Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC JHAJJAR | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.4 L+₹3.3 L (36.0%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical NEAR JUI CANAL VILLAGE SUKHPURA TEHSIL DISTT BHIWANI | BHIWANI | BHIWANI | HARYANA | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.6 L
EMD Value
₹21,214
Closing Date
31 Mar 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Xe, LWS Division, Loharu
Xe, LWS Division, Loharu
Construction of out of norm VR bridge at RD 102750 Sorra Disty.
2022_HRY_214331_2
2885-2904/16A dated 22.03.2022
Open Tender
Civil Works
Works
90 days
Loharu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹21,214
Yes
13 Jun 2022
26 Mar 2022
1 Apr 2022
26 Mar 2022
31 Mar 2022
26 Mar 2022
90 days
Amount
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and of other deleterious matter, dressing of sides and bottom and backfilling with approved material as per clause 304 of MORT&H specifications Ordinary soil, up to 3.0 m depth by mechanical means (HSR 15.1.2.1)
Brick work in 1:4 (1 cement 4 course sand ) mortar with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth complete as per HSR 7.21.1)
Provinding and laying in position ready mixed plain cement concrete M-15, with cement content as per approved design mix andmanufactured in fully automatic batching plant and transported to site of woek in transit mixer for all leads, having continuousagitated mixer, manufactured as per mix design of specifiedgrade for plain cement concrete work, including pumping of RMC form transit mixer to site of laying and curing excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, improve woekabilitywithout impairing strenght and durability as per direction of the Engineer-in-charge.( Note - Less cement used as per desing mix is recoverable. However no extra payment shal be made if excess grade plain cement concrete (cement content considered@ 240 kg/cum) as per HSR No. 6.22.1.2
Provinding and laying I position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching lant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cemnt concrete work, incliding pumping of RMC form transit centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and furability as per direction of the Engineer-in-charge. All works above plinth level up to floor IV level as per HSR item No. 6.25.1
steel reinforcement of thermo mechanically threaded bars of graded Fee-500D for RCC work where not included in the omplete rate of RCC i/c straightening, cutting bending, placing in position, binding, wastage, overlaps welded joints, spacer bars, chairs, stays, hangers and annealed steel wires etc. complete in all respect above plinth level as per HSR 6.33.6
Centering and shuttering i/c strutting, proping and removal of form work for foundation, footing and bases of colomns etc, complete as per HSR 6.29.1
Centering and shutteing includign strutting, propping etc. And removal of form work for Retaining walls, return walls, i/c atached pilasters, buttresses, plinth and string courses, fillet kerbs and steps etc as per HSR 6.29.3
Centering and shuttering i/c strutting, proping and removal of form work for roof, landing etc, complete as per HSR 6.30.3
Filling expansion joints, with special impervious hot pour, 12.5 mm wide as per HSR 14.18
Dismantling of brick masonry laid in cement sand mortar manually by mechanical means i/c stacking serviceable materials and disposal of unserviceable material with in 50 mtr lead or as per direction of engineer incharge complete as per HSR 5.7.4
Credit for old brick masonry
ANOOP YADAV
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .