Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.8 LAdmitted-Fee/PreQual/Technical/Finance AT BELTIKIRI SADAR DHENKANAL | -0.01% | ₹48.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹48.8 LAdmitted-Fee/PreQual/Technical/Finance AT BELTIKIRI SADAR DHENKANAL | -0.01% | ₹48.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹48.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹48.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹48.8 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹48.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹48.8 LAdmitted-Fee/PreQual/Technical/Finance AT BELTIKIRI SADAR DHENKANAL | -0.01% | ₹48.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹48.8 L
EMD Value
₹48,771
Closing Date
19 May 2026, 5:30 pmClosed
Superintending Engineer (Agril.), NZ, Sambalpur
Superintending Engineer (Agril.), NZ, Sambalpur, At/Po-Remed, Dist-Sambalpur, Pin-768006
Construction of Farm Machinery hub at RRTTS, Mahisapat in Dhenkanal Distrct
2026_AGRIL_128989_6
01/Agril. / NZ / 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
150 days
Dhenkanal
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Superintending Engineer (Agril.), NZ, Sambalpur
₹48,771
Yes
11 Jun 2026
11 May 2026
22 May 2026
11 May 2026
19 May 2026
11 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Site cleaning, cutting of bushes and removal of debris from the work site and layout of the project with help of unskilled labourers | 10 | Mandays | 452 | ₹4,520 |
| 2 | Excavation of foundation in hard soil within 50 m initial lead and 1.5 m initial lift including rough dressing and levelling as per the direction of engineer in charge | 122.33 | cum | 268.22 | ₹32,811.35 |
| 3 | Filling foundation and plinth with sand well watered and rammed including cost and conveyance of materials. | 449.33 | cum | 940.33 | ₹4,22,518.48 |
| 4 | C.C.(1:3:6) with 40 mm. size h.g. metal in F & P. | 54.24 | cum | 6,495.72 | ₹3,52,327.85 |
| 5R.C.C. work M-20 grade using 20mm and 10mm size black hard crusher broken granite chips including hoisting lowering laying and centring shuttering including cost, conveyance, royalties and cost of all materials and labour with T & P required for the work etc. complete in all respect as directed by the Engineer – in charge. | |||||
| 6 | Column base | 26.06 | cum | 7,064.05 | ₹1,84,089.14 |
| 7 | Plinth band | 17.85 | cum | 7,064.05 | ₹1,26,093.29 |
| 8 | Lintel | 2.87 | cum | 14,601.65 | ₹41,906.74 |
| 9 | Chajja | 0.47 | cum | 7,518.73 | ₹3,533.8 |
stage.html
html • 0.04 MB
finance_590258.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
DTCN.pdf
Tender Documents • 0.75 MB
BOQ_590258.xls
BOQ • 0.35 MB
Corrigendum.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .