soak pit with 40mm metal as per specification
Filling the soak pit with 20mm metal as per specification
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete
Supplying and fixing P.V.C down fall pipe of 110m dia with necessary shoes, bends,& clamps etc.,
Supplying and fixing of RCC rings 750mm dia for Leach pit including all charges etc complete
Casting and fixing of RCC precast slab of 75mm thick 1:2:4 using 20mm HBG jelly
Supplying and fixing of cover slab of 750mm dia including all charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
INIYA CONSTRUCTIONS (BID ID -1093529)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .