Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.7 LRejected-Finance | L-1 | Rejected-Finance ...... | |
| 2 | L-2₹4.7 L+₹945 (0.20%)Rejected-Finance | L-2 | Rejected-Finance ..... |
| Sl No | Description | Qty | Unit | M/S Harendri Devi L2 | LANDMARK INFRA PROJECTS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work cutting/filling for making roaad diversion and removing and all type of soil including lead upto 1.0km and lift 1.50m with proper dressing an ramming etc | 210 | CUM | 204.5 ₹42,945 | 200 ₹42,000 Lowest |
| 2.00 | Supply & fixing of caution/Informatory board with Painting and writting as per direction of Engineer in charge including cost of all material labour and T&P complete | 1 | Nos | 5,000 ₹5,000 Lowest | 5,000 ₹5,000 Lowest |
| 3.00 | Dismentling of old Brick work of VRB and disposal with in 60 m. including cost of all labour and T&P complete | 5.57 | CUM | 1,200 ₹6,684 Lowest | 1,200 ₹6,684 Lowest |
| 4.00 | E/W in excavation of foundation in all type of soil including all initial Lead and lift etc. | 54.35 | CUM | 68 ₹3,695.8 Lowest | 68 ₹3,695.8 Lowest |
| 5.00 | Cement concrete 1:3:6 in cement, coarse sand and stone ballast mixing & laying in foundation including cost of all material labour and T&P complete | 16.99 | CUM | 5,653 ₹96,044.47 Lowest | 5,653 ₹96,044.47 Lowest |
| 6.00 | Brick work in 1:4 cement, course sand mortar and M-150 Brick including cost of all material labour and T&P complete | 41.35 | CUM | 4,513 ₹1,86,612.55 Lowest | 4,513 ₹1,86,612.55 Lowest |
| 7.00 | Cement pointing struck deep in 1:2 cement fine sand mortarincluding cost of all material labour and T&P complete | 32.41 | SQM | 151 ₹4,893.91 Lowest | 151 ₹4,893.91 Lowest |
| 8.00 | Centering & shuttering for RCC work in slab & bed block etc including cost of all material labour and T&P complete | 24.62 | SQM | 544 ₹13,393.28 Lowest | 544 ₹13,393.28 Lowest |
| 9.00 | Providing and laying Reinforcement Cement concrete M20(1:1.5:3) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete. | 5.06 | CUM | 6,835 ₹34,585.1 Lowest | 6,835 ₹34,585.1 Lowest |
| 10.00 | C.C. work in 1:1.5:3 in wearing coat on top of slab including cost of all material labour and T&P complete | 1.33 | CUM | 6,392 ₹8,501.36 Lowest | 6,392 ₹8,501.36 Lowest |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
1 Apr 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE,BDGC,BSR
EE,BDGC,BSR
Re-Construction of VRB at km. 3.200 Right Bhataula Drain.
2021_UPIDC_576976_50
13/EE/20-21
Open Tender
Civil Works - Canal
Fixed-rate
30 days
Bulandshahr
Re-Construction of VRB at km. 3.200 Right Bhataula Drain.
4 documents required · 4 mandatory
₹177
₹47,000
30 Oct 2025
27 Mar 2021
1 Apr 2021
27 Mar 2021
1 Apr 2021
27 Mar 2021
90 days
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .